Plant Engineering - October 01, 2005
Features
Out with the old
An annual or semiannual plant shutdown gives maintenance staff time to repair equipment, retool for a new production run or even wax and seal the floors. Plant facilities are upgraded or equipment is overhauled during these planned shutdowns. The key word is "planned," especially when it comes to the electrical distribution system.
Automation Engineering Departments
| Maintenance and Management Mechanical Engineering
|