Variable refrigerant (VR) systems are a unique solution to a common problem. Every person is comfortable at a different temperature, and VR systems allow each person to control the temperature in his or her environment.


According to John Suzukida's article “ Cooling people, not buildings ” ( Consulting-Specifying Engineer , March 2008), it's more efficient to cool or heat an individual space as needed than to condition all of the space throughout the building all the time. Accordingly, VR systems can save up to 20%; some manufacturers claim that savings can be as much as 30% to 40% over other air conditioning technologies.


Although VR systems were introduced in Japan more than 20 years ago (see “Variable Refrigerant Flow Systems,” by William Goetzler, ASHRAE Journal, April 2007 ), they've been used in the United States for only about five years. So VR systems are not very common—nor very well understood. Though consulting engineers may design VR systems as an HVAC alternative for their clients, building owners just aren't catching on, and many engineers don't have much experience with them.



Figure 1: The two-pipe system, consistent with Mitsubishi Electric HVAC’s design—known as a VR flow (VRF) system—is a heat pump system. Source: Mitsubishi Electric HVAC

System specs

Here's how they work: Using a control system, refrigerant is pumped through pipes to individually sized/configured evaporators in each space, each of which can have its own thermostat. It's a closed-loop system so refrigerant is continuously circulated, unlike a chilled water system, which requires new chilled water to be pumped into the pipes to make up water lost through cooling towers.


Depending on the manufacturer, VR systems are either a two- or three-pipe system (see Figures 1 and 2, respectively). A two-pipe system is a simultaneous system, which allows for simultaneous heating and cooling, according to Nick Conklin, LEED AP, CITY MULTI mechanical engineer with Mitsubishi Electric HVAC , Suwanee, Ga. The Mitsubishi product offers the same components as other systems: outdoor unit, controller, and indoor unit.


Much like a water source heat pump, portions of the system can be manually turned up or down as needed. Whole-building controls can be set to turn on or off at specific times, such as in an office building with set work hours, or can send additional refrigerant to an area of high need, such as a conference room with a lot of people. In-room thermostats allow occupants to control the temperature of their hotel room, office, or retail store.


VR systems are more common in moderate climates—think of them as following the heat pump market. They make more sense in places where heat can be transferred, such as with a ground or geo-exchange loop. They also tend to work better in retrofit projects, said Dominic Tabrizi, PE, vice president of Environmental System Design Inc ., Chicago. Historic buildings may not have enough ceiling space for distribution ductwork, so VR systems may be the way to go.


Piping refrigerant through spaces does not provide for ventilation requirements. Ventilation can be achieved through a variety of options, all of which depend on the geographic location and the building itself. Some engineers opt for rooftop units, energy recovery ventilators, or outdoor air systems; in some cases, operable windows may suffice.


Is it affordable?


Figure 2: This three-pipe system, which is common to Daikin AC’s system, is a heat recovery system. Daikin’s systems traditionally are known as variable refrigerant volume, or VRV, systems. Source: ASHRAE

First-cost for VR systems is higher; however, they have a lower maintenance cost than air-cooled systems, and energy savings will reduce operating costs. In some applications, such as historical building retrofits, they may even provide a lower first-cost option. Also, the system may save on plenum height, saving ceiling space and use a smaller footprint than traditional systems.


The lifecycle of these systems can be up to 20 years, stated Lee Smith, director of product, engineering, and applications with Daikin AC Inc ., Carrollton, Texas. A traditional VAV system lasts 15 years. O&M is pretty standard for maintenance personnel: filters must be changed and coils must be cleaned annually.


Good candidates

Some engineers argue that, because the system must move the refrigerant around in pipes, only smaller buildings (10,000 sq ft or smaller) are candidates for VR systems. Manufacturers argue that the system can handle any size; it's a matter of controls and engineering design.


Some applications just aren't cut out for VR systems. Buildings in very cold climates may not be good candidates. Buildings with a high data processing load, like a data center, also may not be appropriate. If special filtration is required, VR systems are not the best option. Large zones, such as theaters or gyms, also may not be good candidates.


Refrigerants and safety

A major concern for consulting engineers is the piping of refrigerant through occupied zones. Sachin Anand, PE, LEED AP, principal, dbHMS , Chicago, recently looked at using VR systems on two projects, but opted not to use the system on either primarily because of safety concerns.


Safety should not be an issue, however, when ASHRAE Standard 15, Safety Standard for Refrigeration Systems , is applied. ASHRAE 15, in conjunction with the tables in ASHRAE Standard 34, Designation and Safety Classification of Refrigerants , establishes acceptable concentration limits based on room volume for different refrigerant types. The current version of ASHRAE 15 gives a value of 25 lb refrigerant/1,000 cu ft for R-410A. All VR equipment manufacturers use refrigerant R410-A in their equipment, which is an A1 safety group refrigerant, the safest category of refrigerant per ASHRAE Standard 34-2007.




VR system manufacturers



There are two big players in VR systems: Daikin AC Inc. ( ) and Mitsubishi Electric HVAC ( ). Be sure to contact both when working on a building project, as their systems are different.






VR systems: To be, or not to be?



Engineers should ask the following questions when considering a VR system in a building:




• How does the system work?




• What are the building owner's needs?




• Is this a new building or an existing building?




• How many zones are required? Do they all require individual control?




• What will the building restrictions be, such as plenum space, exterior equipment space, mechanical equipment rooms, etc.?




• Are there sound (acoustic) requirements?




• What kind of system maintenance is needed?




• Is a centralized system—tied into the BAS or BMS—required?




• Will electrical sub-metering be required?




•Are there minimum/maximum ambient temperatures? Where (geographically) is this building located?




• What's the priority: energy efficiency, IAQ, or O&M??




• What components—in addition to the controls, pipes, and individual room units—are required?




• How knowledgeable is the system manufacturer? Can it answer all questions, and provide long-term assistance?



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
A cool solution: Collaboration, chemistry leads to foundry coat product development; See the 2015 Product of the Year Finalists
Raising the standard: What's new with NFPA 70E; A global view of manufacturing; Maintenance data; Fit bearings properly
Sister act: Building on their father's legacy, a new generation moves Bales Metal Surface Solutions forward; Meet the 2015 Engineering Leaders Under 40
Cyber security cost-efficient for industrial control systems; Extracting full value from operational data; Managing cyber security risks
Drilling for Big Data: Managing the flow of information; Big data drilldown series: Challenge and opportunity; OT to IT: Creating a circle of improvement; Industry loses best workers, again
Pipeline vulnerabilities? Securing hydrocarbon transit; Predictive analytics hit the mainstream; Dirty pipelines decrease flow, production—pig your line; Ensuring pipeline physical and cyber security
Upgrading secondary control systems; Keeping enclosures conditioned; Diagnostics increase equipment uptime; Mechatronics simplifies machine design
Designing positive-energy buildings; Ensuring power quality; Complying with NFPA 110; Minimizing arc flash hazards
Building high availability into industrial computers; Of key metrics and myth busting; The truth about five common VFD myths

Annual Salary Survey

After almost a decade of uncertainty, the confidence of plant floor managers is soaring. Even with a number of challenges and while implementing new technologies, there is a renewed sense of optimism among plant managers about their business and their future.

The respondents to the 2014 Plant Engineering Salary Survey come from throughout the U.S. and serve a variety of industries, but they are uniform in their optimism about manufacturing. This year’s survey found 79% consider manufacturing a secure career. That’s up from 75% in 2013 and significantly higher than the 63% figure when Plant Engineering first started asking that question a decade ago.

Read more: 2014 Salary Survey: Confidence rises amid the challenges

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.