New insight: Quality management application sets up visual cues for improving processes

When Power-One agreed to be a beta tester for the Process Flow Visualization quality management application, the results were surprising. That’s because the solution offers new insight to production operations by collecting data on each part as it passes through the production process, and converting the data into charts and graphs that point out underlying causes of product quality issues.

12/02/2008



When Power-One agreed to be a beta tester for a new quality management application, the results were surprising.

“When we saw our own data in the beta product, we realized we were getting insight we’d never [seen] before,” recalls Chris Rodriguez, strategic planning manager for global test engineering at the Camarillo, Calif.-based manufacturer of power conversion devices.

This new application—Process Flow Visualization—was developed by SigmaQuest , which supplies a range of quality management solutions in the on-demand deployment model. SigmaQuest CEO Nader Fathi says Process Flow Visualization gives manufacturers new insight to production operations because it collects detailed data on each part as it passes through the production process, and then converts that data into easy-to-read charts and graphs that point out the underlying causes of any product quality issues.

In essence, says Fathi, “You can start a batch of a thousand parts off on Monday, and see, one by one, what stage they had reached by Friday, and the route that they had traveled to get there—including test failures, rework, and at which point in the process those reworked parts rejoined the flow.”

It’s then possible to drill down into the underlying data, and determine how and why apparent anomalies occurred—along with test transaction data highlighting why tests were failed, how many times tests were repeated, yield indicators at each stage in the process, and if any parts skipped testing altogether.

This is the type of information that came as a revelation to Power-One, which had been using SigmaQuest quality management applications since 2006.

“We saw product flows that we didn’t know existed—product being moved from a test station on Line B, for instance, to see if it would pass there, after already failing at the equivalent test station on Line A,” Rodriguez says. “You can’t see that kind of thing so readily in static data. You have to see the actual product flows to see what’s been going on.”

At a stroke, he relates, it became possible for management to understand why overtime levels were persistently high on some lines, and why certain parts of the plant floor struggled to meet production goals despite careful capacity planning and theoretically ample TAKT times.

“Some test stations were more popular than others because individual operators had their own favorites, and the line balancing and capacity planning calculations didn’t take that into account,” Rodriguez explains.

Rework and retesting also seemed to take place on certain stations in preference to others. The result: Even as some line stations sat idle, backlogs were building up at others—necessitating overtime work.

That has since changed. Aware of the problem, engineers have been able to drill down to the root causes of the choice of line stations, calibrating and fine-tuning them to eliminate operator preference as a scheduling factor.

“Overtime has definitely come down, and we’re meeting our numbers more consistently,” reports Rodriguez.

Just as important, the company knows its products are being built and tested as intended. “Being able to see product flows as they occur provides a real assurance of process-flow integrity,” Rodriguez concludes.





No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
The true cost of lubrication: Three keys to consider when evaluating oils; Plant Engineering Lubrication Guide; 11 ways to protect bearing assets; Is lubrication part of your KPIs?
Contract maintenance: 5 ways to keep things humming while keeping an eye on costs; Pneumatic systems; Energy monitoring; The sixth 'S' is safety
Transport your data: Supply chain information critical to operational excellence; High-voltage faults; Portable cooling; Safety automation isn't automatic
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Maintaining low data center PUE; Using eco mode in UPS systems; Commissioning electrical and power systems; Exploring dc power distribution alternatives
Synchronizing industrial Ethernet networks; Selecting protocol conversion gateways; Integrating HMIs with PLCs and PACs
Why manufacturers need to see energy in a different light: Current approaches to energy management yield quick savings, but leave plant managers searching for ways of improving on those early gains.

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.