SEARCH Archives
Loading
Sponsored by:

Power monitoring and metering module

Eaton's new PM3 module is designed to monitor the power of branch and main circuit applications to help system reliability and reduce utility costs.

09/29/2011


Eaton is expanding its circuit protection products with the PM3 power monitoring and metering module, which monitors the power of branch and main circuit applications. The PM3 is a device that measures current and voltage, calculates power and energy usage, and provides breaker status. It is designed for Eaton Series G L-Frame and Series C K-Frame molded-case circuit breakers. Engineered for original equipment manufacturers (OEMs), the PM3 module is applied where monitoring is important. 

“The PM3 module is designed to improve electrical system reliability and efficiency, by helping to reduce utility costs and increase equipment performance,” said Shawn Diamond, product manager at Eaton. “It enables real-time monitoring, metering and communication of phase current and voltage, with real and reactive calculated power and energy – making it easier for customers to detect potential power concerns.”

An Underwriters Laboratories (UL) listed, add-on communications device, the PM3 module can be mounted to the load side of three-pole Series G LG and Series C KD breaker frames and monitors electrical system parameters, Eaton said. Regardless of whether the trip unit is thermal-magnetic or electronic, the PM3 can be adapted to applications where monitoring is critical. It can also be installed in reverse-feed applications with reverse-fed breakers. Measurement accuracy is within two percent of the reading.

The PM3 power monitoring and metering module communicates through INCOMTM protocol, and is compatible with Eaton Power Xpert Gateway (PXG) for web page and Ethernet capability. Versatile, it communicates to the web or Modbus TCP/IP through any of the Eaton PXG gateways.

Available in two versions, the 480 volt (V) PM3 module operates in 208 V to 48 0V applications, and includes an integral power supply. The 600 V model operates 208 V to 600 V applications and requires 24 V direct current auxiliary power, the company said.

www.eaton.com 

- Edited by Chris Vavra, Control Engineering, www.controleng.com



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. The 2012 Top Plant winners have been named.
In 2012, Plant Engineering's Product of the Year program will celebrated its 25th anniversary. Read about the 2012 winners and nominate for 2013.
The Leaders Under 40 program features outstanding young people who are making a difference in manufacturing. View the 2012 Leaders here.
Investment in excellence: One plant's improved productivity and quality was repaid when their company expanded the facility
Strategic uptime, Increased capacity goes right to the bottom line
2013 Forecast Issue: A shift in manufacturing
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Alarm management tips, Power management, Building automation
Estimating data center PUE, Design tips for cost savings, Networked controls, NFPA 70E
Attacking Energy Costs: Strategies for showing financial return on energy management investments

2012 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results


Poll of the Week

What category most helps you select new products?
Recommendation from colleagues
Product of the Year winners
Supplier information
Trade show visit


Click Here for Poll Archives
Sponsored by:

About Us | Contact Us | Advertise | Subscribe to Magazine | Site Map | Privacy Policy
Home | Channels | New Products | Media Library | Connect | Industry News | Events and Awards | Newsletters | Blogs | Magazine
Control Engineering | Plant Engineering | Consulting-Specifying Engineer
All content copyright © 2010-2013 CFE Media. All rights reserved.