Simulating daylighting

Glumac implemented daylighting control to achieve energy savings for their Portland headquarters.

10/22/2013


At the Glumac headquarters in Portland, Ore., designers implemented daylighting control to achieve energy savings by lowering lighting energy use typical to the existing office layout. The result: Actual lighting power density (LPD) measured less than 0.3 W/sq ft. By exposing the ceiling and replacing a closed upper/spandrel area with SolarBan 70 XL glazing, daylight penetration into the space increased by an average of 12 ft. With this increased daylight, the risk of glare also increased.

Table 1 shows the total building system effects from lighting modeling and luminaire reduction towards payback analysis. Courtesy: Glumac

However, the existing building has 18-in. deep external columns located 5 ft on center around the entire perimeter, which effectively act as vertical external shades and provide glare control at various times of the day. The surface of the columns is exposed aggregate concrete, with white aggregate and cement. Although the material is light in color, its rough texture casts shadows over much of the surface, which limits the glare potential. To further enhance this lighting benefit, motorized window shades are provided, automatically controlled to raise and lower as needed to eliminate glare in early morning and late afternoon time periods.

The daylighting was simulated using the Radiance plug-in for Autodesk Ecotect. Radiance calculates a single point in time light level in LUX. To calculate the lighting power reduction for the simulation, it was assumed that if the daylight level was greater than 430 LUX, then the lights would be turned off. If the daylight level was less than 430 LUX, the remaining percentage of the light would be supplied by the office lighting. The lighting power reductions due to daylighting were calculated for the affected perimeter and open office spaces at 9 a.m., 12 p.m., and 3 p.m. for the 15th day of each month.

To simulate the effect of daylighting using the Department of Energy’s eQUEST energy modeling program, the baseline hourly lighting schedule for the affected spaces was reduced by the calculated percentage of light available from daylighting as calculated using Radiance. Between the points calculated using Radiance, the available daylight reduction was calculated as a percentage of the two points. Weekday and weekend schedules were created for the east and west sides of the building for the open office and circulation areas. Annual schedules were created that switched the reduced lighting power schedules on a monthly basis. These revised lighting schedules were used in the proposed design simulation.

The baseline model simulation has daylighting allowing the installed lighting levels to be reduced by 50%. As a result, credit has been taken only in the proposed model simulation for the installed system’s ability to reduce lighting levels beyond 50% and turn lights off when sufficient light is available. 


David B. Duthu is board principal at ccrd, where he has more than 37 years of experience in the fields of mechanical engineering design, technical engineering design, and project management. Nolan Rome is associate principal and lead mechanical engineer for ccrd and has been responsible for the design of all types of healthcare facilities including hospital expansions, cancer centers, and imaging centers in multiple states.



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Leaders Under 40 program features outstanding young people who are making a difference in manufacturing. View the 2013 Leaders here.
The new control room: It's got all the bells and whistles - and alarms, too; Remote maintenance; Specifying VFDs
2014 forecast issue: To serve and to manufacture - Veterans will bring skill and discipline to the plant floor if we can find a way to get them there.
2013 Top Plant: Lincoln Electric Company, Cleveland, Ohio
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Bring focus to PLC programming: 5 things to avoid in putting your system together; Managing the DCS upgrade; PLM upgrade: a step-by-step approach
Balancing the bagging triangle; PID tuning improves process efficiency; Standardizing control room HMIs
Commissioning electrical systems in mission critical facilities; Anticipating the Smart Grid; Mitigating arc flash hazards in medium-voltage switchgear; Comparing generator sizing software

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.