Soft and hard metric conversions

"Soft metric" is not a mix of imperial and metric measurements, and the Dept. of Defense does not recommend it for engineering drawings.

04/08/2014


Courtesy: Consulting-Specifying Engineer.

The United States is the last industrialized country in the world to use the imperial or "inch-pound" system of measurement instead of the metric system, even though Congress adopted the metric system in 1975. Many government agencies that have a presence outside of the United States, such as the Dept. of Defense (DoD), have fully converted to metric, while others, such as the Dept. of Education, have not. This is because there is a need to use metric measurements when outside of the United States due to other countries' use of the metric system, and no real need or sense of urgency to use metric measurements within the United States. As a result, many DoD projects require measurements in both imperial and metric units. This means that engineers have to be careful when using both imperial and metric units in their projects and when converting measurements between the two systems.

Contrary to what some may believe, the use of imperial units followed by metric units is not what is commonly referred to as "soft conversion," nor is soft conversion a mix of the two systems of measurement. According to DoD Publication SD-10 "Guide for Identification and Development of Metric Standards," the mixed use of the two measurement systems is a "hybrid specification," the units of which depend on whether the measurements are converted using a "hard" or "soft" metric conversion.

A "soft conversion" involves changing a measurement from inch-pound units to equivalent metric units within what the DoD calls "acceptable measurement tolerances." This is done to merely convert the imperial measurements to metric without physically changing the item, and it is typically used to specify a requirement. For example, a ½-in. bolt shank diameter would be converted to either 12.7 or 13 mm using soft conversion. Although this is not a standard metric bolt size, it expresses the requirement.

A "hard conversion" involves a change in measurement units that results in a "physical configuration change." Using the bolt example, this would be analogous to changing the diameter of the bolt shank from ½ in. to an M12 (12-mm) or M14 (14-mm) shank diameter. Either one of the two new metric bolt diameters would be outside an "acceptable measurement tolerance" and would require a change in both the bolt and its interface. The new bolt would be considered a "hard metric" item. This is size substitution, which is one method of using hard conversion; the other method is adaptive conversion, where imperial and metric units are reasonably equivalent, but not exact conversions of each other.

When using hybrid measurements, the type of work being specified determines whether to use hard or soft metric conversion. If the requirement is to express measurements in metric units, soft conversion may be used. If the measurements are meant to be used internationally or with metric tools or assemblies, hard conversion will likely be used. If the bolt discussed earlier is part of an assembly that uses imperial units, knowing the metric sizes may be helpful if only metric tools are available. If the bolt is going to be used in a metric-only environment, hard conversion to a metric bolt size should be specified.

It's important to note that for soft conversions, the level of accuracy should be determined and stated in the specifications or on the drawings. Also, it should be communicated to the client that the measurements are not interchangeable. Much like the bolt head example used earlier, the metric equivalent of ½-in. drywall may be less or more thick, which may affect the overall dimensions of the finished product.

This presents obvious issues, which is why the DoD does not recommend the use of dual dimensions on drawings and instead recommends defaulting to metric measurements. If conversions are required, include a single table of conversions in the drawings (depending upon the project, this could easily be an entire 22x34-in. sheet).

Where this is not made clear, exercise your best judgment with management or your client early on in the project. If they don't understand the issues, let them know and prove your worth.

What are your experiences with hybrid measurements?


Michael Heinsdorf, PE, LEED AP, CDT is an Engineering Specification Writer at ARCOMMasterSpec. He has more than 10 years' experience in consulting engineering, and is the lead author of MasterSpec Electrical, Communications, and Electronic Safety and Security guide specifications. He holds a BSEE from Drexel University and is currently pursuing a Masters in Engineering Management, also at Drexel University.



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
The true cost of lubrication: Three keys to consider when evaluating oils; Plant Engineering Lubrication Guide; 11 ways to protect bearing assets; Is lubrication part of your KPIs?
Contract maintenance: 5 ways to keep things humming while keeping an eye on costs; Pneumatic systems; Energy monitoring; The sixth 'S' is safety
Transport your data: Supply chain information critical to operational excellence; High-voltage faults; Portable cooling; Safety automation isn't automatic
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Maintaining low data center PUE; Using eco mode in UPS systems; Commissioning electrical and power systems; Exploring dc power distribution alternatives
Synchronizing industrial Ethernet networks; Selecting protocol conversion gateways; Integrating HMIs with PLCs and PACs
Why manufacturers need to see energy in a different light: Current approaches to energy management yield quick savings, but leave plant managers searching for ways of improving on those early gains.

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.