How a digital PSM program can save you time

Digital process safety management (PSM) programs are becoming more widely viewed as a best practice for facility owners, requiring less time and resources for auditing and documentation.

03/18/2015


Digital PSM programs require less time and resources for auditing and documentation. Courtesy: StellarWhat if I told you that your facility could shorten its process safety management (PSM) audit from four days to four hours? This was a reality for a plant I audited recently—all thanks to its digital PSM program. Digital PSM programs are becoming more widely viewed as a best practice for facility owners, requiring less time and resources for auditing and documentation. In an era where we’re all short on time and resources, I’ve outlined below how a digital PSM program can save you both.  

Efficient audits

Typically when the Occupational Safety and Health Administration (OSHA) comes to your facility to conduct an audit, you take out your books and let them have at it. That’s when your control stops. The auditor can spend days flipping through all of your paperwork.

But with a digital PSM program, you have the control. Instead of handing over your books to OSHA, you can take a projector and shoot your digital PSM program on the wall, controlling the audit from there. You have the auditor tell you what they want to see and you pull it up. You’re in the driver’s seat.

Standard operating procedures

With a digital PSM program, you will save a significant amount of time during the auditing of your standard operating procedures (SOPs). Your facility may have 60, but if you have a digital PSM program, you can ask the auditor which specific SOP they would like to see instead of waiting for them to flip through ALL of them individually.

Storage

As an OSHA mandate, you must present your two most recent compliance audit reports. Paper copies can be difficult to keep track of; however with digital PSM, all of your files are in a central, electronic folder.

Preventive maintenance

In addition to refrigeration, you have plenty of other maintenance-related tasks for equipment in your facility. Often, plants use a separate, computerized maintenance management system (CMMS) to generate preventive maintenance (PM) tasks on a regular basis. However, this can be completed on a digital PSM program, too, saving you the time, money and hassle of an additional software program.

This article originally appeared on Stellar's Food for Thought blog. Stellar is a CFE content partner. Edited by Joy Chang, digital project manager, CFE Media, jchang@cfemedia.com



Top Plant
The Top Plant program honors outstanding manufacturing facilities in North America.
Product of the Year
The Product of the Year program recognizes products newly released in the manufacturing industries.
System Integrator of the Year
Each year, a panel of Control Engineering and Plant Engineering editors and industry expert judges select the System Integrator of the Year Award winners in three categories.
October 2018
Tools vs. sensors, functional safety, compressor rental, an operational network of maintenance and safety
September 2018
2018 Engineering Leaders under 40, Women in Engineering, Six ways to reduce waste in manufacturing, and Four robot implementation challenges.
July/Aug
GAMS preview, 2018 Mid-Year Report, EAM and Safety
October 2018
2018 Product of the Year; Subsurface data methodologies; Digital twins; Well lifecycle data
August 2018
SCADA standardization, capital expenditures, data-driven drilling and execution
June 2018
Machine learning, produced water benefits, programming cavity pumps
Spring 2018
Burners for heat-treating furnaces, CHP, dryers, gas humidification, and more
October 2018
Complex upgrades for system integrators; Process control safety and compliance
September 2018
Effective process analytics; Four reasons why LTE networks are not IIoT ready

Annual Salary Survey

After two years of economic concerns, manufacturing leaders once again have homed in on the single biggest issue facing their operations:

It's the workers—or more specifically, the lack of workers.

The 2017 Plant Engineering Salary Survey looks at not just what plant managers make, but what they think. As they look across their plants today, plant managers say they don’t have the operational depth to take on the new technologies and new challenges of global manufacturing.

Read more: 2017 Salary Survey

The Maintenance and Reliability Coach's blog
Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
One Voice for Manufacturing
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Maintenance and Reliability Professionals Blog
The Society for Maintenance and Reliability Professionals an organization devoted...
Machine Safety
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
Research Analyst Blog
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Marshall on Maintenance
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
Lachance on CMMS
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.
Material Handling
This digital report explains how everything from conveyors and robots to automatic picking systems and digital orders have evolved to keep pace with the speed of change in the supply chain.
Electrical Safety Update
This digital report explains how plant engineers need to take greater care when it comes to electrical safety incidents on the plant floor.
IIoT: Machines, Equipment, & Asset Management
Articles in this digital report highlight technologies that enable Industrial Internet of Things, IIoT-related products and strategies.
Randy Steele
Maintenance Manager; California Oils Corp.
Matthew J. Woo, PE, RCDD, LEED AP BD+C
Associate, Electrical Engineering; Wood Harbinger
Randy Oliver
Control Systems Engineer; Robert Bosch Corp.
Data Centers: Impacts of Climate and Cooling Technology
This course focuses on climate analysis, appropriateness of cooling system selection, and combining cooling systems.
Safety First: Arc Flash 101
This course will help identify and reveal electrical hazards and identify the solutions to implementing and maintaining a safe work environment.
Critical Power: Hospital Electrical Systems
This course explains how maintaining power and communication systems through emergency power-generation systems is critical.
Design of Safe and Reliable Hydraulic Systems for Subsea Applications
This eGuide explains how the operation of hydraulic systems for subsea applications requires the user to consider additional aspects because of the unique conditions that apply to the setting
click me