Organizations that want to create the safest possible work environments are thinking ahead of incidents by modernizing equipment and designing spaces for safety. Courtesy: Schneider ElectricFor electrical engineers and electrical workers, the risk of arc flash hazards is a primary safety concern. Arc flash events produce high-energy outputs of heat and pressure, reaching temperatures as high as 35,000 degrees F, and cause electrical explosions that put workers at severe risk for burn injuries and, in some cases, fatality.

Knowing and understanding the dangers of arc flash is key to preventing them, and regulatory agencies have worked diligently to put specific requirements and guidelines into place to combat these hazardous incidents. But adhering to these rules is really only the first step on the path toward electrical workplace safety.

Facility owners can go further to help ensure worker safety in electrical environments by implementing sound strategies that include modernizing existing electrical equipment and incorporating safety by design, in which safety is inherently enabled in all electrical situations.

Modernizing for increased safety

NFPA 70E: Standard for Electrical Safety in the Workplace is the primary industry standard for compliance for U.S. organizations to promote safe electrical workplace practices. Under this standard, organizations must adhere to a number of steps to achieve compliance including auditing current workplace environments, developing safe practices, conducting an arc flash risk assessment, conducting regular training and audits for electrical workers, maintaining electrical equipment and providing employees with proper personal protective equipment.

It is worth noting that many of the steps and procedures outlined by NFPA 70E, while effective, are required after equipment has already been installed. The often-overlooked and informative Annex P, however, provides further guidance for implementing protective strategies that aim to eliminate risk altogether, rather than simply respond to it. These guidelines include incorporating a cycle of continuous improvement: plan, check, do and act (PCDA). In implementing these four steps, organizations can reduce the risk of electrical arc flash for their workers.

One main way to plan for safety and reduce electrical-hazard risk is to implement engineering controls, which can be enhanced by proper device selection and the modernizing of existing electrical equipment. It is no secret that many of today's facilities are aging. Technology that is 15 to 20 years old does not include modern safety features, and some even older equipment may not even meet the standards for electrical safety required by modern regulation.

Equipment maintenance, while important to maintaining safe environments with older technology, often does not go far enough to ensure worker safety in an electrical environment. Properly maintained equipment is still subject to two key phenomena:

1. It may no longer be sustainable due to technological advances.

2. It ultimately degrades and reaches the end of its useful lifecycle.

As facilities upgrade and electrical loads change, existing equipment often is not equipped to support evolving electrical requirements. Aging equipment is also at a higher risk for arc flash incidents due to failing materials, corrosion, dust and debris buildup and other factors.

It often makes sense for facility owners to upgrade to modern equipment to address these issues. Upgrading to new equipment can have significant financial and safety benefits for a facility:

  • Reduced maintenance costs. Existing circuit breakers require periodic maintenance, especially as they age. In some cases, components for existing circuit breakers may not be supported. Replacing circuit breaker equipment to the latest technology can help to reduce a facility's current maintenance costs.
  • Increased reliability. Maintaining consistent power is one of the key ways to reduce the risk of arc flash. Older circuitry may have dash-pot-style trip devices that can have a higher failure rate and be more susceptible to foreign material contamination. Upgrading circuitry can increase the power reliability in an electrical environment, leading to a safer work environment.
  • Enhanced safety capabilities. Modern equipment has inherent safety capabilities and technological advancements that cannot exist in older equipment. Modern technology has arc-flash-resistant features, like arc-fault-current interruption and arc-extinguishing technology.

When considering upgrading equipment in existing structures, worker safety is paramount. Many organizations are consulting outside sources to help them identify where to implement modernization tactics to reduce the risk of arc flash. These benefits factor into the consideration for equipment modernization in existing structures. Incorporating modernization into facility planning in existing facilities is a good tactic for ensuring safe electrical environments.

Safety by design

In new structures, facilities owners should be taking safety even further. Along with designing structures for energy efficiency and optimal space use, organizations should consider safety as a key factor in design plans for structures where electrical loads are present.

The concept of "safety by design" incorporates engineering controls, modern technology and design features to help ensure a safe environment at the outset. Making fundamental design choices to promote electrical safety can reduce the risk of arc flash and even prepare facilities for any adjustments in electrical loads that may occur in the future.

Two design strategies that mitigate the risk of an arc flash event include specialized relaying, such as light-sensing technology, or incorporating virtual main-relay systems. Both of these examples lower arc flash energy by reducing the arcing time. Remote racking and digital controls can also be incorporated in design and reduce workers' exposure to arc flash.

Facility owners that select the correct and proper equipment in the initial design phases are at an advantage, ensuring the safest possible environment for their workers right from the start of installation. Oftentimes, enlisting third-party engineers to assist in the design phase can help to identify areas where electrical safety measures can be incorporated. Those who wait and perform arc flash analyses after installation may face costly adjustments and find solutions difficult to implement. The alternative, to incorporate modern equipment right from the planning and design phase, can be a less costly and ultimately safer decision.

Maintaining a safe environment

Meeting regulatory standards for electrical safety is not only essential to worker safety, it is an OSHA requirement. In some cases, implementing the regulatory steps after equipment is installed may not be enough to mitigate and prevent the risk of arc flash incidents. Organizations that want to create the safest possible work environments are thinking ahead of incidents by modernizing equipment and designing spaces for safety.

Whether planning for modernization of equipment in existing facilities or implementing design features to create safe electrical work zones in new structures, facility owners need to be aware of the risk of arc flash incidents and consider the best possible ways to ensure worker safety.

John Blaylock is senior director of operations for U.S. services and Doug Beck is in power system engineering, U.S. services for Schneider Electric.



Top Plant
The Top Plant program honors outstanding manufacturing facilities in North America.
Product of the Year
The Product of the Year program recognizes products newly released in the manufacturing industries.
System Integrator of the Year
Each year, a panel of Control Engineering and Plant Engineering editors and industry expert judges select the System Integrator of the Year Award winners in three categories.
July/Aug
GAMS preview, 2018 Mid-Year Report, EAM and Safety
June 2018
2018 Lubrication Guide, Motor and maintenance management, Control system migration
May 2018
Electrical standards, robots and Lean manufacturing, and how an aluminum packaging plant is helping community growth.
April 2018
2017 Product of the Year winners, retrofitting a press, IMTS and Hannover Messe preview, natural refrigerants, testing steam traps
August 2018
SCADA standardization, capital expenditures, data-driven drilling and execution
June 2018
Machine learning, produced water benefits, programming cavity pumps
April 2018
ROVs, rigs, and the real time; wellsite valve manifolds; AI on a chip; analytics use for pipelines
Spring 2018
Burners for heat-treating furnaces, CHP, dryers, gas humidification, and more
August 2018
Choosing an automation controller, Lean manufacturing
February 2018
Setting internal automation standards

Annual Salary Survey

After two years of economic concerns, manufacturing leaders once again have homed in on the single biggest issue facing their operations:

It's the workers—or more specifically, the lack of workers.

The 2017 Plant Engineering Salary Survey looks at not just what plant managers make, but what they think. As they look across their plants today, plant managers say they don’t have the operational depth to take on the new technologies and new challenges of global manufacturing.

Read more: 2017 Salary Survey

The Maintenance and Reliability Coach's blog
Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
One Voice for Manufacturing
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Maintenance and Reliability Professionals Blog
The Society for Maintenance and Reliability Professionals an organization devoted...
Machine Safety
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
Research Analyst Blog
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Marshall on Maintenance
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
Lachance on CMMS
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.
Material Handling
This digital report explains how everything from conveyors and robots to automatic picking systems and digital orders have evolved to keep pace with the speed of change in the supply chain.
Electrical Safety Update
This digital report explains how plant engineers need to take greater care when it comes to electrical safety incidents on the plant floor.
IIoT: Machines, Equipment, & Asset Management
Articles in this digital report highlight technologies that enable Industrial Internet of Things, IIoT-related products and strategies.
Randy Steele
Maintenance Manager; California Oils Corp.
Matthew J. Woo, PE, RCDD, LEED AP BD+C
Associate, Electrical Engineering; Wood Harbinger
Randy Oliver
Control Systems Engineer; Robert Bosch Corp.
Data Centers: Impacts of Climate and Cooling Technology
This course focuses on climate analysis, appropriateness of cooling system selection, and combining cooling systems.
Safety First: Arc Flash 101
This course will help identify and reveal electrical hazards and identify the solutions to implementing and maintaining a safe work environment.
Critical Power: Hospital Electrical Systems
This course explains how maintaining power and communication systems through emergency power-generation systems is critical.
click me