Robotics help manufacturing operations: a robotic cell for the blind
Pre-Tec offers customizable robotics solutions, including a robotic work cell for blind operators.
Lighthouse for the Blind Inc. in Seattle uses a Robotic Finishing cell built by Pre-Tec, a division of Willamette Valley Company. The finishing cell supports production of Lighthouse’s E-Tool or Entrenching tool, a collapsible shovel used by members of the U.S. military as well as Relief Agencies. The components of the E-Tool are manufactured on a variety of equipment including the new robotic cell. By using adaptive technology with audio as well as enhanced visual monitors, Lighthouse helps blind operators to safely operate the robotic cell. Pre-Tec said the E-Tool program has created more than 15 jobs for a community of people with a 70% unemployment rate.
Pre-Tec offers http://www.pre-tec.comautomated solutions for accurate and efficient production, including products and services, with ability to custom-design advanced robotic systems and manufacturing cells for products ranging from micro circuit boards to trenching tools for the military.
Products and systems provide manufacturing and assembly techniques that meet and exceed goals for speed, accuracy, flexibility, and optimal throughput in all types of manufacturing and assembly environments. Projects include multi-axis robot arms, custom built end-of-arm tooling, conveyance systems and others.
Custom Robotics
PRE-TEC designs and builds turn-key solutions using multi-axis robot arms, custom end-of-arm tooling, conveyance systems, and safety hardware incorporating:
- Multi-axis Configurations
- Programmable Force Control Applications
- End-of-Arm Tooling and Fixturing
- ANSI- and OSHA-Compliant Safety Enclosures utilizing State-of-the-Art Sensor Technologies
- Project Documentation
- PC-Based Software
- Process / Product Tracking
- Training and Start-up Assistance
- Maintenance and Service Programs
Pre-engineered Cells
PRE-TEC has developed pre-engineered cells for various manufacturing and finishing processes, including:
- Welding Cells
- Material Finishing Cells for grinding, polishing or sanding
- Machine Tending Cells
Rufus Burton, Sales Manager for PRE-TEC, said a recently redesigned site incorporates a "Rapid Response mechanism so that visitors can pose a specific, detailed question and receive, within 24 hours and via phone, fax, or e-mail, a personal response from an engineer trained specifically in the appropriate discipline. Our Rapid Response Team is representative of our ability and commitment to responding to customers’ needs as quickly as is needed.”
Pre-Tec
- Edited by Gust Gianos and Mark T. Hoske, Control Engineering, www.controleng.com
Case Study Database
Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.
These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.
Click here to visit the Case Study Database and upload your case study.
2012 Salary Survey
In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.
Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.