Work order management: 10 hurdles to overcome

Establishing and maintaining an effective and efficient work order management system can be very similar to running a 400 meter high-hurdle race and winning.

03/21/2014


Establishing and maintaining an effective and efficient work order management system can be very similar to running a 400 meter high-hurdle race and winning. However, where just one hurdle can cause considerable damage, PE1403_WEB_IMG_Jerry-Wanichkoit’s vital to ensure that they are promptly identified and addressed. In the context of T.A. Cook´s experience with clients based in North America, the following list includes the 10 largest hurdles Maintenance Managers face, as well as suggestions for how they can best be overcome. 

  1. Not properly writing a work notification
    If notifications can’t be understood or found easily, they can’t be fixed. Send them back to the originator and explain why they are not fit for purpose.
  2. Lack of discipline and understanding
    When everything is a priority, nothing is a priority: not understanding or lacking the discipline to follow a simple prioritization system is a key issue that absolutely must be addressed by Managers. Also, when a 1-2-3 priority system degenerates into having 2a, 2b, 3a, 3b, then the discipline has deserted the system. Go back to basics; redefine the priority system, keeping it simple. Create a one-page visual aid and post it everywhere work notifications are created, discussed or reviewed.
  3. Absence of notification gates
    Not having a “gate” between notification and conversion to approval and not tracking the rate means you are wasting time: not every notification needs to be approved. If the approval rate hasn't been properly defined, too many are getting through. 
  4. Ignoring planning capacity
    Planners have a finite planning scope each week and they need to know which work orders are the most critical: otherwise the risk of not having enough planned work to build a full schedule is high. Additionally, failing to properly plan work orders - including poor work estimates, omitting steps, tools and equipment - and not following a standard for building a complete work package creates lost time in execution.
  5. Scheduling by tasks or activities instead of by work order 
    If scaffolding is still up all over the place after jobs are complete, this could be where the error occurs. It also increases the complexity of coordination between craft and specialty equipment such as cranes. 
  6. Not challenging “break-in” work and lazy scheduling
    Schedule break-ins are often simply accepted, leaving managers in fire-fighting mode and ensuring that the backlog will just grow and grow. Similarly, not tracking the rate of rejection or acceptance means the schedule of planned work will never be attained. Additionally, issuing a weekly schedule and then conducting daily meetings to agree what will be worked on during the following day means that a weekly schedule won´t be followed. You operate to a daily work list.
  7. Absence of short-interval-control
    Not employing short-interval-control during the workday to manage and when necessary problem solve issues to keep the work flowing. Set the expectation that first line management must tour the area every 2 hours. Provide coaching to the first line to reinforce pro-active management behaviors during the short-interval-control tours.
  8. Leaving finished work orders open
    Not closing out work orders which are completed keeps the backlog inflated and confusing.
  9. Bad documentation
    Not documenting errors or omissions in work plans or packages and not getting this feedback to the right Planner means the packages will never get any better nor will the craft increase efficiency.
  10. Poor KPI standard or relevance
    Not having the right set of key performance indicators or metrics to track and review your performance against the previous hurdles or only reviewing performance monthly renders the very existence of KPIs redundant: monthly metric reviews are only marginally better than no review.

If any of the above hurdles are familiar to your organization, money is being wasted and the maintenance budget will overrun. 

Jerry Wanichko is Director of Consulting Operations North America for T.A. Cook Consultants, Inc.

 



Top Plant
The Top Plant program honors outstanding manufacturing facilities in North America.
Product of the Year
The Product of the Year program recognizes products newly released in the manufacturing industries.
System Integrator of the Year
Each year, a panel of Control Engineering and Plant Engineering editors and industry expert judges select the System Integrator of the Year Award winners in three categories.
June 2018
2018 Lubrication Guide, Motor and maintenance management, Control system migration
May 2018
Electrical standards, robots and Lean manufacturing, and how an aluminum packaging plant is helping community growth.
April 2018
2017 Product of the Year winners, retrofitting a press, IMTS and Hannover Messe preview, natural refrigerants, testing steam traps
June 2018
Machine learning, produced water benefits, programming cavity pumps
April 2018
ROVs, rigs, and the real time; wellsite valve manifolds; AI on a chip; analytics use for pipelines
February 2018
Focus on power systems, process safety, electrical and power systems, edge computing in the oil & gas industry
Spring 2018
Burners for heat-treating furnaces, CHP, dryers, gas humidification, and more
April 2018
Implementing a DCS, stepper motors, intelligent motion control, remote monitoring of irrigation systems
February 2018
Setting internal automation standards

Annual Salary Survey

After two years of economic concerns, manufacturing leaders once again have homed in on the single biggest issue facing their operations:

It's the workers—or more specifically, the lack of workers.

The 2017 Plant Engineering Salary Survey looks at not just what plant managers make, but what they think. As they look across their plants today, plant managers say they don’t have the operational depth to take on the new technologies and new challenges of global manufacturing.

Read more: 2017 Salary Survey

The Maintenance and Reliability Coach's blog
Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
One Voice for Manufacturing
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Maintenance and Reliability Professionals Blog
The Society for Maintenance and Reliability Professionals an organization devoted...
Machine Safety
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
Research Analyst Blog
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Marshall on Maintenance
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
Lachance on CMMS
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.
Electrical Safety Update
This digital report explains how plant engineers need to take greater care when it comes to electrical safety incidents on the plant floor.
Maintenance & Safety
The maintenance journey has been a long, slow trek for most manufacturers and has gone from preventive maintenance to predictive maintenance.
IIoT: Machines, Equipment, & Asset Management
Articles in this digital report highlight technologies that enable Industrial Internet of Things, IIoT-related products and strategies.
Randy Steele
Maintenance Manager; California Oils Corp.
Matthew J. Woo, PE, RCDD, LEED AP BD+C
Associate, Electrical Engineering; Wood Harbinger
Randy Oliver
Control Systems Engineer; Robert Bosch Corp.
Data Centers: Impacts of Climate and Cooling Technology
This course focuses on climate analysis, appropriateness of cooling system selection, and combining cooling systems.
Safety First: Arc Flash 101
This course will help identify and reveal electrical hazards and identify the solutions to implementing and maintaining a safe work environment.
Critical Power: Hospital Electrical Systems
This course explains how maintaining power and communication systems through emergency power-generation systems is critical.
click me