Continue to Site

Solving vibration challenges

A new case study takes a look at ways a strategic partnership solved a problem with bearing stress with new lubrication

By Plant Engineering Staff June 11, 2007

When Strescon Industries of Odenton, Maryland, needed a grease that could hold on, plant superintendent, George D. Butler called the Baltimore branch of Kaman Industrial Technologies for a solution. Sales representatives from both Kaman and Dow Corning Corporation visited the facility to survey the problem. For the solution, click on the case study by clicking here .