Six ways to avoid electrical testing problems

It is important to safely start up electrical systems and restarting them securely after routine maintenance has taken place. Six tips to avoid these problems are highlighted below.

11/08/2016


It is important to safely start up electrical systems and restarting them securely after routine maintenance has taken place to avoid an problems that may occur. Courtesy: L&S ElectricIn any large-scale industrial facility, one of the critical times where problems occur is starting up electrical systems and restarting them after routine maintenance has taken place. In either case, it is important to do so both safely and securely to reduce any problems that could occur. Those problems may be associated with a reduced equipment lifespan. Alternatively, with the safety of those who work in the area.

When it is time to start the electrical systems at your facility, use technicians who have specialized training. This includes any electrical testing and troubleshooting required for the startup to occur without problems. Any issues occurring during this time may result in a loss of productivity due to unnecessary delays. Perform several tests before startup to ensure that everything goes off without a hitch.

Consider these six kinds of electrical testing to avoid potential problems:

  • Partial discharge testing: Partial discharges occur within the insulation of high or medium voltage electrical equipment. They are tiny electrical sparks and occur as a result of an air pocket breaking down within the insulation. Over time, they could erode the insulation and eventually, may lead to the failure of the insulation. Partial discharge testing can be part of an ongoing predictive maintenance program.
  • Insulation resistance testing: This test, sometimes known as the Megger, applies DC voltage to a particular spot within the insulation to test for resistance. The measure of the resistance can determine the condition of the insulation.
  • Contact resistance: Also referred to as the Ductor Test. The contact resistance test checks the resistance of electrical connections, including the connectors, joints, and terminations. It is one way to detect specific problems, such as eroded contact surfaces, loose connections, and corroded contacts.
  • Primary injection testing: This type of testing is typically associated with high-voltage power distribution systems. It injects a test current into the primary side of the system to see how it behaves with that level of current. Secondary injection testing may also be of value. However, it applies the test current to the trip relay directly on the secondary side.
  • Power factor: This test is typically performed on large transformers. It ensures the integrity of the insulation is still intact.

Gas sampling: Sometimes referred to as dissolved gas analysis, it looks at the gases in transformer oil. Testing the oil in this manner determines the level of equipment breakdown since insulating materials liberate gases as they break down.

Along with running these tests as part of a routine preventative maintenance program, there may be some other factors to consider as well. By testing the equipment regularly and doing any repairs that are necessary before they become a major problem, it can help to save your business money and prevent costly and inconvenient downtime.

- David Manney is a marketing administrator at L&S Electric. This article originally appeared on L&S Electric Watts New BlogL&S Electric Inc. is a CFE Media content partner.



Top Plant
The Top Plant program honors outstanding manufacturing facilities in North America.
Product of the Year
The Product of the Year program recognizes products newly released in the manufacturing industries.
System Integrator of the Year
Each year, a panel of Control Engineering and Plant Engineering editors and industry expert judges select the System Integrator of the Year Award winners in three categories.
May 2018
Electrical standards, robots and Lean manufacturing, and how an aluminum packaging plant is helping community growth.
April 2018
2017 Product of the Year winners, retrofitting a press, IMTS and Hannover Messe preview, natural refrigerants, testing steam traps
March 2018
SCCR, 2018 Maintenance study, and VFDs in a washdown environment.
June 2018
Machine learning, produced water benefits, programming cavity pumps
April 2018
ROVs, rigs, and the real time; wellsite valve manifolds; AI on a chip; analytics use for pipelines
February 2018
Focus on power systems, process safety, electrical and power systems, edge computing in the oil & gas industry
Spring 2018
Burners for heat-treating furnaces, CHP, dryers, gas humidification, and more
April 2018
Implementing a DCS, stepper motors, intelligent motion control, remote monitoring of irrigation systems
February 2018
Setting internal automation standards

Annual Salary Survey

After two years of economic concerns, manufacturing leaders once again have homed in on the single biggest issue facing their operations:

It's the workers—or more specifically, the lack of workers.

The 2017 Plant Engineering Salary Survey looks at not just what plant managers make, but what they think. As they look across their plants today, plant managers say they don’t have the operational depth to take on the new technologies and new challenges of global manufacturing.

Read more: 2017 Salary Survey

The Maintenance and Reliability Coach's blog
Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
One Voice for Manufacturing
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Maintenance and Reliability Professionals Blog
The Society for Maintenance and Reliability Professionals an organization devoted...
Machine Safety
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
Research Analyst Blog
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Marshall on Maintenance
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
Lachance on CMMS
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.
Maintenance & Safety
The maintenance journey has been a long, slow trek for most manufacturers and has gone from preventive maintenance to predictive maintenance.
Industrial Analytics
This digital report explains how plant engineers and subject matter experts (SME) need support for time series data and its many challenges.
IIoT: Operations & IT
This digital report will explore several aspects of how IIoT will transform manufacturing in the coming years.
Randy Steele
Maintenance Manager; California Oils Corp.
Matthew J. Woo, PE, RCDD, LEED AP BD+C
Associate, Electrical Engineering; Wood Harbinger
Randy Oliver
Control Systems Engineer; Robert Bosch Corp.
Data Centers: Impacts of Climate and Cooling Technology
This course focuses on climate analysis, appropriateness of cooling system selection, and combining cooling systems.
Safety First: Arc Flash 101
This course will help identify and reveal electrical hazards and identify the solutions to implementing and maintaining a safe work environment.
Critical Power: Hospital Electrical Systems
This course explains how maintaining power and communication systems through emergency power-generation systems is critical.
click me