Recycling Robots

An engine plant discovers how easy it is to recycle and repurpose existing robots when manufacturing demands change. See table, photo.

09/16/2010


When it comes to getting the most bang for the buck, especially over the long haul, robots win hands-down over hard automation. Just ask the engineers and operators at the Navistar’s engine plants. The plants produce six- and eight-cylinder medium-duty Diesel engines. Although sections of Navistar’s factories became automated over the years, robotic automation wasn’t a part of the picture until the first robot was installed in the late 1980s. 

The company got more serious about robotic automation in 1994, when production demand at the Indianapolis engine plant blew through the 580 engines-per-day limit the production equipment was designed to handle. An evaluation of both cycle times and equipment uptime figures showed the hard automation on the lines was holding up production. By replacing the dedicated cells with robots and improving the bottleneck machines, production numbers more than doubled. In those efforts, the plants have installed approximately 200 ABB robots for material handling, machine tending, adhesive dispensing, deburring, gauging, assembly, painting, and automatic storage and retrieval.

More noteworthy than the robots’ speed and reliability is the fact that many of the individual units have been redeployed at least once. Federally mandated reductions in the allowable emissions from Diesel engines have dramatically reduced the number of years a particular engine model is produced. Consequently, most of the robots currently running production are on their second or third engine program. This is a huge competitive advantage over other manufacturers that use hard automation.

Moving to a new plant

In July, 2009, the Indianapolis engine facility was shut down due to the economic downturn with a dip in demand for Diesel pickup trucks. The remaining V8 production was picked up by the Huntsville engine plant. Many of the robots were shipped from Indianapolis to other Navistar facilities for redeployment.

The robot's original deployment.One of the most significant examples of redeployment involves two ABB IRB 1400 robots, originally implemented on the 7.3 L connecting rod line. These robots were purchased to load and unload a rod assembly machine. The load robot picked up a rod from one conveyor and a cap from another and placed the parts into the assembly machine. The unload robot removed the assembled rod and placed it onto an outgoing conveyor. The cycle time was 7.5 seconds.

The robots were ordered from system integrator CIM Systems in 1997. The original purchase price for the robots, including end-of-arm tooling, programming, and integration, was $66,300 each. The units continued to service the rod assembly machine until a new connecting rod line was installed in July 1999. When removed from service, they had each logged production time of 26,250 hours which means they cost about $2.50 per hour to run. The robots were then removed from the plant and returned to CIM for redeployment.

Teaching old robots new tricks

Working after the first re-tooling.After removal, the units were returned to CIM where they were re-tooled with adhesive-dispensing heads and re-deployed to replace CNC-based RTV-dispensing equipment on the assembly line. At the time, the plant was using a portable dispensing robot as a backup to three of the CNC machines. The portable robot would be moved via fork truck and used while the primary machine was being repaired. When the rod-line robots became available, the decision was made to use them to replace the CNC equipment.

Since CIM had already designed the adhesive-dispensing tooling for the portable robot, redeployment of the rod-line robots was done over a weekend. The CNC equipment was removed and the robots were placed on the existing bases. Costs for redeployment, including tooling, programming, and integration, were $7,800 each.

The robots continued to service the assembly line until a new line was installed in 2003. The robots were again removed from the plant and returned to CIM for redeployment. By that point, each had now run production for 47,350 hours. Based upon the initial purchase and redeployment costs, spread over the number of production hours, the robots cost approximately $1.60 per hour to run.

Their third assignment.Soon after receiving the robots, CIM began to re-tool them with deburring spindles. The Huntsville plant was having an issue with excessive burrs on the new 6.0 L engine block line, so CIM and Navistar engineers decided to use the robots to deburr the block and bed-plate. The new tooling utilized 40,000 RPM spindles, carbide burr bits, and an automatic tool changer.

The veteran robots were installed on the Huntsville block line in July 2003. The only item that was replaced was the SMB battery in the base of the manipulator. The cost for redeployment, including spindles, tool changers, perimeter fencing, programming, and integration, was $61,330 each.

The robots were later re-programmed for the 6.4 L engine, and continue to service the block line. Each robot has now run production for 72,200 hours, which is equivalent to 35 years at 40 hours a week. Based upon the initial and redeployment costs and the number of production hours run, the robots cost approximately $1.88 per hour to run.

 

Cost calculations per robot

Cost

Hours run

Cost/hour

Initial investment

  $66,300

    26,250

     $2.50

First redeployment

    $7,800

    21,100

     $0.37

Second redeployment

  $61,330

    24,850

     $2.47

Total investment

$135,430

    72,200

Avg=$1.88

The only part failure for the robots occurred in 2004 when a base cable on one of the robots was replaced at a cost of $1,875. The estimated cost of power and air for the robot over the 72,200 hours is $21,660 each. This makes the total investment for the pair of robots $316,055, including parts and utilities, or $2.19 per hour. Assuming an average cost of $30.00 per hour for operators, it would have cost $4,332,000 in labor for the same number of production hours.

These two very experienced robots are still running production in the Huntsville engine plant.  They were recently reprogrammed to handle a third engine style and reached 100,000 hours of service in early in 2010.

Ensuring long-term success like this requires trying to anticipate future uses for a given robot. This might include specifying a larger payload capacity or reach than the initial project may require, but such thinking improves the potential for redeployment. While many automation projects these days have a fairly short life cycle, the fact that robots can move on to another assignment makes them a better value in the long run.

Dave Fox is President of CIM Systems Inc., the full-service robotic integration company he founded in 1989. CIM Systems provides innovative, common-sense solutions for a wide variety of flexible automation applications throughout North America. Visit www.cimrobotics.com.



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Leaders Under 40 program features outstanding young people who are making a difference in manufacturing. View the 2013 Leaders here.
The new control room: It's got all the bells and whistles - and alarms, too; Remote maintenance; Specifying VFDs
2014 forecast issue: To serve and to manufacture - Veterans will bring skill and discipline to the plant floor if we can find a way to get them there.
2013 Top Plant: Lincoln Electric Company, Cleveland, Ohio
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Bring focus to PLC programming: 5 things to avoid in putting your system together; Managing the DCS upgrade; PLM upgrade: a step-by-step approach
Balancing the bagging triangle; PID tuning improves process efficiency; Standardizing control room HMIs
Commissioning electrical systems in mission critical facilities; Anticipating the Smart Grid; Mitigating arc flash hazards in medium-voltage switchgear; Comparing generator sizing software

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.