How to eat a chocolate elephant: Step by step method to reduce lead time

To reduce lead time, the first step is to prioritize the operations which will yield the most results, then review transactional history to check actual performance.

03/26/2015


How do you eat a chocolate elephant? Well, the answer is easy and well-known – one bite at a time. The same is true when nibbling away at reducing lead time. Courtesy: Daniel Penn Associates, LLCHow do you eat a chocolate elephant? Well, the answer is easy and well-known – one bite at a time. The same is true when nibbling away at reducing lead time. A value stream map identifies opportunities through the build-up of work-in-process (WIP) which exists between operations in a process.

The first step is to prioritize the series of operations which will yield the most significant results. Nothing ensures continuous improvement like early success, and the bigger the success, the more momentum a team will gain in working to gain further improvements.

There are two ways to determine lead time.


The first is by checking actual 

performance, through reviewing transactional history from routers attached to the material. This should be done during the data gathering phase of the value stream mapping process. If routers aren’t used, then transactional history may be taken from the enterprise resource planning system’s material management module.

To reduce lead time, the first step is to prioritize the operations which will yield the most results, then review transactional history to check actual performance. Courtesy: Daniel Penn Associates, LLC

The second method, and perhaps even more revealing, is to calculate the lead time using Little’s Law. While on the data gathering walk of the VSM event, count the inventory at each operation. Then, use the simple formula. Little’s Law is simply expressed by dividing the amount of work-in-process by the daily requirement. The result yields the number of days of lead time.

(Hint: Don’t mix methods! Use the actual days from routers OR Little’s Law). Regardless of how the team arrives at the lead times, the work of the following kaizen events is to reduce lead times.

The kaizen team should regard every queue as the waste that it is. Work-in-process should not be arbitrarily reduced to 0. The technique is known as “Lean”, not “Anorexic”. The correct amount of work-in-process is calculated by dividing the operation’s total cycle time by takt time. This result yields standard work-in-process(SWIP).

Now, the team must consider the current limitations to reducing current WIP to SWIP. Daniel Penn Associates, LLC There may be a lengthy change-over that’s not a SMED (single minute exchange of dies), but more like a SHED (single hour exchange of dies). There may be staffing issues, which reveals the need for standard work combinations and effective cross-training. More complex an issue may be large equipment installations that preclude co-locating into a cell or process layout. Along with implementing improvements, visual controls must be put in place so there’s no ‘augmentation’ to the defined SWIP. And, any amounts of WIP in excess of WIP required by current process limitations remain targets for further kaizen.

Case study:

A company had identified opportunities through a value stream mapping event. They divided the process into four major VSM planning loops, with a fifth loop focused on administrative (planning, forecasting and order receipt) activities. They saw opportunities with the final sequence of operations – two inspection operations, an assembly kitting operation, and a final pack operation.

The material is lot-controlled, so the parts can maintain traceability through the entire product lifecycle, an important requirement in the industry they serve. Parts would pile up while inspectors were performing other duties – the symptom of large lot, batch method material movement. When orders became due, or overdue, then it was an all hands on deck call to hustle material through the operations and onto a plane to the customer. This approach chews up a lot of space, a potential quality issue with mixed lot materials, and the pressure to get stuff out the door almost at all costs.

How about air-freight and overtime costs? The team used the Little’s Law approach to calculate lead time – 10.5 days of WIP. The sum of all operations’ cycle times was 10 minutes, which is about one minute of work per day per piece (not a great example of material flow).

They calculated standard work-in-process, which worked out to be 2. They decided that each of two different products (size and number of pieces per assembly set), it would be best to establish two inspection cells, facilitating flow for each product. Then the SWIP was now 1 for each cell. As the parts were inspected, kitted (left and right for the large parts; left, right and center for the smaller parts, and bagged, they were placed on a cart bound for pack. When the SWIP was reached – indicated by the filling of the rack on the cart, it was wheeled out of the clean room to a packing station where the inspector would final pack the parts, print the label, and call for pick up from shipping. They would then return to the clean room to commence inspecting the next group of parts.

While it would be a perfect ending to say this ended the air freight, it did not, at least right away. When there was enough in the supply chain, the company was able to start shipping by truck, so that air freight is an occasional charge, not a daily expense.

The total cost of the improvements was about $500 – a cart, some racks, and some colored tape. Lead time was 10.5 days and is now 5 days. The team stays focused on further improvements to reduce the WIP to SWIP, which would result in a 2 day lead time.

Chocolate elephant? Not completely eaten, but it’s lost some weight!

Tom Voss is senior consultant at Daniel Penn Associates, LLC. He has developed and implemented Lean enterprise solutions for more than 15 years. Trained and mentored in Lean concepts by the founders of Shingijitsu Company, Ltd., renowned experts of the Toyota Production System. Daniel Penn Associates, LLC is a CFE Media content partner. Edited by Joy Chang, digital project manager, Plant Engineering.



Top Plant
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2017 Top Plant.
Product of the Year
The Product of the Year program recognizes products newly released in the manufacturing industries.
System Integrator of the Year
Each year, a panel of Control Engineering and Plant Engineering editors and industry expert judges select the System Integrator of the Year Award winners in three categories.
May 2018
Electrical standards, robots and Lean manufacturing, and how an aluminum packaging plant is helping community growth.
April 2018
2017 Product of the Year winners, retrofitting a press, IMTS and Hannover Messe preview, natural refrigerants, testing steam traps
March 2018
SCCR, 2018 Maintenance study, and VFDs in a washdown environment.
April 2018
ROVs, rigs, and the real time; wellsite valve manifolds; AI on a chip; analytics use for pipelines
February 2018
Focus on power systems, process safety, electrical and power systems, edge computing in the oil & gas industry
December 2017
Product of the Year winners, Pattern recognition, Engineering analytics, Revitalize older pump installations
Spring 2018
Burners for heat-treating furnaces, CHP, dryers, gas humidification, and more
April 2018
Implementing a DCS, stepper motors, intelligent motion control, remote monitoring of irrigation systems
February 2018
Setting internal automation standards

Annual Salary Survey

Before the calendar turned, 2016 already had the makings of a pivotal year for manufacturing, and for the world.

There were the big events for the year, including the United States as Partner Country at Hannover Messe in April and the 2016 International Manufacturing Technology Show in Chicago in September. There's also the matter of the U.S. presidential elections in November, which promise to shape policy in manufacturing for years to come.

But the year started with global economic turmoil, as a slowdown in Chinese manufacturing triggered a worldwide stock hiccup that sent values plummeting. The continued plunge in world oil prices has resulted in a slowdown in exploration and, by extension, the manufacture of exploration equipment.

Read more: 2015 Salary Survey

The Maintenance and Reliability Coach's blog
Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
One Voice for Manufacturing
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Maintenance and Reliability Professionals Blog
The Society for Maintenance and Reliability Professionals an organization devoted...
Machine Safety
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
Research Analyst Blog
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Marshall on Maintenance
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
Lachance on CMMS
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.
Maintenance & Safety
The maintenance journey has been a long, slow trek for most manufacturers and has gone from preventive maintenance to predictive maintenance.
Industrial Analytics
This digital report explains how plant engineers and subject matter experts (SME) need support for time series data and its many challenges.
IIoT: Operations & IT
This digital report will explore several aspects of how IIoT will transform manufacturing in the coming years.
Randy Steele
Maintenance Manager; California Oils Corp.
Matthew J. Woo, PE, RCDD, LEED AP BD+C
Associate, Electrical Engineering; Wood Harbinger
Randy Oliver
Control Systems Engineer; Robert Bosch Corp.
Data Centers: Impacts of Climate and Cooling Technology
This course focuses on climate analysis, appropriateness of cooling system selection, and combining cooling systems.
Safety First: Arc Flash 101
This course will help identify and reveal electrical hazards and identify the solutions to implementing and maintaining a safe work environment.
Critical Power: Hospital Electrical Systems
This course explains how maintaining power and communication systems through emergency power-generation systems is critical.
click me