Transformer maintenance saves costs in emergencies

If your insurer demand proof of maintenance, having the right answer can be critical

03/12/2009


Original photo
Businesses that suffer a power transformer failure on their site could face bills running into hundreds of thousands of dollars. Hopefully this unfortunate event will be covered by insurance.

Most insurance companies however will want evidence of a maintenance regime to show that this expensive asset has had care and attention throughout its working life to minimize the risk of failure. If test and maintenance reports are not available there is a risk that the insurance company could seek to minimize its liability.

A new power transformer of the type used in on-site substations can cost from a few thousand dollars to over $1 million so in itself is expensive, and it’s not unusual for the delivery time to be many months. Add the downtime from a failure and the cost of alternative temporary supplies, the total loss suffered by a business, as the result of a transformer failure can, therefore, be enormous.

As a result, it’s no real surprise that insurers are taking care that every aspect of their policy agreement has been satisfied before they pay out on such large claims. And the policy small print invariably puts the onus on the transformer owner to take all practicable steps to keep it in good condition %%MDASSML%% which essentially means regular testing and maintenance.

Many business owners assume that the power transformers on their sites are the responsibility of the utility company that supplies them with power. While this is usually the case, there are many instances where the transformer is the responsibility of the company that owns or rents the site.

“We strongly recommend that any company with a power transformer on site should check whether or not they are responsible for it,” said a loss prevention consultant. “If they are, they should at least consider setting up a regular testing program. Not only will this help to keep their insurers happy, it will also minimize the risk of the major disruption to business that invariably follows a transformer failure.”





No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Leaders Under 40 program features outstanding young people who are making a difference in manufacturing. View the 2013 Leaders here.
The new control room: It's got all the bells and whistles - and alarms, too; Remote maintenance; Specifying VFDs
2014 forecast issue: To serve and to manufacture - Veterans will bring skill and discipline to the plant floor if we can find a way to get them there.
2013 Top Plant: Lincoln Electric Company, Cleveland, Ohio
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Bring focus to PLC programming: 5 things to avoid in putting your system together; Managing the DCS upgrade; PLM upgrade: a step-by-step approach
Balancing the bagging triangle; PID tuning improves process efficiency; Standardizing control room HMIs
Commissioning electrical systems in mission critical facilities; Anticipating the Smart Grid; Mitigating arc flash hazards in medium-voltage switchgear; Comparing generator sizing software

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.