Tutorial: HART data/diagnostics for legacy instrumentation

New wireless technology helps gather and apply HART information in older systems.

04/17/2008


From time to time we’ve discussed ways you can gather secondary variables and diagnostic information from HART-enabled instrumentation. Now the number of options you have to put this technology to work is getting a whole lot bigger.

As a quick review, HART is a protocol that sends and receives information to instrumentation and devices via a digital signal laid on top of the analog process variable. This information involves secondary process variables and diagnostic functions. To read and use the digital data, you need a device that can decode it. Many, if not most of the analog instruments in your plant probably have HART capability.

Some control systems have HART-enabled I/O capabilities that make this very simple. But if you don’t have that, there are other ways besides walking around with a hand-held communicator.

A number of manufacturers make wired HART interfaces that can be placed in parallel with existing cables to read the secondary variables. ( We discussed this in greater detail in March, 2007 .) There are also multiplexing devices that can gather data from a group of devices on multiple channels (some up to 64 channels) if all the wiring comes to one location. These tend to be slow in that they have to read each device in sequence, so this approach is normally used where data is not time-sensitive.

While these approaches work, the more difficult question can be, what do you do with the data? How do you get it from the monitoring device to the place where you need the information? A legacy control system that has no capability to gather diagnostic data probably has no way to digest it either. That means you are looking at setting up a secondary asset management system that operates in parallel with your control system. Doing this with hard wiring can get complicated and expensive, which may explain why so few people do it.

The new alternative that brings much promise is wireless technology. Consider this possibility: Let’s say you want to implement an asset management system without upgrading your DCS, or you just want to keep a closer eye on some key devices. So you select a group of those instruments within a process unit that are HART-enabled, but from which you are not gathering diagnostic data. A wireless transmitter on each of those devices can send the HART data back to a gateway without disturbing your existing wiring to the operating control system. The main process variable still goes down the wire just as it always has. The wireless gateway gathers up all the diagnostic data in one place, regardless of how the devices are wired. Now that WirelessHART devices are beginning to hit the market, this approach is getting more attention.

Emerson Process Management calls its add-on diagnostics and PV transmitter a “THUM,” and it operates on the wireless network just like another device using that protocol. Airsprite has a similar device coming that can turn any 4-20 mA instrument into a full wireless node or just send the diagnostics.

While WirelessHART is new, it isn’t the only way to approach the situation. There have been wireless systems capable of communicating HART data for some time. For example:

Honeywel Process Solutions has demonstrated transmitters within its OneWireless platform that can mimic wired communication protocols, including HART and fieldbusses. This can work with or without the wired connection.

MacTek has a portable communicator that sends HART data via Bluetooth wireless, and there are others.

The two key benefits of this approach are that you can pick and choose which devices you want to monitor, and all this can take place without any disturbance to your existing networks. Moreover, once a wireless gateway is in operation, you can add new pieces of instrumentation without any wiring at all.

No matter how old your control system is, you can add the benefits of asset management in a way that will minimize costs and operational impact. The question will be if users see wireless as the final push to make them take action and deploy this important money-saving technology.

—Peter Welander, process industries editor, PWelander@cfemedia.com ,
Process Instrumentation & Sensors Monthly
Register here and scroll down to select your choice of free eNewsletters .





No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Leaders Under 40 program features outstanding young people who are making a difference in manufacturing. View the 2013 Leaders here.
The new control room: It's got all the bells and whistles - and alarms, too; Remote maintenance; Specifying VFDs
2014 forecast issue: To serve and to manufacture - Veterans will bring skill and discipline to the plant floor if we can find a way to get them there.
2013 Top Plant: Lincoln Electric Company, Cleveland, Ohio
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Bring focus to PLC programming: 5 things to avoid in putting your system together; Managing the DCS upgrade; PLM upgrade: a step-by-step approach
Balancing the bagging triangle; PID tuning improves process efficiency; Standardizing control room HMIs
Commissioning electrical systems in mission critical facilities; Anticipating the Smart Grid; Mitigating arc flash hazards in medium-voltage switchgear; Comparing generator sizing software

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.