Case study: Financial call center

As more industries deem their daily operations to be mission critical, upgrading existing electrical distribution infrastructure will take on a vital role.

11/17/2013


Five 160 kVA UPS systems were installed at the Chicago-area call center. This inside view shows a 160 kVA UPS system. Courtesy: EatonFor today’s customer service-oriented industries, securing data isn’t the only mission critical objective—maintaining the ability to interact with the customer is now mission critical as well.

At one national financial institution’s 150,000-sq-ft call center located in a western suburb of Chicago, Ill., supporting five floors full of responders is just as crucial to its operations as maintaining its computers. So, when severe power quality issues stemming from the local electrical utility led to a series of brownouts and blackouts that were deemed unacceptable by the financial institution, an electrical distribution system upgrade was in order.

McGuire Engineers created a basis of design document for the call center to determine what it would take to keep this line of business in operation if the utility would fail. This required a broad understanding the facility’s load profile, much of which was derived from historical data from existing half-hour interval demand meters installed by the utility, to determine the amount of uninterruptible power supply (UPS) and generator capacity that would be needed to support that load.

Beyond gathering the hard data, the engineering team also considered the fact that while ensuring power reliability on a typical day is crucial to the call center, ensuring it during a natural disaster may not be. This is because the function of the facility requires responders to be present for operations, and in the event of a significant natural disaster, responders likely wouldn’t be able to access the facility either.

This led to the abandonment of a design that specified 2 MW generators with paralleling switchgear. Instead, a second, redundant medium-voltage (MV) substation utility feed and an automatic throw-over (ATO) switch were incorporated into the design, allowing the facility to automatically switch from one utility feed to another as needed. Functioning similarly to an automatic transfer switch (ATS) but on the utility side, the ATO turned out to be both more economical and appropriate for the call center’s required level of reliability.

At this financial call center, 160 kVA UPS systems were needed to create an uninterrupted power sup-ply when transitioning from one utility feed to the next. Courtesy: EatonOnce the backup power source was in place, it was determined that five (one for each floor) 160 kVA UPS systems would be needed to create an uninterrupted power supply when transitioning from one utility feed to the next. This would help the call center maintain the desired customer experience, creating no opportunities for a loss of data or dropped calls during a power source transfer.

Because the established call center was already fully functional and has long hours of operation (early morning to late evening), the biggest challenge was conducting the upgrade without disrupting the line of business. While in an ideal world McGuire Engineers would have right-sized the UPS, segregating the most critical equipment only for backup, this would have required a rewiring and rerouting of the facility, which would have necessitated a complete system shut-down. Instead, to minimize the level of interruption to the facility, each floor in its entirety, including the lighting, was put on the floor’s local UPS.

Because it wasn’t feasible to provide a N+1 or 2N redundant UPS design, each UPS became a single point of failure. Therefore, the engineers specified an external maintenance bypass cabinet (MBC) for each UPS, which typically gets value-engineered out of projects. However, at the call center, it allows maintenance personnel to take the UPS off line for routine maintenance or even at the end of its life, for replacement, while still maintaining power to the critical load. Note the external MBC was specified as opposed to a dual-input UPS because the latter often provides a false sense of security, as a catastrophic failure within the dual-input UPS still acts as a single point of failure.

Each floor’s UPS and external MBC are housed in dedicated rooms away from call center responders and can be accessed only by maintenance personnel. Finding these rooms was a challenge, as it’s common for a UPS system to weigh 200 lbs/sq ft or more, while most areas within a building are structurally designed to hold only up to 100 lbs/sq ft. Typically, the places that are most able to accommodate such heavy weights are where the building has structural steel, right at the column lines. The design team worked with a structural engineer to identify key locations for UPS system so as to ensure safety and not disrupt the function of the facility. While this seclusion is crucial to maintaining the UPS systems, it also presents a challenge for the facilities operator: How will a UPS failure be recognized?

The LCD panel of the 160 kVA UPS system can be used on-site. Building personnel at this financial call center can access all UPS systems remotely and after hours. Courtesy: EatonTwo levels of remote monitoring were established. The first, a remote point monitoring system with simple dry contact alarms, sends an e-mail to the facility manager letting him know that something is wrong with one of the UPS systems, without any further details. Once the facility manager gets the initial alert, he can log onto the second level of monitoring, a network interface card that hosts a Web page for each UPS on the building’s intranet. This will allow the facility manager to drill down through all the parameters on the UPS to figure out exactly what’s wrong. Building personnel can therefore access all UPS systems remotely and after hours, without having to be in the building itself.


John Yoon is a senior electrical engineer with Chicago-based McGuire Engineers and has been designing and implementing electrical distribution infrastructure solutions for higher education, hospitality, and Fortune 500 corporate clients for 19 years.



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Leaders Under 40 program features outstanding young people who are making a difference in manufacturing. View the 2013 Leaders here.
The new control room: It's got all the bells and whistles - and alarms, too; Remote maintenance; Specifying VFDs
2014 forecast issue: To serve and to manufacture - Veterans will bring skill and discipline to the plant floor if we can find a way to get them there.
2013 Top Plant: Lincoln Electric Company, Cleveland, Ohio
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Why manufacturers need to see energy in a different light: Current approaches to energy management yield quick savings, but leave plant managers searching for ways of improving on those early gains.
Electric motor power measurement and analysis: Understand the basics to drive greater efficiency; Selecting the right control chart; Linear position sensors gain acceptance
Protecting standby generators for mission critical facilities; Selecting energy-efficient transformers; Integrating power monitoring systems; Mitigating harmonics in electrical systems

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.