Five questions to answer before your next change initiative

Below are five question that are crucial to answer upfront, repeatedly, and through multiple mediums.

08/25/2016


Shon Isenhour, principal at Eduditio, LLC.We all are part of change initiatives. Interestingly, the majority of them fail to deliver the results expected or projected. When we look back at the ones that failed to deliver, we find many that were destined to fail from the beginning because of the way the change was unveiled and communicated to the affected individuals. Below are five question that are crucial to answer upfront, repeatedly, and through multiple mediums. I will demonstrate the questions using a hypothetical enterprise asset management system (EAM) or computerized maintenance management system (CMMS) implementation as the example and share a few elements that satisfy a portion of the questions.

1. Why are we doing this?

Example: Tell them about the transparency the new EAM provides. You might also share the fact that it is connected with all of the other management systems, from procurement to human resources, and it allows the business to be better managed by tearing down the walls between these departments. In the end, it will make the business more efficient and will help us to surpass our competitors.

2. What does this look like?

Example: Show them the master project plan for the EAM rollout with the dates and areas of focus. Allow them to drill down into the plan so they can see the details where it is of interest. This will help with the next question.

3. How will it affect me? What's in it for me?

Example: Show them how the new system will change their current role. Whenever possible, show them areas where the new system is easier and better for them. This can be done with the workflow process maps or the RASI or RACI documents that were created during the blueprinting phase of the EAM implementation.

4. What do you expect from me?

Example: This is where you can take them through the "Rs": responsibilities relating to their role. These are shown in the RASI documents. These responsibilities are required for the process to work effectively and they show what you need for them to do specifically to meet the needs of the change.

5. What can I expect from you?

Example: This is where you might share the Rs that you own and what you will also provide from an "A," or accountability, standpoint.

These examples only begin to scratch the surface of the information that you need to provide, but they should give you some context for each question. Please take the time to plan out how you are going to communicate each of these points to all the different groups that will be affected by the change.

Shon Isenhour is a founding partner at Eruditio and is a part of Plant Engineering's Editorial Advisory Board. This article originally appeared on Eruditio's blog. Eruditio is a CFE Media content partner.



Top Plant
The Top Plant program honors outstanding manufacturing facilities in North America.
Product of the Year
The Product of the Year program recognizes products newly released in the manufacturing industries.
System Integrator of the Year
Each year, a panel of Control Engineering and Plant Engineering editors and industry expert judges select the System Integrator of the Year Award winners in three categories.
June 2018
2018 Lubrication Guide, Motor and maintenance management, Control system migration
May 2018
Electrical standards, robots and Lean manufacturing, and how an aluminum packaging plant is helping community growth.
April 2018
2017 Product of the Year winners, retrofitting a press, IMTS and Hannover Messe preview, natural refrigerants, testing steam traps
June 2018
Machine learning, produced water benefits, programming cavity pumps
April 2018
ROVs, rigs, and the real time; wellsite valve manifolds; AI on a chip; analytics use for pipelines
February 2018
Focus on power systems, process safety, electrical and power systems, edge computing in the oil & gas industry
Spring 2018
Burners for heat-treating furnaces, CHP, dryers, gas humidification, and more
April 2018
Implementing a DCS, stepper motors, intelligent motion control, remote monitoring of irrigation systems
February 2018
Setting internal automation standards

Annual Salary Survey

After two years of economic concerns, manufacturing leaders once again have homed in on the single biggest issue facing their operations:

It's the workers—or more specifically, the lack of workers.

The 2017 Plant Engineering Salary Survey looks at not just what plant managers make, but what they think. As they look across their plants today, plant managers say they don’t have the operational depth to take on the new technologies and new challenges of global manufacturing.

Read more: 2017 Salary Survey

The Maintenance and Reliability Coach's blog
Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
One Voice for Manufacturing
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Maintenance and Reliability Professionals Blog
The Society for Maintenance and Reliability Professionals an organization devoted...
Machine Safety
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
Research Analyst Blog
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Marshall on Maintenance
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
Lachance on CMMS
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.
Electrical Safety Update
This digital report explains how plant engineers need to take greater care when it comes to electrical safety incidents on the plant floor.
Maintenance & Safety
The maintenance journey has been a long, slow trek for most manufacturers and has gone from preventive maintenance to predictive maintenance.
IIoT: Machines, Equipment, & Asset Management
Articles in this digital report highlight technologies that enable Industrial Internet of Things, IIoT-related products and strategies.
Randy Steele
Maintenance Manager; California Oils Corp.
Matthew J. Woo, PE, RCDD, LEED AP BD+C
Associate, Electrical Engineering; Wood Harbinger
Randy Oliver
Control Systems Engineer; Robert Bosch Corp.
Data Centers: Impacts of Climate and Cooling Technology
This course focuses on climate analysis, appropriateness of cooling system selection, and combining cooling systems.
Safety First: Arc Flash 101
This course will help identify and reveal electrical hazards and identify the solutions to implementing and maintaining a safe work environment.
Critical Power: Hospital Electrical Systems
This course explains how maintaining power and communication systems through emergency power-generation systems is critical.
click me