Tips and tricks for commissioning, balancing buildings


CSE: ASHRAE Standard 202P, Commissioning Process for Buildings and Systems, identifies the minimum acceptable commissioning process for buildings and systems as described in ASHRAE’s Guideline 0-2005, The Commissioning Process. How have you applied this standard in a recent project, and what challenges did you overcome? 

Bauers: We are a NEBB-certified firm. As a member of the NEBB BSC Committee, we developed our procedural standards to comply with the ASHRAE guidelines on commissioning. Given that we have taken this approach, we apply the NEBB standard to commissioning. The challenge in the marketplace that we are finding is that our process and the NEBB standard seem to be more rigorous than many of the processes implemented by our competitors. Using a hands-on approach to commissioning, we are substantially more involved—particularly during construction—than many other firms against whom we price our services. 

Szel: Most of our commissioning projects are either for LEED certification or for critical facilities, which have their own specific requirements for commissioning that exceed the ASHRAE standard. With our critical facilities clients, we try to get engaged early in the process so we have input in the commissioning specifications for the vendors and contractors; we often write them entirely. 

Wolff: We have not applied 202P specifically to a project, though the principles contained within it align with our standard delivery. Another way to look at this is that McKinstry Commissioning has, in effect, already been providing 202P services, since our delivery method is already in accordance with this standard. 

York: I personally have not used the ASHRAE Standard 202P for a commissioning project. The standard was recently released by ASHRAE and most owners and CxAs are still learning the standard. The 202P standard does a great job specifying the minimum commissioning services required to ensure the owner extracts the most value from commissioning. The standard is very similar to the USGBC’s BD&C LEED EA Pre-requisite 1 requirements with the addition of submittal review, systems manual, and training, which we have applied on multiple projects. For systems manuals to be of long-term value, you need an engaged owner in the process—a owner that understands how the systems manual can support long-term operations and maintenance as well as potential system limitations as churn occurs.

<< First < Previous 1 2 3 4 5 6 7 Next > Last >>

Gerry , Ontario, Canada, 08/29/13 06:33 AM:

Excellent comments we could not agree more
J.R. , TN, United States, 09/04/13 04:27 PM:

Good comments from some large users of the commissioning process.
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
A cool solution: Collaboration, chemistry leads to foundry coat product development; See the 2015 Product of the Year Finalists
Raising the standard: What's new with NFPA 70E; A global view of manufacturing; Maintenance data; Fit bearings properly
Sister act: Building on their father's legacy, a new generation moves Bales Metal Surface Solutions forward; Meet the 2015 Engineering Leaders Under 40
Cyber security cost-efficient for industrial control systems; Extracting full value from operational data; Managing cyber security risks
Drilling for Big Data: Managing the flow of information; Big data drilldown series: Challenge and opportunity; OT to IT: Creating a circle of improvement; Industry loses best workers, again
Pipeline vulnerabilities? Securing hydrocarbon transit; Predictive analytics hit the mainstream; Dirty pipelines decrease flow, production—pig your line; Ensuring pipeline physical and cyber security
Upgrading secondary control systems; Keeping enclosures conditioned; Diagnostics increase equipment uptime; Mechatronics simplifies machine design
Designing positive-energy buildings; Ensuring power quality; Complying with NFPA 110; Minimizing arc flash hazards
Building high availability into industrial computers; Of key metrics and myth busting; The truth about five common VFD myths

Annual Salary Survey

After almost a decade of uncertainty, the confidence of plant floor managers is soaring. Even with a number of challenges and while implementing new technologies, there is a renewed sense of optimism among plant managers about their business and their future.

The respondents to the 2014 Plant Engineering Salary Survey come from throughout the U.S. and serve a variety of industries, but they are uniform in their optimism about manufacturing. This year’s survey found 79% consider manufacturing a secure career. That’s up from 75% in 2013 and significantly higher than the 63% figure when Plant Engineering first started asking that question a decade ago.

Read more: 2014 Salary Survey: Confidence rises amid the challenges

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.