Navistar International Corporate Headquarters

Navistar International Corporate Headquarters; Environmental Systems Design Inc. (ESD)

08/09/2012


This was the existing CFD model of the fifth-floor perimeter condition. Subsequent iterations were performed to mitigate existing solar insolation deficiencies. Courtesy: ESD (Click to enlarge)Project name: Navistar International Corporate Headquarters

Location: Lisle, Ill.

Firm name: Environmental Systems Design Inc. (ESD)

Project type, building type: Other, office

Project duration: 1 year

Project completion date: Oct. 3, 2011

Project budget for mechanical, electrical, plumbing, fire protection engineering only: $42.8 million

Engineering challenges

Navistar International needed to consolidate its North American This CFD model shows the proposed perimeter mechanical and architectural modifications. Courtesy: ESD (Click to enlarge)headquarters and engineering centers from multiple office locations to one campus. Located in Lisle, Ill., the former Alcatel-Lucent campus consisted of approximately 1,200,000 sq ft in nine existing buildings. Environmental Systems Design Inc. (ESD) provided the consulting engineering design and construction field observation services necessary to successfully execute the consolidation. The project involved a mixture of existing buildings that required renovation, along with the new construction of a design center and vehicle review center. The nine existing buildings consisted of five that were constructed a little over 20 years ago and the remaining built approximately 10 years later. The mixture of these buildings made centralizing the campus’s operation systems a challenge. In addition to the scale and complexity of the project, ESD was faced with an aggressive 11-month schedule. Another challenge involved the signature building on campus. It includes a curved glass design feature on the fifth floor with extreme solar gain attributes. When the building was used by Alcatel-Lucent, the employees on the fifth floor used to have to wear shorts year-round. Navistar wanted to make certain its employees would have a consistent level of comfort on the fifth floor throughout the year.

Solutions

ESD’s solution to the aggressive schedule and complexity of the Navistar project was the utilization of multiple project teams. In order to provide the same level of consistency one project team would offer, ESD utilized an internal quality assurance team during the redevelopment and design. Along with internal coordination among the team managers, ESD frequently met with end-user groups and the owner’s representative in order to assure the construction of the appropriate specialty spaces. ESD engineered a control system upgrade and central building automation to tie all the construction together. To coordinate replacement of equipment, such as air handling units in small spaces, ESD utilized the 3-D modeling software, Revit. Regarding the signature building’s notorious fifth floor, computational fluid dynamics (CFD) and solar modeling were used to test shading and HVAC options to reduce solar gain and provide a comfortable, productive work environment. The solution developed by ESD has mitigated the solar gain heat issue so well that last summer, after anticipating greater solar gain, the building’s engineer received the first cold call from a fifth-floor occupant.

Existing solar traces in the fifth-floor perimeter are shown. Courtesy: ESD (Click to enlarge)This image shows the proposed solar traces in the fifth-floor perimeter. Courtesy: ESD (Click to enlarge)ESD made architectural modifications to the floor solar insolation.Courtesy: ESD (Click to enlarge)



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Leaders Under 40 program features outstanding young people who are making a difference in manufacturing. View the 2013 Leaders here.
The new control room: It's got all the bells and whistles - and alarms, too; Remote maintenance; Specifying VFDs
2014 forecast issue: To serve and to manufacture - Veterans will bring skill and discipline to the plant floor if we can find a way to get them there.
2013 Top Plant: Lincoln Electric Company, Cleveland, Ohio
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Why manufacturers need to see energy in a different light: Current approaches to energy management yield quick savings, but leave plant managers searching for ways of improving on those early gains.
Electric motor power measurement and analysis: Understand the basics to drive greater efficiency; Selecting the right control chart; Linear position sensors gain acceptance
Protecting standby generators for mission critical facilities; Selecting energy-efficient transformers; Integrating power monitoring systems; Mitigating harmonics in electrical systems

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.