Building Envelope Testing (BET) is the process of testing a building air barrier, water barrier and thermal barrier. This presentation reviews the new NEBB BET guideline and review how BET should be specified and how it is performed. This presentation also reviews the business case for BET and review what work is available to providers.

> > Download the presentation

Jim Bochat, President, Commissioning Concepts. Courtesy: NEBBPresenter: Jim Bochat, President, Commissioning Concepts

Jim Bochat has been involved in the Arizona engineering and construction industry for over forty years. His experience includes mechanical design, mechanical construction, controls, test and balance, commissioning, and retro-commissioning.

Bochat is a former NEBB President and has been instrumental in developing and teaching commissioning standards for NEBB. He is a Life Member of ASHRAE and serves on the GPC-30, GL1.2, PMP Project Committee and Certification committees. He also chairs the ASHRAE PMP Best Practices committee and recently served on the ABBA Whole Building Tightness Committee. He has been a NEBB Certified professional since 1974 and has co-authored several standards regarding Commissioning for NEBB, ASHRAE, and ABBA. He is a past Chairman of the NEBB Commissioning Committee and is an instructor for NEBB’s Commissioning and Retro-commissioning Programs. He has taught the NEBB certification program throughout the U.S. and in Australia.

Bochat was presented the George B. Hightower Award for his distinguished service to NEBB at the 2010 NEBB Annual meeting. The George B. Hightower Award is NEBB's most prestigious honor and is presented periodically to people who have made special contributions to the success of NEBB.

Presentation provided by the National Environmental Balancing Bureau (NEBB).


No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Leaders Under 40 program features outstanding young people who are making a difference in manufacturing. View the 2013 Leaders here.
The new control room: It's got all the bells and whistles - and alarms, too; Remote maintenance; Specifying VFDs
2014 forecast issue: To serve and to manufacture - Veterans will bring skill and discipline to the plant floor if we can find a way to get them there.
2013 Top Plant: Lincoln Electric Company, Cleveland, Ohio
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Bring focus to PLC programming: 5 things to avoid in putting your system together; Managing the DCS upgrade; PLM upgrade: a step-by-step approach
Balancing the bagging triangle; PID tuning improves process efficiency; Standardizing control room HMIs
Commissioning electrical systems in mission critical facilities; Anticipating the Smart Grid; Mitigating arc flash hazards in medium-voltage switchgear; Comparing generator sizing software

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.