Study shows ASHRAE energy standard almost unreachable in commercial buildings

The National Association of Industrial and Office Properties (NAIOP) released a report outlining the levels of energy efficiency that buildings can reach while remaining economically and logistically feasible.

02/27/2009


The National Association of Industrial and Office Properties (NAIOP) released a report Commercial Real Estate Development Assn. study was commissioned to determine if commercial buildings could achieve the reduction targets of 30 to 50% above the ASHRAE 90.1-2004 standard.

Conducted by ConSol, a California-based independent energy-modeling firm, the study used DOE’s EnergyPlus v2.2 building energy simulation program for modeling the building’s energy issues. The modeling included wall and roof insulations; varying levels of exterior glazing; higher-efficiency window assemblies; reduced air infiltration via the installation of an air barrier; reduced lighting power densities; energy efficient HVAC equipment; and photovoltaic electricity energy generation.

The study used a four-story, 95,000 sq ft, Classoaches. The building's construction costs would exceed a 10-year payback period. Additionally, the study said reaching a 50% reduction above the standard is not currently feasible.

By using the most efficient, current technologies to increase effectiveness, the maximum efficiency reached was 23% in the Chicago model. Overall, energy savings, cost increases and payback periods are:


“The study provides an unbiased insight into the energy targets practical to commercial development today,” said Thomas J. Bisacquino, NAIOP president. “Identifying an energy reduction level that is both environmentally responsible and equitable to the developer is essential in protecting the prosperity of commercial real estate.”

Study results show that employing solar generation technologies could close the gap between the efficiencies achieved in the study and the 30% above the ASHRAE 90.1 -2004 standard. However, at an installed cost of more than $1 million and a payback of up to 100 years, it far exceeds practical and economical limits.





No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Leaders Under 40 program features outstanding young people who are making a difference in manufacturing. View the 2013 Leaders here.
The new control room: It's got all the bells and whistles - and alarms, too; Remote maintenance; Specifying VFDs
2014 forecast issue: To serve and to manufacture - Veterans will bring skill and discipline to the plant floor if we can find a way to get them there.
2013 Top Plant: Lincoln Electric Company, Cleveland, Ohio
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Why manufacturers need to see energy in a different light: Current approaches to energy management yield quick savings, but leave plant managers searching for ways of improving on those early gains.
Electric motor power measurement and analysis: Understand the basics to drive greater efficiency; Selecting the right control chart; Linear position sensors gain acceptance
Protecting standby generators for mission critical facilities; Selecting energy-efficient transformers; Integrating power monitoring systems; Mitigating harmonics in electrical systems

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.