Lean manufacturing can be measured for operational excellence in three ways to ensure manufacturers are getting the most efficiency and engagement from their workers and machines

05/20/2013


There are three common ways to measure the impact of Lean on operational excellence. The first is whether or not manufacturing sites are operating at world-class levels, which is often measured by attributes such as on-time delivery against published lead times. The second is to measure against cost efficiency metrics, such as productivity or the cost of scrap. Last, but most important, is engagement. This includes things such as how involved employees are in helping drive continuous improvement ideas and participating in Kaizen events and action workouts.

Many times in the Lean journey, teams move through a methodology on projects, deliver improvements, and move on to the next project. Six Sigma gives us the control phase to maintain changes for improvements, but even with that, it can be difficult to keep delivering benefits because the control phase itself can break down. Once momentum gets lost on the project, people can revert to their former processes that include waste—or teams may need to make necessary changes and inadvertently add waste back into processes.

By maintaining automated control over a process with computerized systems, manufacturers have a much better chance of reducing their waste in the long term. 

Enabling Lean and Lean Six-Sigma

One of the key steps in Lean is the identification of which steps add value and which do not. By classifying all the process activities into these two categories, it is then possible to start preserving value with less wok. Waste reduction is an effective way to increase profitability by reducing costs.

It is hard to discuss Lean and waste reduction without calling out the seven types of waste, easily remembered by the acronym TIMWOOD.

  • Transport: moving products that are not actually required to perform the processing
  • Inventory: all components, work in process, and finished product not being processed
  • Motion: people or equipment moving or walking more than is required to perform the processing
  • Waiting: waiting for the next production step
  • Overproduction: production ahead of demand
  • Over processing: resulting from poor tool or product design creating activity
  • Defects: the effort involved in inspecting for and fixing defects.

Many Lean initiatives start by looking at manual processes and defining them. Often, this exercise is the first time that a process is defined, documented, and analyzed. Right away, teams can see benefits from this exercise as obvious areas of waste can be immediately eliminated. The exercise takes time, as it is a manual process, but can be worthwhile because it drives good benefit.

As teams continue along the Lean journey, they start to roll out processes more broadly and develop spreadsheets to help execute processes and report on them. However, process modifications start to peak, and eventually teams see erosion begin to take place. People can go back to their old way of performing tasks without new processes being enforced. The value realized starts to decline, and leadership may move on to another type of improvement initiative.

However, the lifecycle of Lean projects and initiatives can continue to deliver value for the long term through manufacturing execution systems (MES) or computerized systems used in manufacturing that work in real time to enable the control of multiple elements of the production process (e.g., inputs, personnel, machines, and support services).

MES helps create efficient and high-quality manufacturing processes by providing real-time operational insight into a plant’s performance and information at a single source. These digital capabilities support Lean and Lean Six Sigma efforts in the following ways:

  • Graphically define and document work processes, making it much easier to start the Lean journey
  • Find and eliminate the non-value-add activities more quickly and easily
  • Execute work processes through a controlled, electronic system—ensuring that processes are followed
  • Improve processes in real time, not “after the fact”
  • Automatically capture, store, and analyze production data, closing the loop for continuous improvement
  • Digitize the control plan and its execution
  • Keep process improvements consistent, so projects keep adding value. 

To ensure we don’t let waste and inefficiencies creep back, IT technologies and digitization are important components to ensure we achieve sustained and scalable change. Standard work processes become embedded into the plant system, which can take Lean initiatives to the next level. With true standard work and an electronic environment for Kaizen, momentum remains high, waste is eliminated, and work processes are monitored—and the gains grow year after year.

Vince Campisi is CIO of GE Intelligent Platforms. 

GE Intelligent Platforms is a CSIA member as of 3/5/2015



Top Plant
The Top Plant program honors outstanding manufacturing facilities in North America.
Product of the Year
The Product of the Year program recognizes products newly released in the manufacturing industries.
System Integrator of the Year
Each year, a panel of Control Engineering and Plant Engineering editors and industry expert judges select the System Integrator of the Year Award winners in three categories.
June 2018
2018 Lubrication Guide, Motor and maintenance management, Control system migration
May 2018
Electrical standards, robots and Lean manufacturing, and how an aluminum packaging plant is helping community growth.
April 2018
2017 Product of the Year winners, retrofitting a press, IMTS and Hannover Messe preview, natural refrigerants, testing steam traps
June 2018
Machine learning, produced water benefits, programming cavity pumps
April 2018
ROVs, rigs, and the real time; wellsite valve manifolds; AI on a chip; analytics use for pipelines
February 2018
Focus on power systems, process safety, electrical and power systems, edge computing in the oil & gas industry
Spring 2018
Burners for heat-treating furnaces, CHP, dryers, gas humidification, and more
April 2018
Implementing a DCS, stepper motors, intelligent motion control, remote monitoring of irrigation systems
February 2018
Setting internal automation standards

Annual Salary Survey

After two years of economic concerns, manufacturing leaders once again have homed in on the single biggest issue facing their operations:

It's the workers—or more specifically, the lack of workers.

The 2017 Plant Engineering Salary Survey looks at not just what plant managers make, but what they think. As they look across their plants today, plant managers say they don’t have the operational depth to take on the new technologies and new challenges of global manufacturing.

Read more: 2017 Salary Survey

The Maintenance and Reliability Coach's blog
Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
One Voice for Manufacturing
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Maintenance and Reliability Professionals Blog
The Society for Maintenance and Reliability Professionals an organization devoted...
Machine Safety
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
Research Analyst Blog
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Marshall on Maintenance
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
Lachance on CMMS
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.
Electrical Safety Update
This digital report explains how plant engineers need to take greater care when it comes to electrical safety incidents on the plant floor.
Maintenance & Safety
The maintenance journey has been a long, slow trek for most manufacturers and has gone from preventive maintenance to predictive maintenance.
IIoT: Machines, Equipment, & Asset Management
Articles in this digital report highlight technologies that enable Industrial Internet of Things, IIoT-related products and strategies.
Randy Steele
Maintenance Manager; California Oils Corp.
Matthew J. Woo, PE, RCDD, LEED AP BD+C
Associate, Electrical Engineering; Wood Harbinger
Randy Oliver
Control Systems Engineer; Robert Bosch Corp.
Data Centers: Impacts of Climate and Cooling Technology
This course focuses on climate analysis, appropriateness of cooling system selection, and combining cooling systems.
Safety First: Arc Flash 101
This course will help identify and reveal electrical hazards and identify the solutions to implementing and maintaining a safe work environment.
Critical Power: Hospital Electrical Systems
This course explains how maintaining power and communication systems through emergency power-generation systems is critical.
click me