Send in the engineering troops: Electrical and power systems

Military facilities present an army of challenges—exacting codes and regulations, stepped-up security issues, and budgetary concerns. Power and electrical systems are high on the priority list.

07/24/2013


Kevin D. Bomboy, PE, LEED AP, Chief mechanical engineer, STV Group, Douglassville, Pa. Courtesy: STV GroupDavid Callan, PE, CEM, LEED AP, HBDP, Vice president, McGuire Engineers Inc., Chicago. Courtesy: McGuire EngineersRobert L. Crance, Mechanical engineer, Black and Veatch, Overland Park, Kansas. Courtesy: Black and VeatchJoseph H. Talbert, PE, ARM, Project manager, Aon Fire Protection Engineering, Lincolnshire, Ill. Courtesy: Aon Fire Protection EngineeringWilliam Valdez, Northwest justice and civic sector leader/principal, DLR Group, Seattle. Courtesy: DLR Group

Participants:

  • Kevin D. Bomboy, PE, LEED AP, Chief mechanical engineer, STV Group, Douglassville, Pa.
  • David Callan, PE, CEM, LEED AP, HBDP, Vice president, McGuire Engineers Inc., Chicago
  • Robert L. Crance, Mechanical engineer, Black & Veatch, Overland Park, Kansas
  • Joseph H. Talbert, PE, ARM, Project manager, Aon Fire Protection Engineering, Lincolnshire, Ill.
  • William Valdez, Northwest justice and civic sector leader/principal, DLR Group, Seattle

CSE: What’s the one factor most commonly overlooked in electrical systems in military facilities?

Bomboy: The design of the lighting system and lighting controls has become more complex. The UFCs address footcandle levels that are difficult to achieve and still remain within the allowable power densities. Techniques such as vacancy controls, daylighting, task lighting, and efficient fixtures, ballasts, and lamps must be applied to meet all design criteria. 

CSE: Is power reliability more of a concern with military facilities than other structures?

Bomboy: Providing power reliability for military facilities is no different from doing so for the private sector market. The reliability is based on the needs of the user and the functions contained within the building. Although the likelihood of a military project requiring more reliable power may be greater, the techniques to accomplish a high level of reliability are no different. 

CSE: How have sustainability requirements affected how you approach electrical systems?

Bomboy: Sustainable requirements have affected all aspects of lighting design. Additional care must be exercised with the selection, specification, and layout of the lighting fixtures and lighting control system. 

CSE: Have you had experience with photovoltaic (PV), wind turbine, or other renewable energy projects at a military facility? If so, describe it.

Bomboy: Photovoltaic electric and solar hot water has had limited success in our military projects. The photovoltaic systems have had success when there are offsetting incentives from utility companies. To reduce natural gas or electrical demand, solar hot water panels have been used successfully to preheat the water supply to the conventional hot water systems. The hot water generated by the panels is stored in an insulated tank to help meet the high short-time demands for hot water, such as for showers or laundries in barracks. 



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
The true cost of lubrication: Three keys to consider when evaluating oils; Plant Engineering Lubrication Guide; 11 ways to protect bearing assets; Is lubrication part of your KPIs?
Contract maintenance: 5 ways to keep things humming while keeping an eye on costs; Pneumatic systems; Energy monitoring; The sixth 'S' is safety
Transport your data: Supply chain information critical to operational excellence; High-voltage faults; Portable cooling; Safety automation isn't automatic
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Maintaining low data center PUE; Using eco mode in UPS systems; Commissioning electrical and power systems; Exploring dc power distribution alternatives
Synchronizing industrial Ethernet networks; Selecting protocol conversion gateways; Integrating HMIs with PLCs and PACs
Why manufacturers need to see energy in a different light: Current approaches to energy management yield quick savings, but leave plant managers searching for ways of improving on those early gains.

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.