Manufacturing and industrial facilities can be particularly complex projects, involving large facilities containing behemoth machinery, hazardous chemicals, and a range of other concerns. The draw on the local power system is a key factor for electrical engineers to consider.

06/30/2014


C. Erik Larson, PE, LEED AP BD+C, Principal, Industrial Systems, Wood Harbinger, Bellevue, Wash.Ronald R. Regan, PE, Principal, Triad Consulting Engineers, Morris Plains, N.J.John Schlagetter, NCARB, PMP, CSI, CCS, CCCA, LEED Green Associate, Senior Architect, Process Plus, CincinnatiWallace Sims, SET, NICET Fire Alarm Level IV, Lead Life Safety Engineer, CH2M Hill, Portland, Ore.

  • C. Erik Larson, PE, LEED AP BD+C, Principal, Industrial Systems, Wood Harbinger, Bellevue, Wash.
  • Ronald R. Regan, PE, Principal, Triad Consulting Engineers, Morris Plains, N.J.
  • John Schlagetter, NCARB, PMP, CSI, CCS, CCCA, LEED Green Associate, Senior Architect, Process Plus, Cincinnati
  • Wallace Sims, SET, NICET Fire Alarm Level IV, Lead Life Safety Engineer, CH2M Hill, Portland, Ore.

The University of Oregon’s central heating/cooling plant called for new systems to connect directly to the University’s grid rather than the local public utility district (PUD) grid. All graphics courtesy: Wood HarbingerCSE: Describe some recent electrical/power system challenges you encountered when designing a new building or working in an existing building.

Regan: A client acquired an existing 20-story high-rise with the intent of duplicating an existing data center environment he has in another state with more than 250,000 sq ft of white space. The building’s power system, while extensive and capable, was no match for the anticipated load. Compounding the fact was that the facility sits on the Hudson River and was a victim of Hurricane Sandy flooding. The first issue was negotiating with the utility for two new 38 kV class feeders, and the second was to fit 38 kV class switchgear in one half of the space normally required (all the room left in the approved electrical vault). Our firm worked hand-in-hand with a custom switchgear manufacturer to design a one-of-a-kind, high fault duty rated compact lineup that needed to be approved by both the city inspector and the utility. Working as a team to solve the problem, the city, the utility, and our firm produced a viable solution. This design is now being considered by the utility for Hurricane Sandy victims that must move their substations from below grade or at grade to higher floor locations. The more compact and lighter switchgear helps make such a migration more acceptable with fewer structural modifications needed.

Larson: When working with the University of Oregon, it needed its new systems to connect directly to the university’s grid rather than the local public utility district (PUD) grid. This required a very complex modeling program to ensure smooth operation and uninterrupted service. Eighty-nine potential switching configurations were established, either manually prompted by the university or by the automatic controls. The challenge was determining the appropriate data needed for proper simulation for each of those 89 configurations, as well as how to test without damaging the systems or equipment. This resulted in an extensive matrix that systematically kept track of the various possibilities. Based on the modeling results, the university was assured that the installation could work reliably.

CSE: How do you balance the need for reliable power with the desire for efficiency and sustainability?

Regan: As more of our projects seek to be LEED certified and the pressure is on to deliver efficient/sustainable projects, yet with high reliability, we must perform the needed balancing act. Interestingly, some thought processes for achieving efficiency goals lead to better reliability. Electrically, we see decisions to purchase more expensive high-efficient equipment such as transformers, HVAC equipment, and variable frequency drive (VFD) packages to save energy and decrease carbon footprint, and then there is the realization that this more costly equipment is actually more robust and reliable and, thus, achieves our reliability goals, too.

Larson: At the University of Oregon, we were able to use a cogeneration system that had the capability to increase power reliability without compromising the efficiency or sustainability of the system. The combined cycle system could be operated in parallel with the utility or as an independent grid or island, separate from the utility as a micro-grid. By operating in an island configuration, Wood Harbinger was able to mitigate any extended utility outage, thus maintaining campus operations. Because of the increased efficiency, the amount of fossil fuels released was dramatically reduced, and the university received a savings of more than $700,000.

CSE: What low- and medium-voltage power challenges have you overcome?

Larson: The project at the University of Oregon was a complex medium-voltage power solution. The new medium-voltage switchgear is a 4-bus ring configuration. Bus A was fed from the utility and connected to half of the campus feeders, Bus B also has a separate utility feed, 7.5 MW of cogeneration, and is connected to the other half of the campus; it is connected to Bus A via a tiebreaker. Bus G has three 2.275 MW diesel generators and room for a fourth, and it is connected to Bus A and Bus S via tiebreakers. Bus S feeds all the standby power feeders on campus, and is connected to Bus B and Bus G via a tiebreaker. The new chiller plant and upgrades to the boiler plant required a new service from the utility; this required the building to be on a new 60 MW double-ended substation for the university. Wood Harbinger worked with the university, the local utility, the contractor, the switchgear manufacturer, the diesel generator manufacturer, and the cogeneration equipment manufacturer to ensure that all the components would be able to be paralleled together and would correctly reconfigure the system and switchgear, without interrupting power to the campus, if any of the 89 scenarios happened.

Regan: On overseas projects, especially in developing countries, we often run into the problem of unskilled workers in a high-tech world. Some of these countries limit ex-patriot supervision and entrance into the country. On a project in the Middle East, the concept of duct banks, high-voltage splicing, and cable pulling was too much for the assigned (by the government) local contractor to grasp and execute. As they were very capable of digging trenches, we worked with a U.S. cable manufacturer to deliver “oversized reels” of 15 kV metal-clad armored cable, “cable in flexible conduit,” to our local contractor. We were able to run from switchgear to all terminals with no manholes, no cable pulling, and no splicing. All terminations, as there was a manageable amount, were handled by our ex-pat team of supervisors/splicers.


<< First < Previous 1 2 Next > Last >>

No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2015 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
World-class maintenance: The three keys to success - Deploy people, process and technology; 2016 Lubrication Guide; Why hydraulic systems get hot
Your leaks start here: Take a disciplined approach with your hydraulic system; U.S. presence at Hannover Messe a rousing success
Hannover Messe 2016: Taking hold of the future - Partner Country status spotlights U.S. manufacturing; Honoring manufacturing excellence: The 2015 Product of the Year Winners
The digital oilfield: Utilizing Big Data can yield big savings; Virtualization a real solution; Tracking SIS performance
Getting to the bottom of subsea repairs: Older pipelines need more attention, and operators need a repair strategy; OTC preview; Offshore production difficult - and crucial
Digital oilfields: Integrated HMI/SCADA systems enable smarter data acquisition; Real-world impact of simulation; Electric actuator technology prospers in production fields
Improving flowmeter calibration; Selecting flowmeters for natural gas; Case study: Streamlining assembly systems using PC-based control; CLPM: Improving process efficiency, throughput
Putting COPS into context; Designing medium-voltage electrical systems; Planning and designing resilient, efficient data centers; The nine steps of designing generator fuel systems
Warehouse winter comfort: The HTHV solution; Cooling with natural gas; Plastics industry booming

Annual Salary Survey

Before the calendar turned, 2016 already had the makings of a pivotal year for manufacturing, and for the world.

There were the big events for the year, including the United States as Partner Country at Hannover Messe in April and the 2016 International Manufacturing Technology Show in Chicago in September. There's also the matter of the U.S. presidential elections in November, which promise to shape policy in manufacturing for years to come.

But the year started with global economic turmoil, as a slowdown in Chinese manufacturing triggered a worldwide stock hiccup that sent values plummeting. The continued plunge in world oil prices has resulted in a slowdown in exploration and, by extension, the manufacture of exploration equipment.

Read more: 2015 Salary Survey

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.
This article collection contains several articles on the vital role that compressed air plays in manufacturing plants.
This article collection contains several articles on the Industrial Internet of Things (IIoT) and how it is transforming manufacturing.
This article collection contains several articles on strategic maintenance and understanding all the parts of your plant.
click me