Paper mill robot applies labels

Case study: New labeling robot installation at paper mill completed in 12 hours. Kuka Robotics and Optima Control Solution deliver maximum reliability for an automation system integration project.

Hristina Stefanova

09/04/2012


Optima Control Solutions Ltd., a system integrator, programmed, installed, and commissioned the new robot; a Kuka Robotics KR 30 F is shown. Courtesy: Optima Control SolutionsA paper manufacturer deployed industrial robots for label application to its finished products, continuing industrial innovations to maximize productivity in recent years. The company’s Flintshire, U.K.-based paper mill faced reliability problems with one of the robots functioning on-site.

The automation engineer involved noted that the label applicator robot had become increasingly unreliable over several years, resulting in a number of unacceptable breakdowns. An 8-hour downtime can halt mill production. Deteriorating robot reliability was critical and warranted the purchase of a new robot.

Engineers presented user specifications to several robotics companies. Mark Fisher, project engineer at Kuka Robotics, said after meeting requirements capabilities and cost, customer support during the project also helped. Kuka Robots employed a 3G router and ensured that remote robot diagnostics are possible via LogMeIn (a remote control desktop website). The most challenging part of the project was calculating the arc the robot had to take relative to the roll diameter and width sent over the industrial network by the PLC, Fisher said.

Robots that have shorter lifting distances and longer reach due to the low base frame help reduce cycle times in machine tending tasks, according to Kuka Robotics. Courtesy: Optima Control SolutionsFor the project, Kuka partnered with Optima Control Solutions Ltd., a system integrator, for programming, installing, and commissioning the new robot. Optima integrated the new robot with the existing machine control system.

Stephen Carradice, Optima’s system design engineer, engineered and commissioned the robot control software and arranged integration between the existing Siemens S7 PLC and the new robot controls using a Profibus communications interface. The mill engineer noted that the complex installation was completed in 12 hours.

Application update: The new robot is functioning at 100%, according to last report, and other automation projects are planned.

- Hristina Stefanova is with Optima Control Solutions Ltd. Edited by Mark T. Hoske, content manager CFE Media, Control Engineering, Plant Engineering, and Consulting-Specifying Engineer, mhoske(at)cfemedia.com.

www.optimacs.com 

www.kuka-robotics.com/india/en/products/industrial_robots/special/foundry_robots/kr30_3_f/ 

See other Control Engineering robotic case studies and news.



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. The 2012 Top Plant winners have been named.
In 2012, Plant Engineering's Product of the Year program will celebrated its 25th anniversary. Read about the 2012 winners and nominate for 2013.
The Leaders Under 40 program features outstanding young people who are making a difference in manufacturing. View the 2012 Leaders here.
Investment in excellence: One plant's improved productivity and quality was repaid when their company expanded the facility
Strategic uptime, Increased capacity goes right to the bottom line
2013 Forecast Issue: A shift in manufacturing
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Alarm management tips, Power management, Building automation
Estimating data center PUE, Design tips for cost savings, Networked controls, NFPA 70E
Attacking Energy Costs: Strategies for showing financial return on energy management investments

2012 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results


Poll of the Week

What category most helps you select new products?
Recommendation from colleagues
Product of the Year winners
Supplier information
Trade show visit


Click Here for Poll Archives
Sponsored by:

About Us | Contact Us | Advertise | Subscribe to Magazine | Site Map | Privacy Policy
Home | Channels | New Products | Media Library | Connect | Industry News | Events and Awards | Newsletters | Blogs | Magazine
Control Engineering | Plant Engineering | Consulting-Specifying Engineer
All content copyright © 2010-2013 CFE Media. All rights reserved.