Project name: Learning Center Expansion

Project type: Addition to an existing building

Engineering Firm: exp

Building type: Office building; customer education center

Location: Verona, Wis.

Timeline: August 2010 – September 2011


Break room exterior. Courtesy: expBuilding details

This project was an addition to an existing customer training facility and employee office building.  The project included 2 floors of meeting rooms above a single floor of housing over 230 private offices.  Total project size was approximately 198,000 sq ft. Each private office received individual heating/cooling controls, occupancy sensors for lighting and variable air volume (VAV) operation reduction, and window monitors on all perimeter offices to disable mechanical supply to those rooms.  Fully integrated audio-visual (AV) controls were included in the training rooms to allow for interconnection of all lighting, projector operation, window shades and sky-fold room partitions.  Concourse lighting included fixtures designed by the lighting engineer to reflect and compliment concourse lighting in the existing portions of the building.

Project details

As the engineer of record on both this project, and the existing building, the engineering team was very familiar with the existing systems which allowed them to be instrumental in major revisions to the mechanical, electrical, and plumbing (MEP) systems. This included the following:

Electrical System: Two existing pad mounted transformers were in the way of the building expansion.  An existing 1250 kW building generator was also going to be encompassed in the center of the building with the new expansion.  Therefore, phased revision occurred by first locating a medium-voltage generator remotely on the site, and transferring down to 480 V within the building, allowing the generator to be removed while keeping the building fully backed up. The space made available from the removal of the generator allowed a dual transformer unit substation to be added as a replacement for the pad mounted transformers. This allowed the necessary space to be used for the building's construction. 

Meeting Level Concourse. Specialty fixtures were designed specifically for the expansion project. Courtesy: expMechanical: Four existing boilers providing hot water for perimeter radiation were removed and replaced as part of this project with high temperature multi-stack water-to-water heat pumps. Two 80,000 cfm Haakon custom rooftop units with economizers provide HVAC supply to the project. Three 200 hp geothermal pumps provided the means for connecting the building heating/cooling system to the vertical bore, closed loop, geothermal system. 

Plumbing: Relocated the domestic water supply due to the new building location with minimal downtime to keep building operational as close to 100% as possible.  Tied in emergency back up to the mechanical system in case of geothermal system failure. 

Fire Protection: Fully protected building. 

Lighting: High use of LED fixtures with a fully automated lighting control and dimming system.



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2015 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
Prescriptive maintenance; Hannover Messe 2017 recap; Reduce welding errors
Safety standards and electrical test instruments; Product of the Year winners; Easy and safe electrical design
Safer human-robot collaboration; 2017 Maintenance Survey; Digital Training; Converting your lighting system
Mobility as the means to offshore innovation; Preventing another Deepwater Horizon; ROVs as subsea robots; SCADA and the radio spectrum
Future of oil and gas projects; Reservoir models; The importance of SCADA to oil and gas
Big Data and bigger solutions; Tablet technologies; SCADA developments
Automation modernization; Predictive analytics enable open connectivity; System integration success; Automation turns home brewer into brew house
Commissioning electrical systems; Designing emergency and standby generator systems; Paralleling switchgear generator systems
Natural gas for tomorrow's fleets; Colleges and universities moving to CHP; Power and steam and frozen foods

Annual Salary Survey

Before the calendar turned, 2016 already had the makings of a pivotal year for manufacturing, and for the world.

There were the big events for the year, including the United States as Partner Country at Hannover Messe in April and the 2016 International Manufacturing Technology Show in Chicago in September. There's also the matter of the U.S. presidential elections in November, which promise to shape policy in manufacturing for years to come.

But the year started with global economic turmoil, as a slowdown in Chinese manufacturing triggered a worldwide stock hiccup that sent values plummeting. The continued plunge in world oil prices has resulted in a slowdown in exploration and, by extension, the manufacture of exploration equipment.

Read more: 2015 Salary Survey

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.
Featured articles highlight technologies that enable the Industrial Internet of Things, IIoT-related products and strategies to get data more easily to the user.
Compressed air plays a vital role in most manufacturing plants, and availability of compressed air is crucial to a wide variety of operations.
This digital report will explore several aspects of how IIoT will transform manufacturing in the coming years.
Maintenance Manager; California Oils Corp.
Associate, Electrical Engineering; Wood Harbinger
Control Systems Engineer; Robert Bosch Corp.
This course focuses on climate analysis, appropriateness of cooling system selection, and combining cooling systems.
This course will help identify and reveal electrical hazards and identify the solutions to implementing and maintaining a safe work environment.
This course explains how maintaining power and communication systems through emergency power-generation systems is critical.
click me