Building commissioning (Cx) has come into its own in recent years as an accepted aspect of building or retrofitting facilities, fueled by both growing understanding of its benefits and its inclusion as a requirement in the U.S. Green Building Council’s LEED criteria. As a result, Cx providers are spending less time making the case that Cx should be done at all and more time advocating that it be done properly.

Who is providing these services? What types of buildings and systems are being worked on? How much of the work is driven by the LEED rating system? What role does retro-commissioning play?

To find the answers to these and other questions, the AABC Commissioning Group (ACG) conducted a survey of 350 Cx services companies in July 2011. Of the 350 companies surveyed, 150 responded, sharing information on the mix of Cx work they are currently providing, their biggest current challenge, their outlook on 2012, and trends they expect to see in the near future.

All of the companies surveyed are professional firms who are not engaged in any kind of contracting or manufacturing work. The makeup of the firms that responded provides a snapshot of who is providing Cx services in today’s industry.

Commissioning revenue

Figure 1: Specialty or sideline? Nearly a quarter of responding companies cite Cx as their dominant or exclusive business focus, while half indicated that Cx is a relatively small portion of their overall business. Courtesy: AABC Commissioning GroupAs shown in Figure 1, for nearly half of the companies responding, Cx represents 20% or less of their business (including 25% for whom Cx was 5% or less). For approximately 25% of respondents, Cx is 85% or more of their revenue.

There is a significant divide between companies doing Cx as a sideline to engineering and other consulting work and those committed to it as a primary focus of their business. CSE’s 2011 MEP Giants survey shows a similar picture (see Figure 2), especially when taking into account the selection bias in the companies responding to the two surveys.

Figure 2: The percentage breakdown of the MEP Giants’ design revenue that was attributed to Cx or retro-commissioning services. Courtesy: Consulting-Specifying Engineer 2011 MEP Giants

Additional services and subcontract work

More than half (59%) of the companies responding indicated that they also provide design-engineering services, and the survey asked how design and Cx personnel are separated within those companies. Half (50%) indicated that the firm maintains different departments or divisions, 35% said that different teams are established on a per-project basis, and 19% said there was no formal separation.

When asked “What aspects of commissioning do you subcontract?” 55% of the firms said that they do subcontract some aspect of Cx. Of the 55%, the most common service subcontracted was building envelope Cx. Additional responses included testing and balancing, electrical Cx, LEED-enhanced Cx (for companies serving as the design firm on a project), and very large projects.

Delivery of services

There is general agreement among experienced providers that Cx works best when the provider is an independent third party, preferably hired directly by the owner in the earliest stages of a project.

Figure 3: Declaration of independence: With the growing recognition of independence as a fundamental tenet of successful Cx, providers are more frequently being hired as a third party, with no other role on the project. Courtesy: AABC Commissioning GroupAccording to the survey data (Figure 3), 45% of survey respondents are hired as an independent third party, with no other role on the project, 85% or more of the time (this includes 26% that said they are always hired as an independent third party).

Taken together, survey respondents report that approximately two-thirds of the time, they are being hired directly by the building owner or the architect—both of whom represent effective advocacy on behalf of the building owner (see Figure 4). On most of the remaining projects, Cx providers are subcontracted to a general or installing contractor.

Figure 4: Serving the right master: Cx providers are owner advocates first and foremost, and working directly for the owner—or at a minimum for an entity outside of the contractual chain of command, such as the architect—minimizes potential conflicts. Cou

The most discouraging responses concerned the time line during which companies are typically retained to begin providing Cx services—in the predesign, design, or construction phases. On average, respondents are not brought on until the construction phase nearly half (46%) of the time. This is unfortunate, because waiting so long to involve the Cx provider saves comparatively little time and money, but can significantly reduce the benefits of Cx to the owner by sacrificing the upfront reviews and communication that pay dividends later in a project.

Cx and LEED

Three years into a very difficult economy, ACG asked a series of questions to find out what kind of projects are currently driving the Cx industry, beginning with questions related to projects pursuing certification through the USGBC’s LEED program.

It came as no surprise that projects pursuing LEED certification make up a significant portion of the total number of buildings that are commissioned. More than half of responding companies said that LEED projects made up 65% or more of their Cx projects (see Figure 5).

Figure 5: LEEDing the way. The USGBC’s “green building” rating system—which requires at least a minimum scope of Cx as a prerequisite—continues to serve as a key impetus for performing Cx. Courtesy: AABC Commissioning Group

A more interesting set of results is the percentage of those LEED projects that pursue the optional credit for enhanced Cx, which requires an expanded scope and stricter rules on the independence of the Cx provider (see Figure 6).

Figure 6: Credit where it’s due: Among projects done by survey respondents, project teams are choosing to pursue the enhanced Cx credit nearly half the time—suggesting a growing recognition of Cx’s value in improving overall building performance. Courtesy

The survey results reflect a wide range, with the overall average showing that providers pursue credit roughly half the time. Given the belief that the points earned for the credit are somewhat low for the additional effort, this may be an encouraging marker that Cx is valued on LEED projects for more than just meeting expectations and notching points toward a plaque.

Building types, sectors, and Cx scope

Since the U.S. economy came to a screeching halt in 2008, shelving many commercial building projects while the general upward trend in energy prices has continued, there has been a persistent expectation that existing building Cx would increasingly drive the industry. That wave may be growing, but it has not crested yet based on the data. The survey data show new construction still accounting for nearly 80% of the Cx work done by the companies surveyed.

In terms of the types of facilities, commercial office buildings represent the most common building type commissioned, accounting for 26%, followed by higher education (16%), K-12 schools (15%), and healthcare facilities (10%).

The private sector as a whole accounts for 33% of respondents’ Cx work, followed by military projects (23%), state governments (18%), and municipal and federal nonmilitary projects accounting for approximately 10% each.

The scope of Cx can change dramatically depending on which systems are commissioned on any given project. In the past, the HVAC system was frequently the only one commissioned, but that has been changing (see Figure 7).

Figure 7: Systematic increases: Providers are commissioning a wider variety of systems today than in the past. Courtesy: AABC Commissioning Group

Though HVAC remains by far the most common system commissioned—nearly 95% of all projects—others are growing in prominence. Two other systems—domestic hot water and lighting controls—crack the 60% mark, largely because, like HVAC, these systems must be commissioned to satisfy the current version of the LEED Cx requirements. For the variety of other systems in the 10% to 20% range, it will be interesting to see to what degree they grow in subsequent years—such as building envelope, which may become a required element of the LEED 2012 requirements.

Challenges and looking ahead

Survey respondents were asked an open-ended question about their biggest Cx-related challenge in 2011. Five themes emerged:

5: Getting the other members of the Cx team to buy into the process. This primarily took the form of general cooperation and communication, as well as compliance with correcting deficiencies identified by the Cx process.

4: Getting building owners to buy into the Cx process. In particular, a number of respondents noted the difficulty convincing owners to employ Cx on non-LEED projects, or to do more than the bare minimum required by LEED.

3: Scheduling and system readiness. Probably best described as the “herding cats” problem, the most common complaints here were slipping construction schedules, and systems declared ready for functional testing that are not.

2: Finding qualified personnel. Despite high national unemployment levels, Cx companies are generally in need of at least a few good men and women.

1: Price and competition. Unsurprisingly for a field that has seen tremendous growth and many new players entering the field, respondents noted that securing a reasonable fee for an appropriate level of Cx scope and effort is frequently a challenge. Many specifically cited inexperienced companies providing an insufficient level of service as a key pressure on fees.

Despite these challenges, and in the face of a still-sputtering economy, Cx companies are remarkably optimistic about the immediate future. Asked about their expectations for 2012, 69% said they expect their firm’s amount of Cx work to increase, 25% expect it to stay about the same, and only 6% expect a decrease.

Asked about any trends they see on the horizon, the vast majority of responses fell into three categories. Overwhelmingly, Cx providers still expect to see existing building Cx become more popular. A secondary theme was the prediction of increased demand for building envelope Cx. The third trend worth noting concerned LEED, but showed a curious split: Essentially the same number of respondents predicted fewer LEED projects as those who forecasted more. Those predicting decline noted the cost associated with LEED certification and the rise of other systems and state-based requirements.


The strength of the Cx market is clear, but questions remain. Key questions about the future center on how services will be procured and delivered, by whom, and how those answers will affect the value that the process actually delivers to building owners.

Bert is executive director of the AABC Commissioning Group (ACG), a nonprofit association of certified commissioning providers headquartered in Washington, D.C. 

No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
A cool solution: Collaboration, chemistry leads to foundry coat product development; See the 2015 Product of the Year Finalists
Raising the standard: What's new with NFPA 70E; A global view of manufacturing; Maintenance data; Fit bearings properly
Sister act: Building on their father's legacy, a new generation moves Bales Metal Surface Solutions forward; Meet the 2015 Engineering Leaders Under 40
Cyber security cost-efficient for industrial control systems; Extracting full value from operational data; Managing cyber security risks
Drilling for Big Data: Managing the flow of information; Big data drilldown series: Challenge and opportunity; OT to IT: Creating a circle of improvement; Industry loses best workers, again
Pipeline vulnerabilities? Securing hydrocarbon transit; Predictive analytics hit the mainstream; Dirty pipelines decrease flow, production—pig your line; Ensuring pipeline physical and cyber security
Upgrading secondary control systems; Keeping enclosures conditioned; Diagnostics increase equipment uptime; Mechatronics simplifies machine design
Designing positive-energy buildings; Ensuring power quality; Complying with NFPA 110; Minimizing arc flash hazards
Building high availability into industrial computers; Of key metrics and myth busting; The truth about five common VFD myths

Annual Salary Survey

After almost a decade of uncertainty, the confidence of plant floor managers is soaring. Even with a number of challenges and while implementing new technologies, there is a renewed sense of optimism among plant managers about their business and their future.

The respondents to the 2014 Plant Engineering Salary Survey come from throughout the U.S. and serve a variety of industries, but they are uniform in their optimism about manufacturing. This year’s survey found 79% consider manufacturing a secure career. That’s up from 75% in 2013 and significantly higher than the 63% figure when Plant Engineering first started asking that question a decade ago.

Read more: 2014 Salary Survey: Confidence rises amid the challenges

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.