Plant design and operation

Simulation software enables plant designers to view design scenarios in a virtual world without the expense, time delay and risk of testing it in the real world. This presents an ideal opportunity to test plant and maintenance issues early in the design phase, enabling plant engineers to compare, for example, how modifications in scheduling, downtime and maintenance strategies might reduce cost...

By Joseph McMullen, Invensys Operations Management

12/01/2009


Simulation software enables plant designers to view design scenarios in a virtual world without the expense, time delay and risk of testing it in the real world. This presents an ideal opportunity to test plant and maintenance issues early in the design phase, enabling plant engineers to compare, for example, how modifications in scheduling, downtime and maintenance strategies might reduce costs during the process lifecycle.

 

Steady-state simulation

Steady-state simulation software is used in the conceptual and basic design phases of the plant life cycle. It helps engineers understand the process, as well as the underlying environmental, maintenance and business ramifications of different configurations.

 

Decisions made during the design phase will have the greatest impact on the long-term economic viability and environmental sustainability of a process; all aspects must be considered. Conceptual design offers the first opportunity to create a working sustainable process, which engineers can enhance during the detailed design phase using standard design practices such as heat recovery or their company’s proprietary optimization practices.

 

It is important to run numerous case studies on each piece of process equipment individually, and within the constraints of the entire process. Steady-state simulation allows case studies such as distillation feed location, heat exchanger design and various heat integration scenarios. Case studies should include equipment sizing and repair considerations such as scheduling and implications of off-line equipment.

 

Dynamic simulation

Dynamic simulation tests responses prior to plant commissioning, demonstrating how a process starts up and operates. This verifies that it is safe and can operate under a variety of conditions, including startup, shutdown and abnormal conditions. This is the time to study plant operation strategies to reduce waste.

 

Plant control systems and control logic should be tested virtually using dynamic simulation to ensure correct response. Control system checkout using dynamic simulation ensures proper system and plant behavior and safe operation.

 

Dynamic simulation must also include scenarios for process upsets. Scenarios to test include a fire or explosion, a disruption or change in process feed, valve/piping failure, equipment failure, out-of-service equipment and repair downtime. Testing reveals the quickest path to return a process to normal operation.

 

Online performance monitoring, optimization

 

While steady state and dynamic simulation software can help create and test operational processes, online optimization software provides a higher level review of plant operating status over time. This involves bringing in data from the IT systems, reconciling that data and optimizing performance based on the limits provided by the operator in the control room.

 

Success in this area results from good interdepartmental communication and cooperation. Engineers and managers need to work with their IT department to ensure that proper data is linked to the software, and work with the process engineering department to ensure the correct variables are measured. They must work with control engineers to ensure that the system is properly configured, and work with operators and management to ensure that there is plant-wide support for the decision. Implementing optimization software results in increased profit, smooth operation and maintenance and increased environmental friendliness by reducing waste and unneeded utilities.

 

Of these three types of simulation software, steady state and dynamic provide the best opportunities to include maintainability in the design process. The early stages of process definition and setup are the best times to start testing the implications of maintenance schedules, equipment malfunction, repair, replacement and downtime.

 

Simulation can help with early planning for plant equipment maintenance.

 

 

 

 

Author Information

Joseph McMullen has been a product manager for Invensys Operations Management, SimSci-Esscor Business Line Management group since 2006. He joined SimSci-Esscor in 2001 as a senior technical support engineer and account manager.

 



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. The 2012 Top Plant winners have been named.
In 2012, Plant Engineering's Product of the Year program will celebrated its 25th anniversary. Read about the 2012 winners and nominate for 2013.
The Leaders Under 40 program features outstanding young people who are making a difference in manufacturing. View the 2012 Leaders here.
Investment in excellence: One plant's improved productivity and quality was repaid when their company expanded the facility
Strategic uptime, Increased capacity goes right to the bottom line
2013 Forecast Issue: A shift in manufacturing
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Alarm management tips, Power management, Building automation
Estimating data center PUE, Design tips for cost savings, Networked controls, NFPA 70E
Attacking Energy Costs: Strategies for showing financial return on energy management investments

2012 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results


Poll of the Week

What category most helps you select new products?
Recommendation from colleagues
Product of the Year winners
Supplier information
Trade show visit


Click Here for Poll Archives
Sponsored by:

About Us | Contact Us | Advertise | Subscribe to Magazine | Site Map | Privacy Policy
Home | Channels | New Products | Media Library | Connect | Industry News | Events and Awards | Newsletters | Blogs | Magazine
Control Engineering | Plant Engineering | Consulting-Specifying Engineer
All content copyright © 2010-2013 CFE Media. All rights reserved.