Preassembled UPS system
The BladeUPS system from Eaton Corp. is now available in a preassembled system cabinet.
Eaton Corp.’s BladeUPS system is now available in a preassembled system cabinet. The BladeUPS Top-Entry Preassembled System simplifies installation for applications without a raised floor environment. Its modular design makes it a flexible option when facing data center moves, additions, or changes. The system is designed for data center managers interested in consolidating stand-alone UPS systems to ease UPS management and enhance power capacity planning.
Case Study Database
Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.
These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.
Click here to visit the Case Study Database and upload your case study.
2012 Salary Survey
In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.
Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.












