Making mixed-use buildings sustainable

Engineering mixed-use buildings is a fine art—specifiers must combine multiple engineered systems for several business and residence types into one structure. Many building owners demand sustainable, energy-efficiency buildings.

09/16/2013


Robbie Chung, PE, LEED AP, Senior associate, Environmental Systems Design Inc., Chicago. Courtesy: ESDRaymond Holdener, PE, Senior associate, Dewberry, Fairfax, Va. Courtesy: DewberryAndrew Lasse, PE, LEED AP, Associate principal/senior mechanical engineer, Interface Engineering, Portland, Ore. Courtesy: Interface EngineeringGary Pomerantz, PE, LEED AP, Executive vice president, building systems, WSP, New York City. Courtesy: WSP GroupJohn Sauer, PE, LEED AP, Senior director, BSA LifeStructures, Indianapolis. Courtesy: BSA LifeStructuresLeJay Slocum, Assistant director, Atlanta regional office, Aon Fire Protection Engineering Corp., Suwanee, Ga. Courtesy: Aon Fire Protection

Participants:

Robbie Chung, PE, LEED AP, Senior associate, Environmental Systems Design Inc., Chicago

Raymond Holdener, PE, Senior associate, Dewberry, Fairfax, Va.

Andrew Lasse, PE, LEED AP, Associate principal/senior mechanical engineer, Interface Engineering, Portland, Ore.

Gary Pomerantz, PE, LEED AP, Executive vice president, building systems, WSP, New York City

John Sauer, PE, LEED AP, Senior director, BSA LifeStructures, Indianapolis

LeJay Slocum, Assistant director, Atlanta regional office, Aon Fire Protection Engineering Corp., Suwanee, Ga.


CSE: What cutting-edge energy efficiency systems have you recently worked on in mixed-use buildings? What design aspects or products were included?

Sauer: At Purdue University’s Health and Human Sciences Building, BSA LifeStructures’ design team used a dedicated outdoor air system (DOAS) and heat recovery wheel to achieve energy savings. This lead to a 29% energy reduction compared to ASHRAE 2007-90.1. The design also incorporates LED lighting for the facility’s 850-space parking garage, which contributes a 48% savings (comparison by fixture) in energy over metal halide. In addition the design uses a control scheme that monitors the lighting level in the garage and adjusts the LED lighting output to meet predetermined levels. Less lighting energy is used when more ambient light from outside is available. The design team also installed occupancy sensors to reduce the lighting levels to threshold levels in certain areas of the garage when unoccupied.

Pomerantz: In areas that are always in the cooling mode, we have used the rejected heat from the cooling system for many uses. These uses include domestic hot water production and free reheat.

For The Avenue, a mixed-use development in Washington, D.C., Dewberry provided mechanical, electrical, and plumbing engineering for the 10-story 460,000-sq-ft office building, as well as a 450,000-sq-ft parking structure and central courtyard at 2200 PennHoldener: We have used cisterns to capture rainwater to use for irrigation and/or cooling tower makeup water. The cooling towers, when used in projects, require a substantial amount of makeup water. For some reason, cooling tower makeup water is often overlooked. The majority of the cistern water will be used for the cooling tower makeup water. We have examined using other energy-efficient systems, such as photovoltaics (PV), but the cost of these systems was not seen as viable for the projects.

Lasse: We recently installed a split system fan coil system in the residential units of a mixed-use project in Portland, Ore., that had a unique twist. The fan coils include a hot water coil that used the domestic hot water system as its heat source. What was great about this was that we were able to eliminate a set of pumps by using the domestic hot water recirculation pumps to distribute the hot water to units and fan coils, and ran the hot water loop at a lower temperature to capitalize on higher boiler system efficiencies. This solution also saved the up-front cost of routing a separate heating water system throughout the building, as we simply tied into the domestic hot water infrastructure already in place. 

CSE: Have you had experiences with PV, wind turbine, or other renewable energy? If so, please describe.

Holdener: We have examined using these systems on multiple projects including an analysis for the Federal Bureau of Prisons where we looked at photovoltaic, wind turbine, nuclear power, hydrogen fuel cells, as well as other technologies. Depending on where a facility is located will determine which systems are beneficial and how quick the payback may be.

Pomerantz: We have used photovoltaic systems on many buildings. Given the current levels of government subsidies in many locales, there is a beneficial payback. It has been difficult to financially justify these systems without government incentives. Solar thermal to generate hot water usually has a desirable payback without subsidies. It is relatively inexpensive and operates at high efficiencies. Space is required for the panels and for the water storage tanks. The location of the panels must be coordinated with the architecture of the building. The use of solar thermal does not do away with conventional hot water systems in most places in the world, except for those spaces where it is always sunny or it is not critical to have hot water all of the time. 

CSE: For new buildings, are clients requesting LEED certification, and at what level?

Sauer: I have found that many clients are requesting LEED level design, but some might not care as much about actually becoming certified. It seems that clients are expecting new buildings to meet a minimum threshold of sustainability without having to follow through with the entire LEED process.

Chung: In my experience, clients have always desired to achieve some level of LEED certification. At the same time, there’s the same desire to get an early understanding what the cost would be for LEED implementation in order to have an informed decision as to how to move forward. This follows with the internal negotiation of what LEED certification is worth the added expense to the project. The client needs to be well-informed so the proper LEED certification level matches the building usage(s). For example, natural challenges exist for facilities such as a shell and core office or a residential building where savings on the lighting power density are exempt. Another example is water savings from low-flow fixtures such as a low-flow shower, which may be more of a challenge to implement within a residential building where the tenants may be more likely to complain as opposed to an office environment where a low-flow shower isn’t a concern. Overall, a client’s desires will always be for a sustainable facility that typically leads to energy savings, but they need to be educated on the associated cost and impacts of potential points on each certification level.

Holdener: For almost all new buildings, mixed-use and other types, clients are requesting LEED certification due to either their own project requirements or those mandated by the local government. Most of the mixed-use projects with a residential component are targeting Silver, with some going for Gold and others simply Certified. Nonresidential projects are generally targeting LEED Gold or Platinum.

Lasse: LEED certification is always on the table with our clients. What we’ve found is that almost every project we work on is going to meet LEED Silver at a minimum. This is often due to mixed-use projects being located in more dense urban areas, which result in more points for Sustainable Sites credits, and less pressure on the Energy and Atmosphere credits. LEED for Homes Midrise is also becoming more popular, and LEED will require many residential mixed-use projects to pursue this path in the future, instead of LEED NC. Both paths have their advantages, but it appears the rapid rise of LEED for Homes Midrise is not going to slow down, as it fits these project types very well.

Pomerantz: Clients request LEED levels from Certified through Platinum. It varies based on their commitment to sustainability and their business plan objectives. Some clients only do LEED buildings because it is mandated by the authorities.



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Leaders Under 40 program features outstanding young people who are making a difference in manufacturing. View the 2013 Leaders here.
The new control room: It's got all the bells and whistles - and alarms, too; Remote maintenance; Specifying VFDs
2014 forecast issue: To serve and to manufacture - Veterans will bring skill and discipline to the plant floor if we can find a way to get them there.
2013 Top Plant: Lincoln Electric Company, Cleveland, Ohio
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Why manufacturers need to see energy in a different light: Current approaches to energy management yield quick savings, but leave plant managers searching for ways of improving on those early gains.
Electric motor power measurement and analysis: Understand the basics to drive greater efficiency; Selecting the right control chart; Linear position sensors gain acceptance
Protecting standby generators for mission critical facilities; Selecting energy-efficient transformers; Integrating power monitoring systems; Mitigating harmonics in electrical systems

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.