Today is a dose of reality, a tantalizing tenet of truth, a point to ponder, if you will. The point is you have to pay for the sins of the past, whether you are talking about your health or the reliability of your facility. Said differently, you can't smoke for 25 years and expect to have the lungs of a track star the day you quit.

Now, I know this seems obvious—but if it truly were obvious, then companies would not expect wholesale change in an organization instantaneously upon implementation of a new improvement strategy.

For example, I recently visited a facility that has made great strides by implementing things like planning and scheduling, precision maintenance, root-cause analysis, reliability-centered maintenance and predictive technologies, but yet they were being described by some as ineffective and the efforts as a waste because the assets were still failing. Let me clearly state, if your site has been installing bearings with a hammer and a punch or aligning motors with string and a straight edge for the last 25 years, then implementing precision maintenance will not fix all your problems overnight. Every defect that has been introduced to the asset base over the last 25 years will have to be detected and removed through replacement before you can comfortably say that the assets are healthy and precision is the norm.

Most of us can't afford to replace all the components damaged by our past sins, so we look at the risk and the cost and we develop a plan that is perceived as having a reasonable chance of success. This will include some failures. Hopefully, less of them will be a surprise as we mature into a more predictive-maintenance application, but they will still appear.

If you are implementing any improvement strategies at your site, make sure that as part of your communication plan you let people know of the success that you expect, of course, as well as the sins of the past that will still need to be worked through. If we set this expectation early, then the transparency will drive the change forward. Remember, you can't drive like a drunk in a rental car jumping ditches, and then change the oil and expect it to be a new car again. What have you done to acknowledge and mitigate the risk of your past reliability sins?

- Shon Isenhour is a founding partner of Eruditio. This article originally appeared on Eruditio's blog. Eruditio is a CFE Media content partner. Edited by Erin Dunne, production coordinator, CFE Media, edunne@cfemedia.com



Top Plant
The Top Plant program honors outstanding manufacturing facilities in North America.
Product of the Year
The Product of the Year program recognizes products newly released in the manufacturing industries.
System Integrator of the Year
Each year, a panel of Control Engineering and Plant Engineering editors and industry expert judges select the System Integrator of the Year Award winners in three categories.
June 2018
2018 Lubrication Guide, Motor and maintenance management, Control system migration
May 2018
Electrical standards, robots and Lean manufacturing, and how an aluminum packaging plant is helping community growth.
April 2018
2017 Product of the Year winners, retrofitting a press, IMTS and Hannover Messe preview, natural refrigerants, testing steam traps
June 2018
Machine learning, produced water benefits, programming cavity pumps
April 2018
ROVs, rigs, and the real time; wellsite valve manifolds; AI on a chip; analytics use for pipelines
February 2018
Focus on power systems, process safety, electrical and power systems, edge computing in the oil & gas industry
Spring 2018
Burners for heat-treating furnaces, CHP, dryers, gas humidification, and more
April 2018
Implementing a DCS, stepper motors, intelligent motion control, remote monitoring of irrigation systems
February 2018
Setting internal automation standards

Annual Salary Survey

After two years of economic concerns, manufacturing leaders once again have homed in on the single biggest issue facing their operations:

It's the workers—or more specifically, the lack of workers.

The 2017 Plant Engineering Salary Survey looks at not just what plant managers make, but what they think. As they look across their plants today, plant managers say they don’t have the operational depth to take on the new technologies and new challenges of global manufacturing.

Read more: 2017 Salary Survey

The Maintenance and Reliability Coach's blog
Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
One Voice for Manufacturing
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Maintenance and Reliability Professionals Blog
The Society for Maintenance and Reliability Professionals an organization devoted...
Machine Safety
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
Research Analyst Blog
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Marshall on Maintenance
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
Lachance on CMMS
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.
Electrical Safety Update
This digital report explains how plant engineers need to take greater care when it comes to electrical safety incidents on the plant floor.
Maintenance & Safety
The maintenance journey has been a long, slow trek for most manufacturers and has gone from preventive maintenance to predictive maintenance.
IIoT: Machines, Equipment, & Asset Management
Articles in this digital report highlight technologies that enable Industrial Internet of Things, IIoT-related products and strategies.
Randy Steele
Maintenance Manager; California Oils Corp.
Matthew J. Woo, PE, RCDD, LEED AP BD+C
Associate, Electrical Engineering; Wood Harbinger
Randy Oliver
Control Systems Engineer; Robert Bosch Corp.
Data Centers: Impacts of Climate and Cooling Technology
This course focuses on climate analysis, appropriateness of cooling system selection, and combining cooling systems.
Safety First: Arc Flash 101
This course will help identify and reveal electrical hazards and identify the solutions to implementing and maintaining a safe work environment.
Critical Power: Hospital Electrical Systems
This course explains how maintaining power and communication systems through emergency power-generation systems is critical.
click me