Ensuring proper grounding will make data management a better managed and safer process. Photo courtesy of Allied Reliability.In April of 2010, I took over the responsibilities of vibration data collection and analysis at a salt evaporation plant in upper New York. The site has a history of having a robust condition-based monitoring program using infrared, ultrasonic, motor current analysis, and vibration technologies. For vibration, the site uses Commtest equipment and software. Its data collector was a VB7.

On my first day of route data collection, I came upon a variable speed pump. I attached the transducer to the motor and attempted to enter the machine speed using the keypad. When I pressed a key, the digit would be entered between two and four times onto the screen. I cleared the speed on the screen and tried again. The same thing happened. I attempted a third time with the same results. Knowing I could set the speed in the Ascent software, I took the data using the default speed. When I analyzed the data, I would set the speed using the run speed peak as a reference.

In March of 2011, an e-mail was distributed within my group concerning other analysts having the same issue. We were informed that a software patch was being developed that would correct the problem. Knowing others were having the same problem, I decided to further investigate the cause of the issue.

I attempted to take data with the VB7 on a pump that I knew would produce the symptom. I attached the transducer and tried to enter the speed. I had the same results as before. This made me think the cable was picking up stray radio frequencies and causing interference in the collector. I took the transducer off the motor and attempted to enter the speed. I still had the same issue. I walked away about 10 ft (3.3 meters) from the pump motor and tried to enter the speed. I had no problems. This piece of information led me to believe there was some sort of radio interference coming from the variable frequency drive.

My first idea was to consider the ground for the motor, as insufficient grounding can cause bearing defects by arcing across the bearing surfaces. I had not seen any vibration signatures of bearing fluting; however, I asked the site maintenance planner to have an electrician attach an auxiliary ground to the motor. When the electrician received the work request he told me this could not cause the issue. The electrician then installed the auxiliary ground.

After the electrician installed the ground, I attempted to take measurements again on the motor. I entered the digits for the speed with no issues whatsoever. I moved the transducer around the motor to see if there was a place where I could cause the digit error. I could not replicate the problem. This solved my data collector problem.

I told the electrician the ground fixed my data collector issue. He thought for a moment and said there must be a ground issue with the motor he needs to repair. He would attempt to repair the ground during the next outage.

While running the same route the next month, I noticed another pump causing the same problem. This pump had not been causing problems before. I told the planner about the pump the same day and also told the electrician. I was told they would inspect both of the motors during the next outage.

The first motor was inspected. Two bolts mounting the motor junction box to the motor were found in the bottom of the box. Two other bolts were found to be extremely loose. The bolts were reinstalled and tightened.

The second motor was inspected. The bolt holding the ground cable was too small for the bolt hole. The nut holding the ground cable was pulled inside the bolt hole to a point where the lug on the ground cable did not touch the housing. The motor was being grounded by the hex points of the nut.

Both of these motors, while operating normally, were improperly grounded. This lack of ground was not causing an immediate problem. However, this deficiency may cause two significant problems.

The most important issue is one of safety. The electrician who inspected the motors said these were traps waiting to catch someone. The environment in the evaporative plant is wet. Water and electricity are a fatal combination. Under the right conditions, someone working in the area could have been electrocuted. The ground is the last resort to divert electricity from passing through a person if a component in the motor short circuits.

The second issue that could have been caused is bearing fluting. This is caused by the rotor arcing across the bearing components from stray electrical fields. Bearings that are fluted may operate for a period but should be considered to be a failed bearing.

At this site, we now have a procedure if the VB7 data collector does not accept key presses correctly. We report the situation immediately to the planner. The planner writes a work request to have an auxiliary ground placed on the motor. This request is expedited as it could represent a major safety issue. The motor ground is then inspected at the next outage.

Conclusion

If a Commtest VBx data collector produces multiple key strokes while taking measurements on a motor, have the ground on the motor checked as soon as possible. This may at least save a piece of equipment and could possibly save a life.

Green is lead analyst for Allied Reliability. She can be reached at 706-871-4687 or at aubrey_green(at)crgl-thirdparty.com.



Top Plant
The Top Plant program honors outstanding manufacturing facilities in North America.
Product of the Year
The Product of the Year program recognizes products newly released in the manufacturing industries.
System Integrator of the Year
Each year, a panel of Control Engineering and Plant Engineering editors and industry expert judges select the System Integrator of the Year Award winners in three categories.
October 2018
Tools vs. sensors, functional safety, compressor rental, an operational network of maintenance and safety
September 2018
2018 Engineering Leaders under 40, Women in Engineering, Six ways to reduce waste in manufacturing, and Four robot implementation challenges.
July/Aug
GAMS preview, 2018 Mid-Year Report, EAM and Safety
October 2018
2018 Product of the Year; Subsurface data methodologies; Digital twins; Well lifecycle data
August 2018
SCADA standardization, capital expenditures, data-driven drilling and execution
June 2018
Machine learning, produced water benefits, programming cavity pumps
Spring 2018
Burners for heat-treating furnaces, CHP, dryers, gas humidification, and more
October 2018
Complex upgrades for system integrators; Process control safety and compliance
September 2018
Effective process analytics; Four reasons why LTE networks are not IIoT ready

Annual Salary Survey

After two years of economic concerns, manufacturing leaders once again have homed in on the single biggest issue facing their operations:

It's the workers—or more specifically, the lack of workers.

The 2017 Plant Engineering Salary Survey looks at not just what plant managers make, but what they think. As they look across their plants today, plant managers say they don’t have the operational depth to take on the new technologies and new challenges of global manufacturing.

Read more: 2017 Salary Survey

The Maintenance and Reliability Coach's blog
Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
One Voice for Manufacturing
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Maintenance and Reliability Professionals Blog
The Society for Maintenance and Reliability Professionals an organization devoted...
Machine Safety
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
Research Analyst Blog
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Marshall on Maintenance
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
Lachance on CMMS
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.
Material Handling
This digital report explains how everything from conveyors and robots to automatic picking systems and digital orders have evolved to keep pace with the speed of change in the supply chain.
Electrical Safety Update
This digital report explains how plant engineers need to take greater care when it comes to electrical safety incidents on the plant floor.
IIoT: Machines, Equipment, & Asset Management
Articles in this digital report highlight technologies that enable Industrial Internet of Things, IIoT-related products and strategies.
Randy Steele
Maintenance Manager; California Oils Corp.
Matthew J. Woo, PE, RCDD, LEED AP BD+C
Associate, Electrical Engineering; Wood Harbinger
Randy Oliver
Control Systems Engineer; Robert Bosch Corp.
Data Centers: Impacts of Climate and Cooling Technology
This course focuses on climate analysis, appropriateness of cooling system selection, and combining cooling systems.
Safety First: Arc Flash 101
This course will help identify and reveal electrical hazards and identify the solutions to implementing and maintaining a safe work environment.
Critical Power: Hospital Electrical Systems
This course explains how maintaining power and communication systems through emergency power-generation systems is critical.
Design of Safe and Reliable Hydraulic Systems for Subsea Applications
This eGuide explains how the operation of hydraulic systems for subsea applications requires the user to consider additional aspects because of the unique conditions that apply to the setting
click me