Wireless sensor development session scheduled at ISA

When Dr. Kris Pister of the University of California at Berkley began the Smart Dust project more than a decade ago, few could have predicted its effect on today's industrial automation. The wave of academic research and venture capital investment based on the promise of wireless sensor networks led many to predict an explosion of consumer applications and home automation.

08/15/2008


When Dr. Kris Pister of the University of California at Berkley began the Smart Dust project more than a decade ago, few could have predicted its effect on today's industrial automation. The wave of academic research and venture capital investment based on the promise of wireless sensor networks led many to predict an explosion of consumer applications and home automation.

What has emerged is wireless sensor networking technology that promises to be game-changing for the industrial market. On Tuesday, Oct. 14, Pister will talk about wireless sensor networking milestones in his keynote address titled “From Smart Dust to Smart Plants %%MDASSML%% The Evolution of Wireless Sensor Networking” at ISA EXPO 2008.

Returning is ISA's “One Event %%MDASSML%% Six Exchanges” theme. ISA executive director and CEO Patrick Gouhin said there is something for everyone at ISA EXPO 2008. “We have a full range of in-depth, peer-reviewed technical conference sessions on the most vital topics in our industries. Our technical conference tracks, which include enterprise integration, safety, security, wireless and networking, environmental and quality control and process automation, offer something for everyone,” Gouhin said.

ISA EXPO 2008 will be held Oct. 14-16 at the Reliant Center, Houston, TX. The exhibition hours will be extended to 7 p.m. on Tuesday, Oct. 14. YAPfest returns as well. More information about the event can be found online at www.isa.org/isaexpo2008. Register for ISA EXPO 2008 online or call (919) 549-8411.





No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
The true cost of lubrication: Three keys to consider when evaluating oils; Plant Engineering Lubrication Guide; 11 ways to protect bearing assets; Is lubrication part of your KPIs?
Contract maintenance: 5 ways to keep things humming while keeping an eye on costs; Pneumatic systems; Energy monitoring; The sixth 'S' is safety
Transport your data: Supply chain information critical to operational excellence; High-voltage faults; Portable cooling; Safety automation isn't automatic
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Maintaining low data center PUE; Using eco mode in UPS systems; Commissioning electrical and power systems; Exploring dc power distribution alternatives
Synchronizing industrial Ethernet networks; Selecting protocol conversion gateways; Integrating HMIs with PLCs and PACs
Why manufacturers need to see energy in a different light: Current approaches to energy management yield quick savings, but leave plant managers searching for ways of improving on those early gains.

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.