Why some industrial organizations find benchmarking difficult

Benchmarking, in the simplest terms, involves comparing performance to peers, understanding gaps in operations, and taking steps to close those gaps and improve performance. Unfortunately, it is not as simple as it sounds.

Matthew Littlefield, LNS Research

03/06/2013


The concepts behind benchmarking research for industrial operations have been applied successfully by many leading organization in the world. However, many companies still struggle with the basics. Benchmarking, in the simplest terms, involves comparing performance to peers, understanding gaps in operations, and taking steps to close those gaps and improve performance.

 

 Unfortunately, it is not as simple as it sounds. Below are the top three challenges I’ve seen industrial organizations face while benchmarking operations.

 

 

 

Granularity: Benchmarking research is too general or too specific

 

Often the topic that needs to be benchmarked is too general or too high level, which makes it difficult to take specific steps for improvement. A good example of this is benchmarking “operational excellence.” This means many things to many different companies and it’s difficult to garner real, actionable steps for improvement when companies look to benchmark such a topic.

 

On the other extreme, there’s a similar issue if the business process that needs to be benchmarked is very specific. For any benchmarking process to be successful, it’s critical to understand how the outcome of the process impacts the key goals of the division or plant or even the overall organization. This, in turn, means specific is good, but that can make the quest for data very challenging.

 

A good example of this would be trying to benchmark the throughput and mean time to failure metrics for a very specialized piece of machinery in a specialized industry. All I can say is good luck getting a statistically relevant sample in such a case.

 

 

 

Data: Availability, quality, statistical relevance, and more.

 

The second key challenge with benchmarking industrial operations is data. If all data had the following characteristics, benchmarking projects would almost always run smoothly:

 

  • Easily available
  • In one central location
  • Using common definitions
  • Having a statistically relevant sample size

Unfortunately, this is not the case and it takes a lot of hard work to get there.

 

For example, if you’re planning to benchmark the quality processes of five plants in North America, and there is no consistency in the way data is collected across these plants or how metrics are defined, it will be an uphill battle. In such a case, it becomes very challenging to effectively execute the benchmarking process internally and even harder to do it externally.

 

Getting value from the results

 

The final challenge has two parts and focuses on the way the results of the benchmarking process are utilized. This stage is often more important than the benchmarking process itself.  If what you learn from the results of the benchmarking process isn’t applied to the business, the entire exercise may have been done in futility.

 

The first challenge is in understanding which actions need to be taken based on the results and also how to execute these actions. To accomplish this effectively there needs to be buy-in from all levels of the organization as well as the right culture in place to accept the change due to the new actions.

 

The second part of this challenge lies in answering the question, “What happens next?” Organizations that think about the benchmarking process as a one-time exercise are likely to fail. The key to the success of any benchmarking process is in setting up a culture and process of continuous improvement.

 

The real value of a benchmarking exercise is delivered when you learn from the results of the program, apply those recommendations, track the success of the actions, and continuously improve based on the results of those actions.

 

Matthew Littlefield is principle for LNS Research will be holding the first meeting for the Global Quality Advisory Counci in March. For more informnation, click this link.

 

 

 



Anonymous , 03/15/13 09:16 AM:

Great view on the benchmarking issues that definitely will help to improve the process itself
The Top Plant program honors outstanding manufacturing facilities in North America. The 2012 Top Plant winners have been named.
In 2012, Plant Engineering's Product of the Year program will celebrated its 25th anniversary. Read about the 2012 winners and nominate for 2013.
The Leaders Under 40 program features outstanding young people who are making a difference in manufacturing. View the 2012 Leaders here.
Investment in excellence: One plant's improved productivity and quality was repaid when their company expanded the facility
Strategic uptime, Increased capacity goes right to the bottom line
2013 Forecast Issue: A shift in manufacturing
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Alarm management tips, Power management, Building automation
Estimating data center PUE, Design tips for cost savings, Networked controls, NFPA 70E
Attacking Energy Costs: Strategies for showing financial return on energy management investments

2012 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results


Poll of the Week

What category most helps you select new products?
Recommendation from colleagues
Product of the Year winners
Supplier information
Trade show visit


Click Here for Poll Archives
Sponsored by:

About Us | Contact Us | Advertise | Subscribe to Magazine | Site Map | Privacy Policy
Home | Channels | New Products | Media Library | Connect | Industry News | Events and Awards | Newsletters | Blogs | Magazine
Control Engineering | Plant Engineering | Consulting-Specifying Engineer
All content copyright © 2010-2013 CFE Media. All rights reserved.