Predictive, preventive, and breakdown maintenance tips

Predictive, preventive, and breakdown maintenance are common maintenance programs that provide their own unique benefits and plant managers should know when to employ them.

04/18/2017


Image courtesy: Bob Vavra, CFE MediaAn established maintenance program helps save money, energy and time. That said, there are many different maintenance program options to choose. The most common are preventive, predictive, and breakdown. What is the difference between these maintenance programs?

Predictive maintenance

There is often enough data to establish a predictive maintenance (PdM) program. PdM is not a type of program that determines if something has gone wrong. Rather, it prevents something from going wrong. A PdM program looks at the expected, or average, the life of the equipment and related statistics. The program determines when a problem is most likely to occur, either with the equipment or with a component within the equipment. In this way, the maintenance takes place before the problem occurs. One of the primary benefits of a predictive maintenance program is it limits downtime. It may be necessary to take the equipment offline to perform the maintenance. But since it is being done ahead of a failure, it allows the user to pick and choose the times when the maintenance occurs.

Preventive maintenance

A preventive maintenance program looks for triggers that identify when a problem is likely to occur. It relies on testing, both online and offline, of any equipment that falls under the program. Preventive maintenance discovers any issues before a catastrophic failure. Preventive maintenance involves routine equipment testing and maintenance when identifying a problem. Applying an effective preventative maintenance program saves money by replacing or rebuilding a failing part.

Breakdown maintenance

Breakdown maintenance is perhaps the least desirable of the three different types of maintenance programs. This type of maintenance involves repairing or rebuilding the equipment, just as the other maintenance programs. The trigger event, though, is the actual breakdown of the equipment. Breakdown maintenance can be beneficial if it's used with preventive and predictive maintenance. It may still be necessary, at times, to use breakdown maintenance as a program when unexpected events take place. If it is the only type of maintenance in place, yet, it tends to be the most costly option.

David Manney is a marketing administrator at L&S Electric. This article originally appeared on L&S Electric Watts New BlogL&S Electric is a CFE Media content partner.



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2015 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
Safer human-robot collaboration; 2017 Maintenance Survey; Digital Training; Converting your lighting system
IIoT grows up; Six ways to lower IIoT costs; Six mobile safety strategies; 2017 Salary Survey
2016 Top Plant; 2016 Best Practices on manufacturing progress, efficiency, safety
Mobility as the means to offshore innovation; Preventing another Deepwater Horizon; ROVs as subsea robots; SCADA and the radio spectrum
Future of oil and gas projects; Reservoir models; The importance of SCADA to oil and gas
Big Data and bigger solutions; Tablet technologies; SCADA developments
Automation modernization; Predictive analytics enable open connectivity; System integration success; Automation turns home brewer into brew house
Commissioning electrical systems; Designing emergency and standby generator systems; Paralleling switchgear generator systems
Natural gas for tomorrow's fleets; Colleges and universities moving to CHP; Power and steam and frozen foods

Annual Salary Survey

Before the calendar turned, 2016 already had the makings of a pivotal year for manufacturing, and for the world.

There were the big events for the year, including the United States as Partner Country at Hannover Messe in April and the 2016 International Manufacturing Technology Show in Chicago in September. There's also the matter of the U.S. presidential elections in November, which promise to shape policy in manufacturing for years to come.

But the year started with global economic turmoil, as a slowdown in Chinese manufacturing triggered a worldwide stock hiccup that sent values plummeting. The continued plunge in world oil prices has resulted in a slowdown in exploration and, by extension, the manufacture of exploration equipment.

Read more: 2015 Salary Survey

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.
This digital report will explore several aspects of how IIoT will transform manufacturing in the coming years.
Motion control advances and solutions can help with machine control, automated control on assembly lines, integration of robotics and automation, and machine safety.
Compressed air plays a vital role in most manufacturing plants, and availability of compressed air is crucial to a wide variety of operations.
Maintenance Manager; California Oils Corp.
Associate, Electrical Engineering; Wood Harbinger
Control Systems Engineer; Robert Bosch Corp.
click me