Where to start? Building a world class MRO process

In practice, it’s easier to ‘build’ a world class MRO process from one that is mature and functioning, rather than from scratch.

03/21/2013


Courtesy: Marshall InstituteIn practice, it’s easier to ‘build’ a world class MRO process from one that is mature and functioning, rather than from scratch. Consider your process that has been inefficiently working for years; delivery both poor service and great inconvenience. This is truly a more enviable position than starting with an empty warehouse.

Why? Think of all the great examples you already have of “how not to do something”. Thomas Edison so cleverly stated that he didn’t have thousands of failed experiments when creating a light bulb; he just learned 10,000 ways not to do it.

We’ll save you 9,991 attempts by giving you a 9 step outline to use in building a world class MRO process. It’s like flipping a switch; after all, what could be easier?

Step 1: Conduct a parts needs analysis

How do parts end up in the storeroom? That’s a rhetorical question; the most likely scenario is “we really don’t know”. Technically, when the equipment was first commissioned, the OEM should have provided a suggested spare parts list. From that initial offering, and after years of use, the maintenance/engineering departments add to (and theoretically subtract from) the MRO materials stocked for that specific machine. After a long disconnected relationship between the storeroom and maintenance, we end up with having lots of parts, but never the right part.

All MRO material in the storeroom should be in active support of current plant equipment. If the spare components do not meet this threshold, remove them. Establish a priority of equipment to consider for and MRO review. Determine what you have in stock, in support of that equipment, review previous work order history and interview the skilled trades and get a sense of what should be stocked and in what quantity.

Use a methodology like an ABC classification to break down your MRO material in terms of its criticality. Also, create the critical spare parts formula to carefully consider and stock these most valuable items.

And, most importantly, make sure your MRO material on hand is in perfect alignment with your maintenance strategy. This is the oft forgotten step.

Step 2: Setup/Layout

Nothing sets the tone for service and convenience like the layout of the area itself. Another ABC type of classification could be applied to establish a logical layout. A very effective layout might include an open stock area, one that might have been referred to as ‘free stock’ in the past. Behind the counter, MRO items are stocked so that the ‘A’ category items are closest to the window. Items considered to be ‘A’ items follow that classic Pareto-80/20 rule. ‘A’ items are those items that make up 80% of the issues. Further from the window are ‘B’ then ‘C’ items. Large, bulk items are further back still, and then critical spare parts.

Step 3: Staffing

Company attempts and insistence on keeping overhead low has really affected MRO staffing levels. This can negatively affect both service levels and security/control of stock as well. At a minimum, store room staffing should be consistent with plant operations; 24x7 or 8x5. Also, consider all the functions of store room personnel: receiving, reconciling, kitting, issuing, etc. There is a limit to line-items per store room clerk.

Step 4: Control

If it is impossible to staff the storeroom 24/7, access has got to be limited and controlled. There is no gray area in this mandate. All receipts and issues are entered into the CMMS, and all items issued from stores are assigned to a work order; again, no gray area.

The ‘control’ aspect of a world class storeroom also includes low-level authority to handle inventory adjustments with slow moving, idle, or obsolete parts.

Step 5: Managing the process

At some point, in fact, a requirement to be truly world class, all the processes performed in the storeroom have to be reduced to processes IN WRITING. How can we possibly expect to have our procedures followed if they aren’t written down? Write down the process, train people to the process. Modify the process as necessary.

A common prescription for most companies is to charter and launch as Stores Stock Committee. This high level oversight committed guides and supports the tactical work performed by those in the storeroom.

Step 6: Service

Window issues should be prompt and efficient. The written process steps indicating the correct method to use should clearly identify how the service is prompt and efficient. Keep it simple; the idea is to develop process steps that are easy to repeat. Practice doesn’t make perfect as much as practice makes permanent.

Storeroom kitting for enhanced planning and scheduling are processes within the storeroom sphere of responsibility that have to be considered when developing a service definition.

Step 7: Procedures

The list of procedures is far too long to list in a blog. Suffice to say, the list is divided into tactical and strategic. The strategic concerns are big, fiscally critical ‘decisions’ such as reorder point and economic order quantities. Parts standardization and critical spares evaluations are other high level strategic considerations.

The tactical sphere provides attention to the more dynamic and personal aspects of an MRO operation: cycle counting, receiving, purchasing, etc.

Step 8: Options

Some world class storerooms also participate in classic storeroom activities; they just do them at a very high level of performance. These include tool management, managing a project spare parts laydown area, and chemical/flammable storage.

Step 9: Supplier Involvement

A high performing storeroom and MRO operation tends to be very effective at establishing strategic sourcing relationships. The true world class processes can handle expanded open stock offerings, vendor managed inventory, and conduct supplier performance audits.

John L. Ross is a senior consultant at The Marshall Institute.



Top Plant
The Top Plant program honors outstanding manufacturing facilities in North America.
Product of the Year
The Product of the Year program recognizes products newly released in the manufacturing industries.
System Integrator of the Year
Each year, a panel of Control Engineering and Plant Engineering editors and industry expert judges select the System Integrator of the Year Award winners in three categories.
July/Aug
GAMS preview, 2018 Mid-Year Report, EAM and Safety
June 2018
2018 Lubrication Guide, Motor and maintenance management, Control system migration
May 2018
Electrical standards, robots and Lean manufacturing, and how an aluminum packaging plant is helping community growth.
April 2018
2017 Product of the Year winners, retrofitting a press, IMTS and Hannover Messe preview, natural refrigerants, testing steam traps
August 2018
SCADA standardization, capital expenditures, data-driven drilling and execution
June 2018
Machine learning, produced water benefits, programming cavity pumps
April 2018
ROVs, rigs, and the real time; wellsite valve manifolds; AI on a chip; analytics use for pipelines
Spring 2018
Burners for heat-treating furnaces, CHP, dryers, gas humidification, and more
August 2018
Choosing an automation controller, Lean manufacturing
February 2018
Setting internal automation standards

Annual Salary Survey

After two years of economic concerns, manufacturing leaders once again have homed in on the single biggest issue facing their operations:

It's the workers—or more specifically, the lack of workers.

The 2017 Plant Engineering Salary Survey looks at not just what plant managers make, but what they think. As they look across their plants today, plant managers say they don’t have the operational depth to take on the new technologies and new challenges of global manufacturing.

Read more: 2017 Salary Survey

The Maintenance and Reliability Coach's blog
Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
One Voice for Manufacturing
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Maintenance and Reliability Professionals Blog
The Society for Maintenance and Reliability Professionals an organization devoted...
Machine Safety
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
Research Analyst Blog
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Marshall on Maintenance
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
Lachance on CMMS
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.
Material Handling
This digital report explains how everything from conveyors and robots to automatic picking systems and digital orders have evolved to keep pace with the speed of change in the supply chain.
Electrical Safety Update
This digital report explains how plant engineers need to take greater care when it comes to electrical safety incidents on the plant floor.
IIoT: Machines, Equipment, & Asset Management
Articles in this digital report highlight technologies that enable Industrial Internet of Things, IIoT-related products and strategies.
Randy Steele
Maintenance Manager; California Oils Corp.
Matthew J. Woo, PE, RCDD, LEED AP BD+C
Associate, Electrical Engineering; Wood Harbinger
Randy Oliver
Control Systems Engineer; Robert Bosch Corp.
Data Centers: Impacts of Climate and Cooling Technology
This course focuses on climate analysis, appropriateness of cooling system selection, and combining cooling systems.
Safety First: Arc Flash 101
This course will help identify and reveal electrical hazards and identify the solutions to implementing and maintaining a safe work environment.
Critical Power: Hospital Electrical Systems
This course explains how maintaining power and communication systems through emergency power-generation systems is critical.
click me