Putting people in the path of safety

Your safety systems should not depend on the ability of individuals to react in an emergency.

09/09/2011


Dear Control Engineering–In the article When should you bypass your safety system, the author makes the following statement:

“Human factors are recognized as severe limitations to the dependability of risk-reduction factors. A layer of protection must be dependable and auditable. Neither of these characteristics would seem to apply to a bypass situation. During process transitions, variables are changing rapidly and protection thresholds are also subject to change. It is not the time to depend on a less reliable protection layer.”

Could you expand on that? Can’t human factors be audited?

 

The author is trying to make the point that a plant should not depend on people to carry out safety-related functions. For example, your safety procedures probably shouldn’t include something like, “When the horn sounds, the operator must close valve RE1196 within 30 seconds to prevent the release of cyanide gas.”

Maybe that's an extreme example, but think about it. Such a procedure makes some critical assumptions about the operators:

1. They know where valve RE1196 is and which way to turn the handle to close it.

2. They are all physically strong enough to close it and any necessary wrenches, gloves, etc. are available and they know where they are.

3. They know what they are supposed to do when the horn sounds, and can correctly identify the specific sound, and can hear well enough to realize the horn is sounding from anywhere they may be when on duty.

4. Only operators that have been sufficiently trained on this procedure will be on duty at any time when there is any possibility of an emergency happening.

5. They will have the presence of mind to act correctly when under pressure and not panic.

If you are auditing the safety procedures and you see something like this, you can work with some of the points. People and their knowledge of procedures get audited all the time for all sorts of things. You can ask operators to show you that specific valve and indicate which way to turn it in an emergency. You can test physical strength with a similar task. You can ask operators to describe what is supposed to happen in an emergency. You can ask operators to identify the relevant horn sound. If all the operators pass these tests, what’s wrong with the procedure?

You can’t really tell if someone can stay clear headed and not panic in an emergency. You can’t be absolutely certain that the operator won’t be in the restroom when the horn goes off. You can’t test to see if someone will recall the instructions in the chaos of an emergency. You can’t be positive that a supervisor won’t put an untrained operator on duty in a pinch. There is no effective way to audit these elements, which is why safety experts don’t want to include them in procedures. People are simply too unreliable so they flunk the dependability test. I wouldn’t want to live downwind of that plant.

--Peter Welander, pwelander(at)cfemedia.com



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Leaders Under 40 program features outstanding young people who are making a difference in manufacturing. View the 2013 Leaders here.
The new control room: It's got all the bells and whistles - and alarms, too; Remote maintenance; Specifying VFDs
2014 forecast issue: To serve and to manufacture - Veterans will bring skill and discipline to the plant floor if we can find a way to get them there.
2013 Top Plant: Lincoln Electric Company, Cleveland, Ohio
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Bring focus to PLC programming: 5 things to avoid in putting your system together; Managing the DCS upgrade; PLM upgrade: a step-by-step approach
Balancing the bagging triangle; PID tuning improves process efficiency; Standardizing control room HMIs
Commissioning electrical systems in mission critical facilities; Anticipating the Smart Grid; Mitigating arc flash hazards in medium-voltage switchgear; Comparing generator sizing software

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.