SERCOS is a digital motion control bus for motion controls, drives, I/Os, sensors and actuators for numerically controlled machines and systems. Learn more.

According to the group SERCOS International , a specification for an encoder profile for the SERCOS III real-time Ethernet protocol is being developed in consultation with users and suppliers and will be available in November 2009. In parallel, a conformance test is being developed to ensure interoperability of different devices.

SERCOS (SErial Real-time COmmunication System) is a digital interface for communication between controls, drives and decentralized peripherals. In the first and second generation SERCOS interfaces, absolute and incremental encoders were connected to the servo drives or to the control system via a separate fieldbus, and not directly to the real-time bus. Because of the universal use of real-time Ethernet-based SERCOS III, there has been a demand to directly integrate encoders into a SERCOS

The new encoder profile ensures that the functions of an encoder– absolute or relative – are made available via clearly defined vendor-independent interfaces. The profile defines the functions supported by a device and how these functions may be used by other devices, such as control systems or servo drives.

Peter Lutz, managing director of SERCOS International, perceives the encoder profile as a very important extension to the existing profiles for servo drives and decentralized I/Os. “When defining the profile, we are considering existing parameters for encoders built into servomotors that are already part of the SERCOS drive profile. We are also making sure that the requirements of the encoder manufacturers are incorporated, especially with regard to their experience with existing, comparable device profiles of other bus systems.“

History 1, 2, 3 : SERCOS I was internationally standardized in 1995, and the faster and more flexible SERCOS II was standardized in 1999. With the third generation, SERCOS III, speed is again increased, and it enables use of both fiber optic and CAT-5 copper cables. SERCOS III transfers data packets via the Ethernet and the TCP/IP protocol, and includes numerous safety functions in combination with a full-duplex transmission to assure trouble-free real-time operation of the communication system.

www.sercos.com

– Edited by Renee Robbins , senior editor
Control Engineering News Desk
Register here to select your choice of eNewsletters free.





No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Leaders Under 40 program features outstanding young people who are making a difference in manufacturing. View the 2013 Leaders here.
The new control room: It's got all the bells and whistles - and alarms, too; Remote maintenance; Specifying VFDs
2014 forecast issue: To serve and to manufacture - Veterans will bring skill and discipline to the plant floor if we can find a way to get them there.
2013 Top Plant: Lincoln Electric Company, Cleveland, Ohio
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Bring focus to PLC programming: 5 things to avoid in putting your system together; Managing the DCS upgrade; PLM upgrade: a step-by-step approach
Balancing the bagging triangle; PID tuning improves process efficiency; Standardizing control room HMIs
Commissioning electrical systems in mission critical facilities; Anticipating the Smart Grid; Mitigating arc flash hazards in medium-voltage switchgear; Comparing generator sizing software

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.