College, university building electrical and power system design

College and university campus buildings have a lot going on—classes, research, dining, and sleeping. Electrical and power systems—including standby, emergency, and backup power—are key components.

12/18/2013


Robert Garra, PE, CDT is Vice president, electrical engineering of Cannon Design, Buffalo, N.Y. Courtesy: Cannon DesignRandy Hassler, PE, LEED AP is a Principal at McClure Engineering, St. Louis, MO. Courtesy: McClure EngineeringAndrew Slater, PE, is an electrical engineer at HGA Architects and Engineers in Milwaukee, WI. Courtesy: HGA Architects and Engineers

Participants

Robert Garra, PE, CDT, Vice president, electrical engineering, Cannon Design, Buffalo, N.Y.

Randy Hassler, PE, LEED AP, Principal, McClure Engineering, St. Louis, MO

Andrew Slater, PE, Electrical engineer, HGA Architects and Engineers, Milwaukee, WI


CSE: What’s the one factor most commonly overlooked in electrical systems in such buildings?

Slater: The arc flash, short circuit, and coordination study are commonly overlooked items in an electrical system. The study is essential to ensuring any outages are limited to a small area. The arc flash helps keep maintenance staff aware of the proper safety protocols that are needed to maintain particular distribution equipment.

Hassler: Campus buildings are typically designed for 50- to 100-year life. Designing for routine maintenance and with end-of-life replacement should be a consideration. For example, feed-through panelboards require de-energizing multiple panels for maintenance and are more difficult to replace at end of life compared to panels that are fed individually. A building often goes through multiple partial renovations during its life span, so keeping the electrical distribution tied to the building core with elevators, bathrooms, and mechanical rooms provides a greater chance that it will not require relocation due to a minor renovation. 

CSE: Describe a recent project in which you had complex metering and sub-metering in a building.

Hassler: Building energy usage and sub-metering on HVAC equipment is commonly requested. Numerous electrical sub-meters are required for U.S. Green Building Council LEED measurement and verification; however, if planned for early in the electrical distribution design, the metering can be simplified by segregating loads on different panels.

Slater: The most recent project that had a complex metering system was actually for an industrial facility. The system included the main primary voltage meter, the secondary meter located at the main circuit breaker, and individual branch feeder sub-meters. 

CSE: How do you balance the need for reliable power with the desire for efficiency and sustainability?

Garra: This is a tough balance. We need to put public safety first and then try to make the systems as efficient as possible. The conservative nature of NFPA 70: National Electrical Code requires engineers to size equipment in a manner that usually results in oversized equipment. Collaboration with end users or steering them toward energy-efficient, U.S. EPA Energy Star-rated equipment is an important option. Counting watts to maximize the efficiency of the electrical infrastructure helps maintain the balance of efficiency and safety. In this case, we can use the lower power draws in our calculations, thus lowering the required system capacities. Using LED luminaires or using advanced lighting control systems helps reduce unnecessary and wasteful energy usage. 

CSE: What type of backup or standby power systems have you specified into colleges and universities recently?

Hassler: Engine generators for loads that need long duration backup, such as research freezers, growth chambers, vivarium HVAC, etc. In research facilities, owners are requesting approximately 2 W/sq ft of standby power allowance for lab use. Consideration is also required for cooling to prevent equipment from overheating. Uninterruptable power supply (UPS) for loads that are sensitive to any fluctuation in power, such as computers, mass spectrometers, etc. It would not be uncommon to have a dedicated UPS for a specific piece of equipment. When a UPS system is used for multiple pieces of equipment, then scalable UPS systems are an attractive option that can be modified as equipment is added, removed, or replaced. Maintenance bypass switches on automatic transfer switch (ATS) and UPS to allow for routine service are usually prudent. It should be discussed who will test and maintain the equipment, pay for service contracts, and pay for ongoing maintenance (i.e., facilities, the department).



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Leaders Under 40 program features outstanding young people who are making a difference in manufacturing. View the 2013 Leaders here.
The new control room: It's got all the bells and whistles - and alarms, too; Remote maintenance; Specifying VFDs
2014 forecast issue: To serve and to manufacture - Veterans will bring skill and discipline to the plant floor if we can find a way to get them there.
2013 Top Plant: Lincoln Electric Company, Cleveland, Ohio
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Bring focus to PLC programming: 5 things to avoid in putting your system together; Managing the DCS upgrade; PLM upgrade: a step-by-step approach
Balancing the bagging triangle; PID tuning improves process efficiency; Standardizing control room HMIs
Commissioning electrical systems in mission critical facilities; Anticipating the Smart Grid; Mitigating arc flash hazards in medium-voltage switchgear; Comparing generator sizing software

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.