Optimum performance standards/processes

Successful projects follow performance standards from project start to end.

03/13/2013


This list focuses on a few of the standards that are often overlooked entirely or that should be examined more carefully.

1. Air Barrier Performance Standard

Controlling the air leakage in buildings is one of the most basic, yet critical, details needed if a building is to have a low energy quotient. Properly detailed and constructed, this one item can reduce the heat load by one-third (See: Westford House, Joe Lstiburek, PhD, Building America, ASHRAE Journal Dec. 2008).

Standard: ASHRAE Standard 90.1-2010, 5.4. The assembly of materials shall not exceed 0.04 cfm/sq ft under a pressure differential of 0.3 in. w.g. (water gauge) when tested in accordance with ASTM E 2357, 1677, 1680, and E283.  

2. Fenestration

This is the amount of window area and the window’s engineering, aesthetic characteristics, and glare to be addressed against an economic sensitivity test of performance versus cost. (See AEDG Implementation Recommendations: Daylighting Window Designs for more details.)

Standard: A lifecycle cost analysis (LCCA) should be performed to balance the heating and cooling impact to the savings from the daylight harvesting.

3. Maximize LEDs

LED lights are most effective in hallways and places where lights operate 24/7 or for the maximum hours of the building occupancy.

Standard: There is no standard provision requiring LED. The best practice is to perform a LCCA to determine the optimal light fixture selection. (See a webinar offered by the Energy Center of Wisconsin for more information.)

4. Roof albedo

Albedo, or solar reflectance, is a measure of a material’s ability to reflect sunlight. A cool roof is one that exhibits high albedo and offers immediate benefits, including reduced energy costs. (See Cool Roof Ratings Council’s “Other Cool Roof Codes and Programs” and the U.S. Dept of Energy’s “Guidelines for Selecting Cool Roofs.”)

Standard: ASHRAE 90.1-2010 part 5.5.3.1.1 with solar reflectance and thermal emittance standards

5. Electrical sizing of conductors

Electrical conductors should be properly sized. Oversizing is a waste of resources with very little, if any, benefit.

Standard: Electrical sizing of conductors shall be designed per NFPA 70: National Electrical Code. Main switch boards and service entrances shall be sized per NEC 2011 for the AIC using information from the utility for the transformer, or if the information is not available, via a calculation based upon the minimum impedance allowed by code.

Resource: Stallcup's  Electrical Design Book, 2011 Edition, James G. Stallcup, author.

6. Transformers, based on  load factor

Many engineers and owners believe that a dry type transformer with an 80 C rise is more efficient than the 150 or 115 C construction. The best practice is to relate the temperature design rise to the load factor. This small detail can increase the efficiency of a building by 1%.

Standard: Dry type—the design temperature rise of 150, 115, or 80 C shall be based upon the load factor of <35%, <50%, or >50%, respectively. Minimum efficiencies shall be per NEMA TP-1 and EPACT 2005.

Resource: Dry Type Transformers, Codes and Standards Enhancement (CASE) Study, Pacific Gas & Electric, Author: Patrick Eilert.

7. Grounding details, in which all grounds bond together

The purpose is to prepare a design that bonds the grounds to a common point; this will establish a common ground reference. This practice is critical for proper operation of low-voltage controls.

Standard: NEC 2011. All individual grounds shall bond back to a common bus.

Resource: Stallcup's Electrical Bonding and Grounding Simplified NEC 2008 by James G. Stallcup

8. Accessibility to equipment for maintenance

Required clearance and design criteria shall be shown on the contract drawings.

Standard: Equipment shall have accessibility as required by building codes, equipment manufacturer, or the owner's project requirements in the commission plan.

9. Ventilation standard

The basis of design, the control sequences, and the logic necessary to achieve the ventilation requirements will be shown on the drawings.

Per ASHRAE Standard 62.1-2010, the ventilation standards used shall be shown. This shall include the Ev (ventilation effectiveness) values and any adjustments used, for example, charcoal filters, gas measurement, etc.

10. Demand control ventilation (DCV)

Buildings need to be properly ventilated without being wasteful. To minimize over-ventilation, direct measurement of CO2 can be monitored and the outdoor air quantity adjusted to achieve a good balance.

Standard: As required by ASHRAE 90.1-2010 part 6.4.3.9 for high -occupancy areas.

11. Formaldehyde-free materials

Formaldehyde can cause scratchy throats, headaches, and dry eyes. With the proper selection of materials, the source of these issues can be eliminated. Use inorganic materials so mold can’t grow.

Standard: While there is no reference or standard for using formaldehyde-free materials, there is no longer a cost premium for these products.

12. The systems manual

This document assembles the information about the design and operation of the building. As a best practice, the requirements for the systems manual will be in the specifications and will be a deliverable to the owner.

Reference ASHRAE Guide line 0-2005 and ASHRAE Guideline 4-2008.


Paul Levy is a commissioning consultant at Kirlin Mechanical Services. He has 30 years of experience in large, complex mechanical construction system installations and operations, and serves on ASHRAE technical committees. 



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
The true cost of lubrication: Three keys to consider when evaluating oils; Plant Engineering Lubrication Guide; 11 ways to protect bearing assets; Is lubrication part of your KPIs?
Contract maintenance: 5 ways to keep things humming while keeping an eye on costs; Pneumatic systems; Energy monitoring; The sixth 'S' is safety
Transport your data: Supply chain information critical to operational excellence; High-voltage faults; Portable cooling; Safety automation isn't automatic
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Maintaining low data center PUE; Using eco mode in UPS systems; Commissioning electrical and power systems; Exploring dc power distribution alternatives
Synchronizing industrial Ethernet networks; Selecting protocol conversion gateways; Integrating HMIs with PLCs and PACs
Why manufacturers need to see energy in a different light: Current approaches to energy management yield quick savings, but leave plant managers searching for ways of improving on those early gains.

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.