Faster flexible testing, higher throughput

Case study: Harman accelerates infotainment system testing and throughput, including increased automation and throughput. Additionally, the stations can easily be adapted to handle evolving products and provide Harman with a competitive advantage.

08/07/2013


Figure 1: Flexible test station from Averna can easily be adapted to handle evolving products and provide Harman with a competitive advantage. For RF testing, the Averna deployed its Universal Receiver Tester (URT) 4000. Courtesy: Averna TechnologiesHarman collaborated with a global test-engineering company to engineer new, more efficient automated functional test (AFT) and end-of-line (EOL) test stations for a new line of infotainment receivers.

 

Since Harman launched its first car radio in 1948, the user experience in automobiles has evolved enormously. Back then, tuning into an AM station and adjusting the volume were all you could do. In Harman’s current infotainment systems, AM radio is just a small portion of the user experience on offer. At their fingertips, passengers have the latest GPS technology, touch screens, integrated cellphone, iPod, Bluetooth, Wi-Fi, USB capabilities, rear-seat video screens, and radio and music offerings. An additional evolution over the past few years includes enhanced security features and associated “hands-free” functionality, such as provided by Bluetooth and voice recognition.

As more technology is integrated into our automobiles, user expectations are high. Everything must work as expected and work in harmony, with the highest quality. Consequently, infotainment system testing has become increasingly complex. Not only must each feature and technology—such as electrical, RF, and audio/video—be tested and measured individually, but the core system functionality also needs to be rigorously tested to ensure smooth overall operation. Such complex and comprehensive test requirements have obviously led to greatly expanded test infrastructure and lengthier test cycles.


Implementation of next generation testing

Faced with the challenge of quickly and thoroughly testing the latest feature-filled consumer products, many original equipment manufacturers (OEMs) have sought innovative approaches to satisfy technical and business requirements. Harman and the test-engineering company Averna identified the following priorities for the new test systems:

• Flexibility: Optimize production throughput during high-volume periods

• Scalability: Test different infotainment products with minimal changes

• Cost savings: Lower long-term capital expenditures and reduce obsolescence.

Figure 2: To maximize productivity, the test stations for Harman include “product intelligent” fixturing. Courtesy: Averna Technologies

Flexible test station design

In a traditional test paradigm, every element of a test system—from test instruments and fixtures to test software—is designed and dedicated for testing just one product. When sales for that product drop off or when the product’s features change dramatically, the test system often has to be significantly overhauled or rendered obsolete.

Through its collaborations with multiple OEMs in numerous industries, the test engineering company has identified ways to extend the purpose and life of test equipment far beyond a “one product” design. The Harman project began by proposing flexible test stations (Figure 1) (sometimes called “generic” or “common” test stations) that would enable Harman to test a range of infotainment systems it produces for different clients, while also allowing the stations to be upgraded at minimal cost to handle new or evolving products. The test station design is based on the following requirements:

• Standard racks with 20% free space for expansion

• Specialized, modular instruments such as PXI

• An industry-standard test executive

• Parallel testing

• Intelligent, swappable fixturing

To start, a 3U PXI form factor was chosen, allowing the system to accommodate multiple PXI instruments for audio generation/analysis, CAN communication, digital I/O, RF switching, and more. For the RF testing, a receiver tester was used that has signal-generation toolkits covering multiple protocols like AM/FM, RDS, DAB, IBOC, Sirius/XM, and GPS. Additional RF generators were also integrated for Wi-Fi and Bluetooth testing.

Accelerating throughput

To maximize productivity, the test stations include “product intelligent” fixturing (Figure 2). The station can accommodate up to four such fixtures, allowing multiple units to be tested at the same time. The fixtures integrate all product-specific elements—such as audio loads, antenna loads, relays and signal distribution—that may only be needed for one product or even one iteration of the product. The test engineering company incorporated specific switching for the unit under test (UUT) in the fixtures to avoid having to over-specify switching subsystems in the stations. In effect, the swappable product-specific fixtures, which are considerably less expensive than instruments, ensure that Harman’s test stations have the widest possible application.

Since a high priority for the test systems was maximizing throughput and instrument usage, an asynchronous parallel architecture was used on the test stations to get more performance from the instruments. For example, rather than using the instruments to test one UUT at a time, multi-core processing and advanced switching combine to share instruments across multiple UUTs, allowing the four UUTs to be tested simultaneously without significantly impacting the testing time of individual units.

To drive this modular-instrument, custom-fixture architecture, Harman and Averna selected and implemented National Instruments’ TestStand test executive, which helps with multi-threading and multi-core processing. For example, the test sequencing was architected so that while Test 2 is underway on UUT1, Test 1 is starting on UUT2, allowing all test instruments to be engaged simultaneously, maximizing usage.

Benefits: swappable fixturing, automation

 The newly designed test stations offer many benefits. The stations’ flexible architecture, state-of-the-art instruments, robust switching systems, standard test executives, and swappable fixturing truly allow Harman to cover all its current test needs for different products, including increased automation and throughput. Additionally, these stations can easily be adapted to handle evolving products and provide Harman with a competitive advantage.

- Alex Boyer is team leader – system architecture, Averna Technologies, and Ehab Beshay is senior manager test engineering for Harman International. Edited by Mark T. Hoske, content manager, CFE Media, Control Engineering and Plant Engineering, mhoske@cfemedia.com.

Averna Technologies is a CSIA member as of 2/26/2015

Online extras

www.averna.com

www.harman.com

www.ni.com/solutions 

Averna provides more information on the Averna RF Studio product for NI's Software Defined Radio Platform. Averna announced RF Studio July 31 and showed it at NIWeek 2013.



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2015 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
Your leaks start here: Take a disciplined approach with your hydraulic system; U.S. presence at Hannover Messe a rousing success
Hannover Messe 2016: Taking hold of the future - Partner Country status spotlights U.S. manufacturing; Honoring manufacturing excellence: The 2015 Product of the Year Winners
Inside IIoT: How technology, strategy can improve your operation; Dry media or web scrubber?; Six steps to design a PM program
Getting to the bottom of subsea repairs: Older pipelines need more attention, and operators need a repair strategy; OTC preview; Offshore production difficult - and crucial
Digital oilfields: Integrated HMI/SCADA systems enable smarter data acquisition; Real-world impact of simulation; Electric actuator technology prospers in production fields
Special report: U.S. natural gas; LNG transport technologies evolve to meet market demand; Understanding new methane regulations; Predictive maintenance for gas pipeline compressors
Warehouse winter comfort: The HTHV solution; Cooling with natural gas; Plastics industry booming
Managing automation upgrades, retrofits; Making technical, business sense; Ensuring network cyber security
Designing generator systems; Using online commissioning tools; Selective coordination best practices

Annual Salary Survey

Before the calendar turned, 2016 already had the makings of a pivotal year for manufacturing, and for the world.

There were the big events for the year, including the United States as Partner Country at Hannover Messe in April and the 2016 International Manufacturing Technology Show in Chicago in September. There's also the matter of the U.S. presidential elections in November, which promise to shape policy in manufacturing for years to come.

But the year started with global economic turmoil, as a slowdown in Chinese manufacturing triggered a worldwide stock hiccup that sent values plummeting. The continued plunge in world oil prices has resulted in a slowdown in exploration and, by extension, the manufacture of exploration equipment.

Read more: 2015 Salary Survey

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.
This article collection contains several articles on the vital role that compressed air plays in manufacturing plants.
This article collection contains several articles on the Industrial Internet of Things (IIoT) and how it is transforming manufacturing.
This article collection contains several articles on strategic maintenance and understanding all the parts of your plant.
click me