Why preventive maintenance fails and how to fix it

Part 1: Preventive maintenance (PM) should not be confused with predictive maintenance (PdM), which is a series of dynamic inspections of machine components while the machines are operating in their normal production modes. The first part of a 3-part series explains what great preventive maintenance programs should include. Link to part 2 and part 3 below.

12/09/2015


Some companies are struggling to design an effective preventive maintenance (PM) program? An endless parade of books and articles tell us how to "do" PM. But it's one thing to read, and another entirely to implement.

Preventive maintenance (PM) should not be confused with predictive maintenance (PDM), which is a series of dynamic inspections of machine components while the machines are operating in their normal production modes. Here’s what great preventive maintenance programs should include. Courtesy: Daniel Penn Associates

Know that preventive maintenance should not be confused with predictive maintenance (PdM), which is a series of dynamic inspections of machine components while the machines are operating in their normal production modes.

Here's what great preventive maintenance programs should include:

  • Scheduled inspections and lubrication samplings that determine the physical state of machine components.
  • The lubrications, adjustments and documentation of needed repairs identified during inspections, which prevent unnecessary wear and failure of machine components.
  • To ensure safety and maximize production uptime, inspections and repairs should happen during scheduled plant shut downs when all machines are safely locked out.

If developing a PM program is such a no-brainer, why doesn't every company have one in place?

Reason 1: We didn't lay the groundwork/ have the right systems.

Designing and implementing a PM program requires a very different mind-set than operating and managing a normal maintenance department. PM begins with understanding your facility's goals, setting performance standards for equipment, documenting preventive maintenance procedures and schedules, then uploading it all to your Computerized Maintenance Management System (CMMS). If the company's in-house experts can initiate and manage these tasks, great. If not, find a qualified PM manager, or contract with a capable PM consulting firm that can get (and keep) the ball rolling.

Reason 2: Other things got in the way; we never finished.

Companies delay or stall their PM program for a variety of reasons: A big order comes in and it's all hands on deck. Raw materials are delayed and we have to play catch up when they arrive. We can't seem to find a week when all our key maintenance employees don't have other priorities. But the main reason companies fail at PM is because they haven't included a profit motive: they haven't incorporated a way to benchmark and track the savings that their PM program generates.

Reason 3: We didn't roll it out correctly.

Companies that fail quickest simply hand over PM implementation to their maintenance staff without the proper training and oversight/management.

Your company's biggest ROI may come from an investment in consultants who can help you focus your objectives, create PM tasks correctly the first time around, train your team, oversee all the implementation details and ensure you are left with a management program that will be effective. Make sure they have the hands-on, real world experiences to ensure your PM program's success, and don't simply leave the property after they pile a ton of documents onto your desk.

Reason 4: Our PM activities aren't correctly weighted because we don't understand why breakdowns occur.

When PM task details are not written to address the root causes of breakdowns, you may be focusing on things that don't really impact productivity. If your company has a good work order system in place, measurements can easily be made using basic CMMS reports to measure the effectiveness of your program over time.

To minimize unplanned machine downtime, a well-designed PM program typically allocates 80% to 90% of its time to machine component inspections and 10% to 20% to lubrications.

This article is part 1 of a 3-part series on preventive maintenance.

Link to part 2: Six steps to design a preventive maintenance program
Link to part 3: Best practices in preventive maintenance: How one company did it

Daniel Penn Associates senior consultant Ken Staller has more than 30 years of project engineering, project management and maintenance management experience in machine manufacturing, pulp and paper, pharmaceutical and automotive industries. Daniel Penn Associates (www.danielpenn.com) is a CFE Media content partner. Edited by Erin Dunne, production coordinator, CFE Media, edunne@cfemedia.com



Top Plant
The Top Plant program honors outstanding manufacturing facilities in North America.
Product of the Year
The Product of the Year program recognizes products newly released in the manufacturing industries.
System Integrator of the Year
Each year, a panel of Control Engineering and Plant Engineering editors and industry expert judges select the System Integrator of the Year Award winners in three categories.
June 2018
2018 Lubrication Guide, Motor and maintenance management, Control system migration
May 2018
Electrical standards, robots and Lean manufacturing, and how an aluminum packaging plant is helping community growth.
April 2018
2017 Product of the Year winners, retrofitting a press, IMTS and Hannover Messe preview, natural refrigerants, testing steam traps
June 2018
Machine learning, produced water benefits, programming cavity pumps
April 2018
ROVs, rigs, and the real time; wellsite valve manifolds; AI on a chip; analytics use for pipelines
February 2018
Focus on power systems, process safety, electrical and power systems, edge computing in the oil & gas industry
Spring 2018
Burners for heat-treating furnaces, CHP, dryers, gas humidification, and more
April 2018
Implementing a DCS, stepper motors, intelligent motion control, remote monitoring of irrigation systems
February 2018
Setting internal automation standards

Annual Salary Survey

After two years of economic concerns, manufacturing leaders once again have homed in on the single biggest issue facing their operations:

It's the workers—or more specifically, the lack of workers.

The 2017 Plant Engineering Salary Survey looks at not just what plant managers make, but what they think. As they look across their plants today, plant managers say they don’t have the operational depth to take on the new technologies and new challenges of global manufacturing.

Read more: 2017 Salary Survey

The Maintenance and Reliability Coach's blog
Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
One Voice for Manufacturing
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Maintenance and Reliability Professionals Blog
The Society for Maintenance and Reliability Professionals an organization devoted...
Machine Safety
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
Research Analyst Blog
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Marshall on Maintenance
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
Lachance on CMMS
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.
Electrical Safety Update
This digital report explains how plant engineers need to take greater care when it comes to electrical safety incidents on the plant floor.
Maintenance & Safety
The maintenance journey has been a long, slow trek for most manufacturers and has gone from preventive maintenance to predictive maintenance.
IIoT: Machines, Equipment, & Asset Management
Articles in this digital report highlight technologies that enable Industrial Internet of Things, IIoT-related products and strategies.
Randy Steele
Maintenance Manager; California Oils Corp.
Matthew J. Woo, PE, RCDD, LEED AP BD+C
Associate, Electrical Engineering; Wood Harbinger
Randy Oliver
Control Systems Engineer; Robert Bosch Corp.
Data Centers: Impacts of Climate and Cooling Technology
This course focuses on climate analysis, appropriateness of cooling system selection, and combining cooling systems.
Safety First: Arc Flash 101
This course will help identify and reveal electrical hazards and identify the solutions to implementing and maintaining a safe work environment.
Critical Power: Hospital Electrical Systems
This course explains how maintaining power and communication systems through emergency power-generation systems is critical.
click me