Top 10 ways to streamline a 'live factory' project

When designing a new project, consider these ten tips to evaluate whether you and your A/E are employing best practices

12/13/2013


When it comes to design and construction projects, the conventional design process is relatively straightforward: the client hires the firm, the client shares expectations and requirements for the project, the firm develops and refines the design, and the design is constructed.  Client expectations are confined to satisfaction with the final constructed state as it relates to functionality and aesthetics.

The rules change when the facility is already built and operating and cannot be shut down for the sake of the project.  While the objective of the project remains the same as in a conventional construction project—a functional, code-compliant design—the path to achieving a complete design and getting the project constructed under budget is far more complicated.  This is especially so in large facilities that contain multiple exhaust streams and scores of gas, water, and chemical distribution systems—particularly when these processes and systems have an array of “owners.”

From the perspective of designers and engineers, the difference between designing and constructing a brand-new facility versus designing and constructing for “live factory” projects is very important and can greatly impact the success of your project. 

Successful design and construction firms recognize the unique challenges inherent in taking on a significant project within an existing space. This article offers insights into these challenges and provides 10 great tips that can serve as a checklist of sorts to evaluate whether you and your A/E supplier are employing best practices on your new design project.

Ten recommendations

1. Always be mindful that the A/E firm is a consultant accountable only to the project manager (PM). As the design is developed and the A/E interacts with stakeholders, new requirements and scope will be discovered, some more justified than the rest. The PM must decipher which of these elements should be incorporated into the project and determine the value of added design and construction costs.   

2. Do not underestimate project impacts to pipelines, electrical panels or equipment.  Necessary work-arounds may require engineered designs, bypass piping, or ductwork. Temporary facilities or HVAC and/or a plan for partial plant or equipment shutdowns may also need to be provided.

 

3. Keep the system owners in the loop. Generally, the purpose of projects is to upgrade or improve their systems. Being that they operate the systems, they can provide valuable insights for improvements or report system inadequacies. Sometimes projects can be oriented to be "win-win" by rectifying already existing issues at no incremental cost. System owners are also very aware of what commissioning the systems will entail. Can elements of what they need be incorporated into the design package?

4. Field verification is crucial. Moving even small conduits, pipes or tubes in live factories can sometimes be impossible. Conflicts must be identified prior to releasing a design with foreknowledge that obstacles will be moved or the design will accommodate the obstacle in place. Diligence on the part of the A/E firm to identify conflicts between design elements and existing obstacles and decision making on the part of the facility's stakeholders to decide how to accommodate these conflicts in the design in a timely fashion is crucial to project success.

 

5. When new equipment is being placed on a factory floor, consider move-in paths. Can the equipment physically get from the loading dock to its installation location in one piece? Equipment may have to be designed or ordered in pieces or scope may need to be included to clear a path.

6. Interim conditions can be a crucial consideration. While the existing state works for the facility and the final constructed state also works, what about the state during construction? Is there room for the work-around and the new construction to exist simultaneously? Can the facility continue to operate between the taking down of a piece of old equipment and the installation of new equipment?

7. Get buy-off from system and process owners during design development to shut down or modify systems. Sometimes the “obvious Plan A” is a no-go.  For instance, the nearest available tie-in that can be used might be hundreds of feet further away than expected, which adds significant project cost. System and process owner input is crucial with these considerations.

8. Analyze connections to piping and ductwork during design development. Some piping and ductwork materials or contents are not appropriate for hot-tapping either for engineering reasons, facility safety, or operational protocols. That said, if the design requires connecting to a system that doesn’t have an available connection and cannot be shut down, the facility is going to have to consent to the use of an existing connection or coordinate a shut-down of that system to make a tie-in.

9. Focus design review sessions around the issue of system interruptions and associated ramifications. It is easy for an A/E to overestimate the effectiveness of communications within their client’s organization. Try to get system owners and process owners engaged in the discussion of anticipated system interruptions.

10. Consider air quality requirements within the facility. Air quality can be an important concern to process owners at facilities that make food products, pharmaceuticals, microprocessors, etc. Concrete saw-cutting, welding, painting, gluing and roof work are just a few construction activities that produce dust or odors. Watch where outside air is taken in relative to these activities. Watch also for pressurization relationships between areas within the facility and outdoors.

 

Julian Quist, PE, is a mechanical engineer with SSOE Group. 



Top Plant
The Top Plant program honors outstanding manufacturing facilities in North America.
Product of the Year
The Product of the Year program recognizes products newly released in the manufacturing industries.
System Integrator of the Year
Each year, a panel of Control Engineering and Plant Engineering editors and industry expert judges select the System Integrator of the Year Award winners in three categories.
June 2018
2018 Lubrication Guide, Motor and maintenance management, Control system migration
May 2018
Electrical standards, robots and Lean manufacturing, and how an aluminum packaging plant is helping community growth.
April 2018
2017 Product of the Year winners, retrofitting a press, IMTS and Hannover Messe preview, natural refrigerants, testing steam traps
June 2018
Machine learning, produced water benefits, programming cavity pumps
April 2018
ROVs, rigs, and the real time; wellsite valve manifolds; AI on a chip; analytics use for pipelines
February 2018
Focus on power systems, process safety, electrical and power systems, edge computing in the oil & gas industry
Spring 2018
Burners for heat-treating furnaces, CHP, dryers, gas humidification, and more
April 2018
Implementing a DCS, stepper motors, intelligent motion control, remote monitoring of irrigation systems
February 2018
Setting internal automation standards

Annual Salary Survey

After two years of economic concerns, manufacturing leaders once again have homed in on the single biggest issue facing their operations:

It's the workers—or more specifically, the lack of workers.

The 2017 Plant Engineering Salary Survey looks at not just what plant managers make, but what they think. As they look across their plants today, plant managers say they don’t have the operational depth to take on the new technologies and new challenges of global manufacturing.

Read more: 2017 Salary Survey

The Maintenance and Reliability Coach's blog
Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
One Voice for Manufacturing
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Maintenance and Reliability Professionals Blog
The Society for Maintenance and Reliability Professionals an organization devoted...
Machine Safety
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
Research Analyst Blog
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Marshall on Maintenance
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
Lachance on CMMS
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.
Electrical Safety Update
This digital report explains how plant engineers need to take greater care when it comes to electrical safety incidents on the plant floor.
Maintenance & Safety
The maintenance journey has been a long, slow trek for most manufacturers and has gone from preventive maintenance to predictive maintenance.
IIoT: Machines, Equipment, & Asset Management
Articles in this digital report highlight technologies that enable Industrial Internet of Things, IIoT-related products and strategies.
Randy Steele
Maintenance Manager; California Oils Corp.
Matthew J. Woo, PE, RCDD, LEED AP BD+C
Associate, Electrical Engineering; Wood Harbinger
Randy Oliver
Control Systems Engineer; Robert Bosch Corp.
Data Centers: Impacts of Climate and Cooling Technology
This course focuses on climate analysis, appropriateness of cooling system selection, and combining cooling systems.
Safety First: Arc Flash 101
This course will help identify and reveal electrical hazards and identify the solutions to implementing and maintaining a safe work environment.
Critical Power: Hospital Electrical Systems
This course explains how maintaining power and communication systems through emergency power-generation systems is critical.
click me