Redundancy powers Texas hospital

Doctors Hospital at Renaissance (DHR) in Edinburg, Texas, is a 90-acre medical complex with an east and west campus that includes seven different medical centers, three central cooling plants, and a 506-bed, full-service facility with a medical staff of more than 500 physicians.

01/20/2010


Doctors Hospital at Renaissance (DHR) in Edinburg, Texas, is a 90-acre medical complex with an east and west campus that includes seven different medical centers, three central cooling plants, and a 506-bed, full-service facility with a medical staff of more than 500 physicians. The hospital encompasses more than 1 million sq ft of space.

 

For the first 10 years of operation, the hospital's planning team relied on the traditional solution for backup power generators. As the hospital expanded, the facility managers consulted with the MEP engineering firm GPM Engineering , Corpus Christi, Texas. In 2003, GPM was visited by Generac Industrial Power , Waukesha, Wis. The team came to introduce GPM to Generac's Modular Power System (MPS).

 

The Generac MPS combines the output of multiple generators without the need for space-consuming paralleling switchgear that is typical of traditional paralleled systems. Redundancy and expandability are built into the system since each genset features onboard paralleling capabilities, which allows the unit to achieve N + 1 or greater coverage simply by adding modular generators of the appropriate size.

 

In 2008, a 200,000-sq-ft, 105-bed Women's Hospital at Renaissance was added to the east campus. During construction of the new Women's Hospital in 2007, Generac introduced the Bi-Fuel generator, combining diesel fuel (30%) with natural gas (70%) in configurations of 600 to 9,000 kW of power. With the MPS Bi-Fuel option, the hospital extended its single-engine run time by about six times that of straight diesel.

 

As space outside the Women's Hospital was limited, the team recommended that DHR invest in the Generac Twin Pack genset. An option of the MPS, the Twin Pack consolidates two 500-kW engines operating within a single, weather-resistant, sound-attenuated enclosure. The result is 1,000 kW of power in a confined space. John Rustick, DHR's associate administrator and director of engineering, ordered 12 Bi-Fuel generators, two sets of 3 x 750 kW Gemini Bi-Fuel gensets, and 4,500 kW of backup power for the new Women's Hospital and adjacent central cooling plant.

 

The hospital's backup power system was put to the test in 2008 when Hurricane Dolly rushed ashore with wind gusts higher the 100 mph and rainfall of more than 16 in. The Category 1 storm caused more than 212,000 people to be without power in the Rio Grande Valley. “The Generac engines whirled into action instantly and kept us operating for 14 hours before we got power restored. Not a single venue on campus was without power,” Rustick said.

 

Sixty days later, a main switching gear blew up on the main power supply line to the Women's Hospital from DHR's electric utility. Due to Generac's modular platform, the units ran continuously for 13 straight days. The smaller, modular units allowed the engine to go off-line occasionally for rest and maintenance without sacrificing any power needs.

 

DHR engineers requested that their older, single engine units be replaced by MPS systems. Today, out of a total of 25 engines on the two campuses, only two 2 MW large engines still remain.

 

Information provided by Generac

 

 

 

 

 

AT A GLANCE

 

 

The Doctors Hospital at Renaissance (DHR) is a 90-acre medical complex comprised of more than 1 million sq ft of space. The 2008 addition of the Women's Hospital at Renaissance included a 200,000-sq-ft, 105-bed facility in the east campus.

 

 

 

The facility managers selected Generac Bi-Fuel generator, which combines diesel fuel (30%) with natural gas (70%) in configurations of 600 and 9,000 kW of power. The MPS Bi-Fuel option selected by the DHR staff included:

 

 

 

  • Two 500-kW engines operating within a single enclosure

  • 12 Bi-Fuel generators

  • Two sets of 3 x 750 kW Gemini Bi-Fuel gensets

  • 4,500 kW of backup power.



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. The 2012 Top Plant winners have been named.
In 2012, Plant Engineering's Product of the Year program will celebrated its 25th anniversary. Read about the 2012 winners and nominate for 2013.
The Leaders Under 40 program features outstanding young people who are making a difference in manufacturing. View the 2012 Leaders here.
Investment in excellence: One plant's improved productivity and quality was repaid when their company expanded the facility
Strategic uptime, Increased capacity goes right to the bottom line
2013 Forecast Issue: A shift in manufacturing
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Alarm management tips, Power management, Building automation
Estimating data center PUE, Design tips for cost savings, Networked controls, NFPA 70E
Attacking Energy Costs: Strategies for showing financial return on energy management investments

2012 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results


Poll of the Week

What category most helps you select new products?
Recommendation from colleagues
Product of the Year winners
Supplier information
Trade show visit


Click Here for Poll Archives
Sponsored by:

About Us | Contact Us | Advertise | Subscribe to Magazine | Site Map | Privacy Policy
Home | Channels | New Products | Media Library | Connect | Industry News | Events and Awards | Newsletters | Blogs | Magazine
Control Engineering | Plant Engineering | Consulting-Specifying Engineer
All content copyright © 2010-2013 CFE Media. All rights reserved.