10 questions for successful shutdown managers

It may be hard to believe, but the success or failure of your shutdown is determined long before you shut down the equipment and begin the event. If we are to have a successful shutdown, we must have clear and repeatable answers to these 10 questions at a minimum.

09/02/2014


It may be hard to believe, but the success or failure of your shutdown (outage,  Courtesy of Allied Reliability Groupturnaround) is determined long before you shut down the equipment and begin the event. While many treat the shutdown as a marathon event that must be survived, the insightful among us know that it is the actions that occur in the t-12 months, t-6 months, t-2 weeks, and even t+2 weeks time frames that really determine the success or failure of our efforts.

Successful shutdown management requires a well-established process that pulls the entire organization together in preparation for the event; working together as a team to meet clearly defined goals and objectives. To reach these goals, each team member must clearly understand:

  • The process we will follow to get there
  • The milestones and deadlines we must meet
  • Their individual contribution – both in activity and decision-making
  • The organizational structure as it applies to the shutdown itself
  • Specifically how we will measure success

I like to test people’s knowledge of this information, informally and on the spot to determine how well they are informed. If they cannot provide clear and accurate answers to these questions, it means that I have not done a good enough job at communicating and that I have much more work to do. If people cannot produce a passable answer off the top of their heads, then they are unlikely to be influenced by the process as they make their day-to-day decisions to prepare for the shutdown.

Building the type of coalition necessary to ensure success represents a social Courtesy of Allied Reliability Groupscience and not a physical science, and as such, there can never be a single formula for success. Each organization must look at what has worked for others and adapt these lessons learned into their own way of thinking, communicating, and interacting towards the common goal.

Here are some questions to ask when establishing your own process that will fit your needs.  If we are to have a successful shutdown, we must have clear and repeatable answers to these questions at a minimum.

10 Questions for Successful Shutdown Managers

  1. How do we measure the success or failure of our future shutdown (budget, time, safety, % work completed)? Are our measures of success clearly understood by everyone affected by the shutdown?
  2. When will we stop allowing new work to be added to our shutdown plan? What is our cutoff date?
  3. How do we ensure that the ideas of all parties are integrated into one single plan that drives the organization forward? How will we communicate this plan to everyone affected by the shutdown?
  4. If an emergency arises after the cutoff data and we absolutely must add work, who will approve this and what is the formal process for justifying this addition?
  5. How do we pick that small handful of jobs that will occur during that shutdown that pose the greatest risk to our success, and how to we prepare ourselves for those factors that are likely to go wrong on these jobs?
  6. When must all of our procurement activities be completed?
  7. How will materials be stored and delivered during the shutdown?
  8. How will we prepare the contractors prior to the start of the shutdown so that they can engage the moment the shutdown begins without delay?
  9. How will we perform a final check just prior to the shutdown, and are there any conditions, should we find ourselves in that situation, that would cause us to wave off or delay the start of our shutdown?
  10. How will we ensure that we measure and communicate our success after the fact, and equally as important, integrate the lessons we learn into our next shutdown preparation?

So I have probably given you more questions than answers in this posting, but in the end, when moving an organization forward, your ability to answer these questions for yourself is more important than blindly following someone else’s path.

Seek to find ways to answer these questions yourself, but more importantly, to make them an integral part of your organization. Use the spot-check method I described above as a test of your efforts to engrain these elements into your way of doing business.

Best of Luck and Mahalo



Top Plant
The Top Plant program honors outstanding manufacturing facilities in North America.
Product of the Year
The Product of the Year program recognizes products newly released in the manufacturing industries.
System Integrator of the Year
Each year, a panel of Control Engineering and Plant Engineering editors and industry expert judges select the System Integrator of the Year Award winners in three categories.
September 2018
2018 Engineering Leaders under 40, Women in Engineering, Six ways to reduce waste in manufacturing, and Four robot implementation challenges.
July/Aug
GAMS preview, 2018 Mid-Year Report, EAM and Safety
June 2018
2018 Lubrication Guide, Motor and maintenance management, Control system migration
August 2018
SCADA standardization, capital expenditures, data-driven drilling and execution
June 2018
Machine learning, produced water benefits, programming cavity pumps
April 2018
ROVs, rigs, and the real time; wellsite valve manifolds; AI on a chip; analytics use for pipelines
Spring 2018
Burners for heat-treating furnaces, CHP, dryers, gas humidification, and more
August 2018
Choosing an automation controller, Lean manufacturing
September 2018
Effective process analytics; Four reasons why LTE networks are not IIoT ready

Annual Salary Survey

After two years of economic concerns, manufacturing leaders once again have homed in on the single biggest issue facing their operations:

It's the workers—or more specifically, the lack of workers.

The 2017 Plant Engineering Salary Survey looks at not just what plant managers make, but what they think. As they look across their plants today, plant managers say they don’t have the operational depth to take on the new technologies and new challenges of global manufacturing.

Read more: 2017 Salary Survey

The Maintenance and Reliability Coach's blog
Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
One Voice for Manufacturing
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Maintenance and Reliability Professionals Blog
The Society for Maintenance and Reliability Professionals an organization devoted...
Machine Safety
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
Research Analyst Blog
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Marshall on Maintenance
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
Lachance on CMMS
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.
Material Handling
This digital report explains how everything from conveyors and robots to automatic picking systems and digital orders have evolved to keep pace with the speed of change in the supply chain.
Electrical Safety Update
This digital report explains how plant engineers need to take greater care when it comes to electrical safety incidents on the plant floor.
IIoT: Machines, Equipment, & Asset Management
Articles in this digital report highlight technologies that enable Industrial Internet of Things, IIoT-related products and strategies.
Randy Steele
Maintenance Manager; California Oils Corp.
Matthew J. Woo, PE, RCDD, LEED AP BD+C
Associate, Electrical Engineering; Wood Harbinger
Randy Oliver
Control Systems Engineer; Robert Bosch Corp.
Data Centers: Impacts of Climate and Cooling Technology
This course focuses on climate analysis, appropriateness of cooling system selection, and combining cooling systems.
Safety First: Arc Flash 101
This course will help identify and reveal electrical hazards and identify the solutions to implementing and maintaining a safe work environment.
Critical Power: Hospital Electrical Systems
This course explains how maintaining power and communication systems through emergency power-generation systems is critical.
Design of Safe and Reliable Hydraulic Systems for Subsea Applications
This eGuide explains how the operation of hydraulic systems for subsea applications requires the user to consider additional aspects because of the unique conditions that apply to the setting
click me