Specifying HVAC systems for new, existing office buildings

Office buildings might seem like simple structures from the outside, but engineers engaged in such projects know they can be highly complex, with specialized HVAC, indoor air quality, and other air movement needs.

10/31/2013


J. Patrick Banse, PE, LEED AP, Senior mechanical engineer, Smith Seckman Reid, Houston. Courtesy: Smith Seckman ReidRobert Ioanna, PE, LEED AP, Vice president, Syska Hennessy Group, New York City. Courtesy: Syska Hennessy GroupDouglas Lacy, PE, LEED AP BD+C, Senior associate, ccrd partners, Dallas. Courtesy: ccrd partners

Respondents:

J. Patrick Banse, PE, LEED AP, Senior mechanical engineer, Smith Seckman Reid, Houston

Robert Ioanna, PE, LEED AP, Vice president, Syska Hennessy Group, New York City

Douglas Lacy, PE, LEED AP BD+C, Senior associate, ccrd partners, Dallas


CSE: What unique requirements do office building HVAC systems have that you wouldn’t encounter on other structures?

Syska Hennesy Group’s ongoing projects include the Busan Lotte Town Tower in Busan, South Korea. Photo: Skidmore, Owings & Merrill LLPLacy: The system types used in office buildings tend to be fairly similar to those in other building types. However, the cost model and ROI for office properties is much shorter than that of institutional clients. Therefore, we have seen clients requesting more sustainable system features to reduce overall energy consumption, but within the same construction budget as their previous projects. Many office building budgets have not been prepared to accept the cost of premium associated with systems such as airside energy recovery or a move away from direct exchange (DX) or other air-cooled equipment.

Ioanna: Office buildings pose a unique requirement in that there are multiple times per year where both heating and cooling are required simultaneously. Very often the south perimeter and the interior zones of the building require cooling, while the rest of the perimeter spaces require heating. Sizing and selecting HVAC systems in an energy-efficient manner while maintaining indoor comfort becomes the design challenge.

Banse: System design that allows actual metering of services such as electrical, chilled water, domestic water, and air capacity used on a floor-by-floor or a tenant-by-tenant basis. It seems that space leases are getting more restrictive, and anything to help identify actual costs based on utility use is becoming part of the negotiation.

CSE: How can automated features and remote system control benefit office-building clients?

Banse: Being able to monitor and control the HVAC system through the BAS remotely with appropriately controlled access can be a huge benefit to an owner or facility manager. This method allows a building manager to deal with tenant issues or complaints quickly and direct staff to resolve or mitigate potential problems. Of course, the system has to be accurate to start with. We have encountered some that gave false readings indicating all airflows were within operating limits, but in actuality there was no flow and the space was overheating.

Lacy: Automated features allow facilities to move away from on-site maintenance staff for day-to-day operational needs. Working with the client to develop a good control sequence can provide robust and stable operation for a wide range of weather and space conditions. Remote system control can allow a multi-site building operator to centralize facility monitoring and controls. The remote staff can then help troubleshoot technical issues from much farther distances. Automated features also allow for the use of a third-party service corporation for maintenance in lieu of direct labor for the same duties. This can be advantageous to a property owner depending on its cost model.

CSE: What is the most important indoor air quality (IAQ) issue you typically encounter in these projects, and how do you address it?

Ioanna: One of the most common issues that cause IAQ issues revolve around the initial cleaning and quality of the air post-construction. The odors/contaminants tend to linger for a long time unless specifically addressed prior to construction completion. In order to address this, we specify requirements for air changes and filter changes prior to occupying the space. The second issue comes from operators locking out outdoor air control systems post-construction. This seems to happen when the building operators become frustrated by the level of sophistication of the system or by the lack of commissioning to verify it’s operating properly. We advise owners to commission their buildings in all four seasons and also retro-commission every 3 to 5 years. We also design the outside air control strategies as simple as possible so building operators feel comfortable and confident about the systems in place.

Lacy: Delivering the appropriate ventilation air quantities and removing unwanted odors are the most important. While deploying carbon filtration banks can mitigate most odor challenges, proper placement of roof-mounted equipment and consideration of prevailing wind patterns can help to avoid cross-contamination between exhaust and outdoor air streams. Analyzing the equipment placement beyond mere adherence to code minimum standards is important.

Banse: Several issues come to mind, such as proper filtration, delivery of properly conditioned air, maintenance of required pretreated outside air rates, and minimizing the infiltration of untreated outside air. Of these, maintaining clean air and the proper quantity of ventilation air will mitigate the other two. A good BAS set up along with trained staff helps ensure these goals can be met.

CSE: Describe any unique ventilation challenges you’ve overcome.

Ioanna: New corporate workplace policies implemented by our clients have placed an emphasis on maximizing real estate space. Thus architects are "dense packing” more people onto floor plates than in years past. They are placing more people in smaller spaces that are requiring higher amounts of outside air while increasing load densities. Higher amounts of outside air raise HVAC operation cost. The opportunity becomes how to minimize the outside air while maintaining acceptable indoor air quality conditions. We have used various CO2 monitoring and control strategies to minimize outside by modifying outside air damper and variable air volume (VAV) damper positions in concert with modifying supply temperatures and consequently fan speed.

Banse: Some of the unique challenges involved using large existing exhaust fans and large pretreated outside air units originally designed for 500,000 sq ft or more, but having the need to only serve 15% or so of finish-out space initially. Trying to use the fans for much smaller air quantities and have them operate within their stable points of operation created a challenge, not only operationally, but also in how to avoid using unnecessary energy to accomplish the task while making the systems balanceable. One method used was to allow the discharge air to recirculate to the fan inlet to create needed airflow for the fan. This project is still in the balancing stage with good results anticipated.



The Top Plant program honors outstanding manufacturing facilities in North America. View the 2015 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
Each year, a panel of Control Engineering and Plant Engineering editors and industry expert judges select the System Integrator of the Year Award winners in three categories.
Doubling down on digital manufacturing; Data driving predictive maintenance; Electric motors and generators; Rewarding operational improvement
2017 Lubrication Guide; Software tools; Microgrids and energy strategies; Use robots effectively
Prescriptive maintenance; Hannover Messe 2017 recap; Reduce welding errors
The cloud, mobility, and remote operations; SCADA and contextual mobility; Custom UPS empowering a secure pipeline
Infrastructure for natural gas expansion; Artificial lift methods; Disruptive technology and fugitive gas emissions
Mobility as the means to offshore innovation; Preventing another Deepwater Horizon; ROVs as subsea robots; SCADA and the radio spectrum
Research team developing Tesla coil designs; Implementing wireless process sensing
Commissioning electrical systems; Designing emergency and standby generator systems; Paralleling switchgear generator systems
Natural gas engines; New applications for fuel cells; Large engines become more efficient; Extending boiler life

Annual Salary Survey

Before the calendar turned, 2016 already had the makings of a pivotal year for manufacturing, and for the world.

There were the big events for the year, including the United States as Partner Country at Hannover Messe in April and the 2016 International Manufacturing Technology Show in Chicago in September. There's also the matter of the U.S. presidential elections in November, which promise to shape policy in manufacturing for years to come.

But the year started with global economic turmoil, as a slowdown in Chinese manufacturing triggered a worldwide stock hiccup that sent values plummeting. The continued plunge in world oil prices has resulted in a slowdown in exploration and, by extension, the manufacture of exploration equipment.

Read more: 2015 Salary Survey

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.
The maintenance journey has been a long, slow trek for most manufacturers and has gone from preventive maintenance to predictive maintenance.
Featured articles highlight technologies that enable the Industrial Internet of Things, IIoT-related products and strategies to get data more easily to the user.
This digital report will explore several aspects of how IIoT will transform manufacturing in the coming years.
Maintenance Manager; California Oils Corp.
Associate, Electrical Engineering; Wood Harbinger
Control Systems Engineer; Robert Bosch Corp.
This course focuses on climate analysis, appropriateness of cooling system selection, and combining cooling systems.
This course will help identify and reveal electrical hazards and identify the solutions to implementing and maintaining a safe work environment.
This course explains how maintaining power and communication systems through emergency power-generation systems is critical.
click me