Specifying electrical and power systems for new, existing office buildings

Office buildings might seem like simple structures from the outside, but engineers engaged in such projects know they can be highly complex, with specialized fire/life safety requirements, laboratory spaces, and other unique needs. This looks at the building electrical and power systems.

10/30/2013


J. Patrick Banse, PE, LEED AP, Senior mechanical engineer, Smith Seckman Reid, Houston. Courtesy: Smith Seckman ReidRobert Ioanna, PE, LEED AP, Vice president, Syska Hennessy Group, New York City. Courtesy: Syska Hennessy GroupDouglas Lacy, PE, LEED AP BD+C, Senior associate, ccrd partners, Dallas. Courtesy: ccrd partners

 

Respondents:

 

J. Patrick Banse, PE, LEED AP, Senior mechanical engineer, Smith Seckman Reid, Houston

Robert Ioanna, PE, LEED AP, Vice president, Syska Hennessy Group, New York City

Douglas Lacy, PE, LEED AP BD+C, Senior associate, ccrd partners, Dallas


CSE: What’s the one factor most commonly overlooked in electrical systems in such buildings?

Lacy: The most overlooked item tends not to be technical in nature. Identifying what the requirements for tenant power will be in the final leasing agreements continues to be a challenge. Core and shell design often starts and progresses before the developer, leasing agents, and tenant brokers have finalized the lease language. While engineers can design to codes and standards and can anticipate some abnormalities based on previous engineering experience, there inevitably will be unique requirements requested by tenants in their leasing negotiations. Promoting these discussions to happen early in the design process as to avoid costly change orders is imperative to a successful project and satisfied clients.

Ioanna: A major issue with existing building electrical distribution systems is identifying non-compliant systems. There are a lot of installations grandfathered in place that if evaluated on current codes are noncompliant. When grandfathered equipment is modified, this equipment often needs to be replaced. There could be clearance issues and parts might not be readily available as well. Often increasing construction costs are unanticipated by the owner. 

CSE: Describe a recent project in which you had complex metering and submetering in a building.

Lacy: We recently completed a corporate headquarters and food development complex for a national restaurant conglomerate. The building housed test kitchens and a data center as well as typical office space. The design had to allow for the owner to accomplish asset allocation and tracking for each brand housed within the complex. The system needed to be able to separate costs for similar function of different brands co-located within the same building or even the same room. A series of distributed networkable meters were employed to track power usage. The system selected also had the capabilities to add future meters to the network as they moved, changed, or expanded each department. 

CSE: Describe a power quality issue you encountered, and provide details about how you overcame it.

Ioanna: On a commissioning effort we had a power quality issue with generator-UPS system compatibility. The generators were sized without considering harmonics and leading power factor caused by the UPS filters’ contents and the performance of the UPS. This caused the generator to hunt (up-and-down voltage and frequency). The solution was to lower the UPS recharge current to reduce harmonics when generators are feeding the UPS system and the filters were engaged at relatively higher UPS loading. We have had power quality issues with chiller motor controllers such as variable frequency drives (VFDs). This may cause a zero sequence current activating the upstream breaker with ground fault protection (GFP). The solution is to increase the GFP setpoint (current and time delay) to mitigate this starting/transient condition. 

CSE: What type of backup or standby power systems have you specified into an office building?

Medical offices, in addition to sharing some of the same needs as conventional office buildings, have specialized needs, such as laboratory areas. Photo: Smith Seckman Reid Inc.Lacy: The backup power systems tend to be divided by building class. Low-rise value office buildings tend to use only battery backup for life safety lighting and fire alarm systems, and hydraulic or battery return for elevators. Class B mid-rise and high-rise as well as Class A buildings tend to employ diesel standby generators. In the developer market there tends to be a separation between generators used for “base building” purposes such as life safety functions and those generators used to back up tenant purposes such as IT and call center operations. Also, a portion of most facilities, regardless of class, requires a UPS for the IT equipment rooms.

Ioanna: Traditionally we have supplied standby power with diesel or natural gas-powered generator sets. We also typically provide 90-minute battery backup power for fire alarm system and lighting. The critical building loads are typically run through UPS to mitigate momentary power interruption caused by power transients/abnormality. We have seen an increased request for the use of co-generation, micro-turbine, and fuel cell systems in metropolitan areas. This is due to the availability and low cost of natural gas. These systems sized for partial load or peak shaving load show very attractive levels of return on investment (ROI).



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Leaders Under 40 program features outstanding young people who are making a difference in manufacturing. View the 2013 Leaders here.
The new control room: It's got all the bells and whistles - and alarms, too; Remote maintenance; Specifying VFDs
2014 forecast issue: To serve and to manufacture - Veterans will bring skill and discipline to the plant floor if we can find a way to get them there.
2013 Top Plant: Lincoln Electric Company, Cleveland, Ohio
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Bring focus to PLC programming: 5 things to avoid in putting your system together; Managing the DCS upgrade; PLM upgrade: a step-by-step approach
Balancing the bagging triangle; PID tuning improves process efficiency; Standardizing control room HMIs
Commissioning electrical systems in mission critical facilities; Anticipating the Smart Grid; Mitigating arc flash hazards in medium-voltage switchgear; Comparing generator sizing software

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.