September 3 Southland Industries update: Rough testing began, major equipment placed, condenser water system flushed

Rough testing has begun in hospital basement, Level 1; all major equipment has been set in place; the condenser water system is being flushed and passivated in the CUP.

09/03/2013


As of Sept. 3, 2013:

  • Rough testing has begun in the hospital basement, Level 1, and all floors of the North Clinic
  • All major equipment has been set in place throughout the project, air handling units are being connected to the hydronic systems in preparation for temporary air conditioning
  • The condenser water system is being flushed and passivated in the CUP, Chilled water loops are being tested throughout the project in preparation for flushing.

Additional update

  • Southland Industries recently celebrated the safety milestone of going 500+ days without injuries at Ft. Hood.

Figure 1: Bio Safety Lab exhaust stacks (BSL2 + 3). Courtesy: Gary Lovewell, Southland IndustriesFigure 2: Condenser water system being flushed through bypass into the cast in place concrete basin. Courtesy: Gary Lovewell, Southland Industries

Figure 3: Hospital Supply Air Riser in the Level 3 Mechanical Room. Courtesy: Drew Thomas, Southland IndustriesFigure 4: Nicolas Sfeir, Southland Industries Southwest Division Leader, congratulating the Ft. Hood project team during a celebration barbecue. Courtesy: Southland IndustriesFigure 5: The project team celebrating the safety milestone, “500 Injury Free Days for Ft. Hood, Texas.” Courtesy: Southland Industries



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
The true cost of lubrication: Three keys to consider when evaluating oils; Plant Engineering Lubrication Guide; 11 ways to protect bearing assets; Is lubrication part of your KPIs?
Contract maintenance: 5 ways to keep things humming while keeping an eye on costs; Pneumatic systems; Energy monitoring; The sixth 'S' is safety
Transport your data: Supply chain information critical to operational excellence; High-voltage faults; Portable cooling; Safety automation isn't automatic
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Maintaining low data center PUE; Using eco mode in UPS systems; Commissioning electrical and power systems; Exploring dc power distribution alternatives
Synchronizing industrial Ethernet networks; Selecting protocol conversion gateways; Integrating HMIs with PLCs and PACs
Why manufacturers need to see energy in a different light: Current approaches to energy management yield quick savings, but leave plant managers searching for ways of improving on those early gains.

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.