Not all integration is created equal

To be a plant engineer is to realize the wonderful benefits of a well-automated production system – and to suffer the problems caused by a poorly designed control system. So, what makes one automation system better than another?

06/15/2008


To be a plant engineer is to realize the wonderful benefits of a well-automated production system %%MDASSML%% and to suffer the problems caused by a poorly designed control system. So, what makes one automation system better than another? And, when implementing a control system, how do you ensure you’re getting the best system for the money?

When it comes to specifying and purchasing automation services and equipment, one of the most frustrating aspects for any plant engineer is the nagging question of not knowing whether they are getting what they paid for. Questions might include: “Is this a highly specialized service?” or “Am I paying too much for a commodity I could get anywhere?”

The answer lies in the procedures and methods used when designing the system.

Large or small, any control system project carries some risk to the owner. To mitigate this risk, projects must be completed on time and within budget to ensure profitability and prevent delays and unnecessary downtime.

At Bachelor Controls, we have found three things that contribute to a well-designed control system: proper planning, contingency management and extensive validation and testing.

Project planning, information gathering

Our engineers and programmers seek to achieve good communication with clients throughout all phases of a project, with an emphasis on gathering as much information as we can from the beginning. We begin by interviewing groups and individuals who will be influenced by the result of our design efforts. This typically includes system operators, engineers, managers, IT personnel and maintenance personnel.

This deliberate, up-front communication with stakeholders allows us to determine the client’s process and how that process relates to the client’s business and project goals. With a better understanding of the project needs, we can develop a detailed description (or functional specification for more complex projects) that defines exactly what we wish to accomplish.

Contingency management

A well-designed functional specification equips the project team with a defined scope of services and project plan for managing and completing the project successfully.

With this information in hand, the project team must plan for all potential contingencies. This can be an especially difficult transition for traditional programmers moving to the controls environment. In traditional “IT-type” programming, the programmer can control the data. However, in a production environment, the system must respond to whatever data real equipment working in the real world in real time gives it. It is often this need to account for so many real-world contingencies that separates a quality, reliable system from an unreliable system.

Unfortunately, a system may appear to work upon implementation, but if the system cannot account for all abnormalities, it may be unreliable under real-world conditions. Even an unreliable system that works under most conditions will give a plant engineer a certain level of frustration and could cost the client a great deal of money in wasted product and/or downtime expense.

Extensive validation, testing

So, how do you ensure a system accounts for all the potential contingencies?

Simply put, an untested system is just that %%MDASSML%% untested. For a control system to be reliable, it must undergo testing and validation according to a structured, written plan. Without this structured methodology, an integrator can skip a few things and still produce a system that appears to work.

Documentation and extensive testing are an integral part of ensuring that the design meets all the project needs, as well as accounting for any unforeseen complications and/or conflicts. Following design development, a Factory Acceptance Test (FAT) should be conducted. A FAT allows the client to participate in a simulation and validation of the control system before it is installed at the site. This is the first real opportunity to validate that the integrator provided what was stated in the functional specification, and it reduces surprises onsite. Simulation saves time and money during start-up and ensures that the system will function effectively when abnormal situations arise.

Project follow-through, start-up

Once the system is tested, simulated and approved by the client, it is time to integrate the system onsite. Many factors can influence start-up. This is where all the up-front information gathering, continuous documentation and exhaustive testing truly pay big dividends. Early preparation and prior testing procedures mitigate problems and eliminate costly, time-consuming work onsite.

Projects can be “thrown together” for less effort and without the future of the client in mind, but you usually sacrifice the quality of the outcome when you do. When leveraging a proven, structured project methodology such as this, clients receive the best value from project planning through start-up.

Eliminating bumps in the road

We often hear those in our industry bemoan the “inevitable problems” of every project. We are also often asked how we respond when things don’t go as planned, “because every project has surprises.” However, our philosophy %%MDASSML%% and the philosophy of many other successful system integrators %%MDASSML%% is that every project does not have to have any significant, project-threatening problems. In fact, almost any project can go very smoothly when there is adherence to a structured project methodology that emphasizes up-front planning and information gathering, well-conceived contingency management and extensive validation and testing.

For more information about system integration services, or to find a system integrator certified and audited against industry benchmarks and best practices, visit the Control System Integrators Association (CSIA) at www.controlsys.org .


Author Information

Ray Bachelor, PE is president and founder of Bachelor Controls Inc. (BCI). A certified member of the CSIA, BCI was named 2008 System Integrator of the Year by Control Engineering magazine.




No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Leaders Under 40 program features outstanding young people who are making a difference in manufacturing. View the 2013 Leaders here.
The new control room: It's got all the bells and whistles - and alarms, too; Remote maintenance; Specifying VFDs
2014 forecast issue: To serve and to manufacture - Veterans will bring skill and discipline to the plant floor if we can find a way to get them there.
2013 Top Plant: Lincoln Electric Company, Cleveland, Ohio
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Bring focus to PLC programming: 5 things to avoid in putting your system together; Managing the DCS upgrade; PLM upgrade: a step-by-step approach
Balancing the bagging triangle; PID tuning improves process efficiency; Standardizing control room HMIs
Commissioning electrical systems in mission critical facilities; Anticipating the Smart Grid; Mitigating arc flash hazards in medium-voltage switchgear; Comparing generator sizing software

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.